{
  "schema_version": "powell.handover.v1",
  "protocol": "Enough to hand over? Frozen executable protocol, 20 October 2026.\n\nQUESTION. Does the existing shuttle state (review time, posterior demand belief)\nremain adequate when a recipient continues under a cumulative survey-fee\nallowance? Which information does it omit for a later spending/provenance query?\n\nFIXED DESIGN (specified before this script's first scoring run).\n* Use exactly the six presets declared in evidence-ui.js and the payoff/default\n  values in evidence-model.js. Do not tune presets, histories or selection after\n  seeing results. Exact decimal input values are interpreted as rationals.\n* Preserve the original unconstrained contract as a control. The constructed\n  variation permits survey fees totalling at most two configured survey fees.\n  Waiting costs remain in the objective but do not consume this allowance.\n  When the survey fee is zero the allowance imposes no restriction.\n* Enumerate all positive-probability, uncommitted information histories,\n  including the empty history, final-review records, and off-optimal histories.\n  Original histories may use all originally legal acquisition actions.\n  Allowance comparisons use only histories already feasible under the allowance.\n  Histories are records, not independent samples or a probability distribution\n  over the deliberately enumerated acquisition choices.\n* Compare full-history continuation with (t,p) and (t,p,remaining allowance).\n  A common policy must be feasible and optimal after every hidden history in\n  its summary group, through all subsequent observations, not just agree on its\n  next action. Keep every exact optimal tie. Past costs are sunk in the stated\n  objective; compare remaining expected value, not totals mixing past costs.\n* For a shared (t,p), histories differ in remaining allowance only. A policy\n  feasible for all must respect the minimum allowance. All have the same future\n  signal probabilities and reward/cost law. Thus maximizing continuation value\n  at that minimum allowance maximizes the common value and minimizes maximum\n  regret. This is a full contingent-policy comparison, represented as a DAG.\n* Record reachability under any original optimal policy, and separately under\n  any allowance-optimal policy. A history is reachable only if every preceding\n  acquisition was optimal and each observation had positive probability.\n* Audit queries are (a) survey fees already incurred and (b) the complete ordered\n  acquisition/signal record. Their answers come from the history, not the oracle.\n* Report all preset counts and all mixed-allowance groups, including harmless\n  groups. Select a witness by greatest exact regret, then preset ID, then sorted\n  history IDs. Within it choose the lowest-budget history and a greatest-regret\n  history, breaking ties by history ID. No selected example determines totals.\n\nFALSIFIERS AND LIMITS. No positive-regret summary group means no demonstrated\nneed for an extra resource variable in this bank. Failure of (t,p) in the\noriginal model or (t,p,remaining allowance) in the constrained one indicates an\nimplementation error or an insufficient stated contract and must be resolved.\nIf every harmful group lacks original-optimal-reachable members, say so: this\nis not an observed failure of the original optimal policy. A budget constraint\nis authored, not discovered. Scores are exact finite-model consequences, not\nhuman learning, real transport outcomes, professional validation, or a new\ngeneral theorem. A separate checker must independently evaluate policies.\n\nCLARIFICATION AFTER INITIAL RUN (no change to calculations). The already\ncomputed original-optimal-only analysis restricts every group to histories\nreachable under original optimal policies before testing common continuation.\nOne original-optimal member in a mixed group does not establish ambiguity\nbetween two histories both generated by an original optimal policy.\n\nRun: python3 scripts/handover_experiment.py\nWrites only handover-results.json. Add --check to compare without writing.\nInputs and this protocol are hashed in output.\n",
  "source_sha256": {
    "evidence-model.js": "71e5f7d7297f2b2773ff444e427a6dd665a7134347e1ec5d4ef9badc24a6a707",
    "evidence-ui.js": "ee5e37967cf8d09ffbf1dba7a4f891cce87371865bfb6d06ec92d64bd213f35b",
    "scripts/handover_experiment.py": "750edffe9adcb415e3361bbe9daf78ff861a35994f426ce46d4cbbfb667b4892"
  },
  "quantity_format": "Numeric display fields have exact Fraction strings in *_exact companions.",
  "policy_semantics": "At each node, any listed optimal action followed by optimal choices at each positive-probability child forms an optimal contingent policy. Shared (t,p) groups use minimum remaining allowance; the same policy is feasible after every member and earns the same future expected value.",
  "summary": {
    "preset_count": 6,
    "original_histories": 172,
    "allowance_feasible_histories": 164,
    "original_time_belief_groups": 51,
    "time_belief_groups": 49,
    "augmented_groups": 61,
    "mixed_allowance_groups": 9,
    "harmful_groups": 1,
    "harmful_presets": [
