Back to app index

Solway Firth Tunnel — “Local data → Global WBS” via sheaves (prototype)

Toy scenario

Three small compatibility models: (i) discrete risk choices constrained by inequalities, (ii) local views of one headcount-over-time function, and (iii) linear interface offsets with a cycle-sum obstruction test.
Nothing here is “project truth”: it’s a minimal canvas to test the patching/obstruction pipeline.
Canvas
Risk choices (discrete)
Resources (function-valued)
Obstruction (H¹ / 1‑cocycles)
—
task task fixed by constraints multiple feasible values constraint conflict
Selected task (local stalk)
Edit local risk data
Risk values (comma-separated ints):
Probabilities (comma-separated, same length; auto-normalised):
Selected dependency (constraint)
Edit compatibility inequality
Interpretation: downstream ≥ upstream + Δ
Δ =
Output
(click a node or edge; then “Solve compatible risk choices”)