{
  "scope": "Explicit correspondences reviewed against the identifiers, types, roles and relationships in these two synthetic source snapshots. No label-based fallback or claim about real-world identity.",
  "sources": {
    "d3_sha256": "41c8f316be2a8e97cc792854adb1bf1e294734763b31ef08b89e0d898cacfc03",
    "ontology_sha256": "7d762459645979952cd0b9ecf0b134e5720b321eebabfa707374b3d538a01944"
  },
  "mappings": [
    {
      "d3_id": "SolwayTunnel",
      "ontology_local": "solwayTunnel",
      "ontology_class": "SolwayTunnel",
      "d3_group": "Entity",
      "basis": "The single tunnel with identifier STN-2025 and the three Scottish, undersea and English sections."
    },
    {
      "d3_id": "TunnelSection1",
      "ontology_local": "section1",
      "ontology_class": "TunnelSection",
      "d3_group": "Entity",
      "basis": "Scottish approach, first of the tunnel sections; has bore1 and lining1."
    },
    {
      "d3_id": "TunnelSection2",
      "ontology_local": "section2",
      "ontology_class": "TunnelSection",
      "d3_group": "Entity",
      "basis": "Main undersea section, second of the three sections of this tunnel."
    },
    {
      "d3_id": "TunnelSection3",
      "ontology_local": "section3",
      "ontology_class": "TunnelSection",
      "d3_group": "Entity",
      "basis": "English approach, third of the three sections of this tunnel."
    },
    {
      "d3_id": "TunnelBore1",
      "ontology_local": "bore1",
      "ontology_class": "TunnelBore",
      "d3_group": "Entity",
      "basis": "Bore of Scottish section 1, created by the main TBM excavation."
    },
    {
      "d3_id": "TunnelLining1",
      "ontology_local": "lining1",
      "ontology_class": "TunnelLining",
      "d3_group": "Entity",
      "basis": "Lining of section 1, containing segment1 and protected by membraneWaterproofing."
    },
    {
      "d3_id": "LiningSegment1",
      "ontology_local": "segment1",
      "ontology_class": "LiningSegment",
      "d3_group": "Entity",
      "basis": "A-type segment in lining1, made of highStrengthConcrete."
    },
    {
      "d3_id": "HighStrengthConcrete",
      "ontology_local": "highStrengthConcrete",
      "ontology_class": "Concrete",
      "d3_group": "Material",
      "basis": "Concrete used for segment1 and paired with the waterproofing material."
    },
    {
      "d3_id": "MembraneWaterproofing",
      "ontology_local": "membraneWaterproofing",
      "ontology_class": "Waterproofing",
      "d3_group": "Material",
      "basis": "HDPE membrane protecting lining1 and paired with the same concrete."
    },
    {
      "d3_id": "TBMExcavation",
      "ontology_local": "tbmExcavation",
      "ontology_class": "ExcavationProcess",
      "d3_group": "Process",
      "basis": "Main-drive excavation creating bore1 and depending on sitePreparation."
    },
    {
      "d3_id": "EngineeringConsultant",
      "ontology_local": "engineeringConsultant",
      "ontology_class": "EngineeringFirm",
      "d3_group": "Agent",
      "basis": "Named design partner linked to the tunnel contractor; the ontology gives its Lead Designer role."
    },
    {
      "d3_id": "TunnelDesign",
      "ontology_local": "designDoc",
      "ontology_class": "TunnelDesign",
      "d3_group": "Information",
      "basis": "Detailed design document referring to the geotechnical report and referenced by the construction plan."
    }
  ]
}