      "sequential"
    ],
    "original_state_zero_regret": true,
    "augmented_state_zero_regret": true,
    "harmful_groups_if_original_optimal_history_is_known": 0,
    "spending_ambiguous_time_belief_groups": 9,
    "spending_ambiguous_augmented_groups": 0,
    "provenance_ambiguous_augmented_groups": 31,
    "max_regret": 4.5,
    "max_regret_exact": "9/2"
  },
  "presets": [
    {
      "id": "timely",
      "label": "Worth buying",
      "config": {
        "prior": 0.5,
        "accuracy": 0.8,
        "passive": 0.5,
        "cost": 4.0,
        "delay": 3.0,
        "deadline": 2,
        "latency": 1
      },
      "config_exact": {
        "prior": "1/2",
        "accuracy": "4/5",
        "passive": "1/2",
        "cost": "4",
        "delay": "3",
        "deadline": "2",
        "latency": "1"
      },
      "free_surveys_unconstrained": false,
      "original_root_policy_node": "timely:original:t0:p1_2:bunlimited",
      "allowance_root_policy_node": "timely:allowance:t0:p1_2:b8",
      "original_root_optimal_actions": [
        "test"
      ],
      "allowance_root_optimal_actions": [
        "test"
      ],
      "counts": {
        "original_histories": 21,
        "allowance_feasible_histories": 21,
        "original_optimal_reachable_histories": 3,
        "allowance_optimal_reachable_histories": 3,
        "original_time_belief_groups": 9,
        "time_belief_groups": 9,
        "augmented_groups": 10,
        "mixed_allowance_groups": 1,
        "harmful_groups": 0,
        "harmful_groups_with_original_optimal_reachable_member": 0,
        "harmful_groups_if_original_optimal_history_is_known": 0
      },
      "original_state_zero_regret": true,
      "augmented_state_zero_regret": true,
      "audit_time_belief": {
        "survey_spending_ambiguities": [
          [
            "timely:test+/test-",
            "timely:test-/test+",
            "timely:wait+/wait+",
            "timely:wait+/wait-",
            "timely:wait-/wait+",
            "timely:wait-/wait-"
          ]
        ],
        "ordered_evidence_ambiguities": [
          [
            "timely:wait+",
            "timely:wait-"
          ],
          [
            "timely:test+/test-",
            "timely:test-/test+",
            "timely:wait+/wait+",
            "timely:wait+/wait-",
            "timely:wait-/wait+",
            "timely:wait-/wait-"
          ],
          [
            "timely:test+/wait+",
            "timely:test+/wait-",
            "timely:wait+/test+",
            "timely:wait-/test+"
          ],
          [
            "timely:test-/wait+",
            "timely:test-/wait-",
            "timely:wait+/test-",
            "timely:wait-/test-"
          ]
        ]
      },
      "audit_augmented": {
        "survey_spending_ambiguities": [],
        "ordered_evidence_ambiguities": [
          [
            "timely:wait+",
            "timely:wait-"
          ],
          [
            "timely:wait+/wait+",
            "timely:wait+/wait-",
            "timely:wait-/wait+",
            "timely:wait-/wait-"
          ],
          [
            "timely:test+/wait+",
            "timely:test+/wait-",
            "timely:wait+/test+",
            "timely:wait-/test+"
          ],
          [
            "timely:test-/wait+",
            "timely:test-/wait-",
            "timely:wait+/test-",
            "timely:wait-/test-"
          ],
          [
            "timely:test+/test-",
            "timely:test-/test+"
          ]
        ]
      },
      "histories": [
        {
          "id": "timely:root",
          "t": 0,
          "history": [],
          "allowance_feasible": true,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": true,
          "survey_count": 0,
          "original_policy_node": "timely:original:t0:p1_2:bunlimited",
          "original_optimal_actions": [
            "test"
          ],
          "allowance_policy_node": "timely:allowance:t0:p1_2:b8",
          "allowance_optimal_actions": [
            "test"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": 8.0,
          "remaining_allowance_exact": "8",
          "path_likelihood_given_acquisition_choices": 1.0,
          "path_likelihood_given_acquisition_choices_exact": "1",
          "original_value": 17.5,
          "original_value_exact": "35/2",
          "allowance_value": 17.5,
          "allowance_value_exact": "35/2"
        },
        {
          "id": "timely:test+",
          "t": 1,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": true,
          "survey_count": 1,
          "original_policy_node": "timely:original:t1:p4_5:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "timely:allowance:t1:p4_5:b4",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.8,
          "posterior_exact": "4/5",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 3.0,
          "waiting_spent_exact": "3",
          "total_spent": 7.0,
          "total_spent_exact": "7",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.5,
          "path_likelihood_given_acquisition_choices_exact": "1/2",
          "original_value": 40.0,
          "original_value_exact": "40",
          "allowance_value": 40.0,
          "allowance_value_exact": "40"
        },
        {
          "id": "timely:test+/test+",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "timely:original:t2:p16_17:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "timely:allowance:t2:p16_17:b0",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.9411764705882353,
          "posterior_exact": "16/17",
          "survey_spent": 8.0,
          "survey_spent_exact": "8",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 14.0,
          "total_spent_exact": "14",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.34,
          "path_likelihood_given_acquisition_choices_exact": "17/50",
          "original_value": 54.11764705882353,
          "original_value_exact": "920/17",
          "allowance_value": 54.11764705882353,
          "allowance_value_exact": "920/17"
        },
        {
          "id": "timely:test+/test-",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "timely:original:t2:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "timely:allowance:t2:p1_2:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 8.0,
          "survey_spent_exact": "8",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 14.0,
          "total_spent_exact": "14",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.16,
          "path_likelihood_given_acquisition_choices_exact": "4/25",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "timely:test+/wait+",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "timely:original:t2:p4_5:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "timely:allowance:t2:p4_5:b4",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.8,
          "posterior_exact": "4/5",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 10.0,
          "total_spent_exact": "10",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 40.0,
          "original_value_exact": "40",
          "allowance_value": 40.0,
          "allowance_value_exact": "40"
        },
        {
          "id": "timely:test+/wait-",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "timely:original:t2:p4_5:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "timely:allowance:t2:p4_5:b4",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.8,
          "posterior_exact": "4/5",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 10.0,
          "total_spent_exact": "10",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 40.0,
          "original_value_exact": "40",
          "allowance_value": 40.0,
          "allowance_value_exact": "40"
        },
        {
          "id": "timely:test-",
          "t": 1,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": true,
          "survey_count": 1,
          "original_policy_node": "timely:original:t1:p1_5:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "timely:allowance:t1:p1_5:b4",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.2,
          "posterior_exact": "1/5",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 3.0,
          "waiting_spent_exact": "3",
          "total_spent": 7.0,
          "total_spent_exact": "7",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.5,
          "path_likelihood_given_acquisition_choices_exact": "1/2",
          "original_value": 9.0,
          "original_value_exact": "9",
          "allowance_value": 9.0,
          "allowance_value_exact": "9"
        },
        {
          "id": "timely:test-/test+",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "timely:original:t2:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "timely:allowance:t2:p1_2:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 8.0,
          "survey_spent_exact": "8",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 14.0,
          "total_spent_exact": "14",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.16,
          "path_likelihood_given_acquisition_choices_exact": "4/25",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "timely:test-/test-",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "timely:original:t2:p1_17:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "timely:allowance:t2:p1_17:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.058823529411764705,
          "posterior_exact": "1/17",
          "survey_spent": 8.0,
          "survey_spent_exact": "8",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 14.0,
          "total_spent_exact": "14",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.34,
          "path_likelihood_given_acquisition_choices_exact": "17/50",
          "original_value": 6.176470588235294,
          "original_value_exact": "105/17",
          "allowance_value": 6.176470588235294,
          "allowance_value_exact": "105/17"
        },
        {
          "id": "timely:test-/wait+",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "timely:original:t2:p1_5:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "timely:allowance:t2:p1_5:b4",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.2,
          "posterior_exact": "1/5",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 10.0,
          "total_spent_exact": "10",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 9.0,
          "original_value_exact": "9",
          "allowance_value": 9.0,
          "allowance_value_exact": "9"
        },
        {
          "id": "timely:test-/wait-",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "timely:original:t2:p1_5:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "timely:allowance:t2:p1_5:b4",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.2,
          "posterior_exact": "1/5",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 10.0,
          "total_spent_exact": "10",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 9.0,
          "original_value_exact": "9",
          "allowance_value": 9.0,
          "allowance_value_exact": "9"
        },
        {
          "id": "timely:wait+",
          "t": 1,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "timely:original:t1:p1_2:bunlimited",
          "original_optimal_actions": [
            "test"
          ],
          "allowance_policy_node": "timely:allowance:t1:p1_2:b8",
          "allowance_optimal_actions": [
            "test"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 3.0,
          "waiting_spent_exact": "3",
          "total_spent": 3.0,
          "total_spent_exact": "3",
          "remaining_allowance": 8.0,
          "remaining_allowance_exact": "8",
          "path_likelihood_given_acquisition_choices": 0.5,
          "path_likelihood_given_acquisition_choices_exact": "1/2",
          "original_value": 17.5,
          "original_value_exact": "35/2",
          "allowance_value": 17.5,
          "allowance_value_exact": "35/2"
        },
        {
          "id": "timely:wait+/test+",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "timely:original:t2:p4_5:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "timely:allowance:t2:p4_5:b4",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.8,
          "posterior_exact": "4/5",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 10.0,
          "total_spent_exact": "10",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 40.0,
          "original_value_exact": "40",
          "allowance_value": 40.0,
          "allowance_value_exact": "40"
        },
        {
          "id": "timely:wait+/test-",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "timely:original:t2:p1_5:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "timely:allowance:t2:p1_5:b4",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.2,
          "posterior_exact": "1/5",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 10.0,
          "total_spent_exact": "10",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 9.0,
          "original_value_exact": "9",
          "allowance_value": 9.0,
          "allowance_value_exact": "9"
        },
        {
          "id": "timely:wait+/wait+",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "timely:original:t2:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "timely:allowance:t2:p1_2:b8",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 6.0,
          "total_spent_exact": "6",
          "remaining_allowance": 8.0,
          "remaining_allowance_exact": "8",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "timely:wait+/wait-",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "timely:original:t2:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "timely:allowance:t2:p1_2:b8",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 6.0,
          "total_spent_exact": "6",
          "remaining_allowance": 8.0,
          "remaining_allowance_exact": "8",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "timely:wait-",
          "t": 1,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "timely:original:t1:p1_2:bunlimited",
          "original_optimal_actions": [
            "test"
          ],
          "allowance_policy_node": "timely:allowance:t1:p1_2:b8",
          "allowance_optimal_actions": [
            "test"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 3.0,
          "waiting_spent_exact": "3",
          "total_spent": 3.0,
          "total_spent_exact": "3",
          "remaining_allowance": 8.0,
          "remaining_allowance_exact": "8",
          "path_likelihood_given_acquisition_choices": 0.5,
          "path_likelihood_given_acquisition_choices_exact": "1/2",
          "original_value": 17.5,
          "original_value_exact": "35/2",
          "allowance_value": 17.5,
          "allowance_value_exact": "35/2"
        },
        {
          "id": "timely:wait-/test+",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "timely:original:t2:p4_5:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "timely:allowance:t2:p4_5:b4",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.8,
          "posterior_exact": "4/5",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 10.0,
          "total_spent_exact": "10",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 40.0,
          "original_value_exact": "40",
          "allowance_value": 40.0,
          "allowance_value_exact": "40"
        },
        {
          "id": "timely:wait-/test-",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "timely:original:t2:p1_5:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "timely:allowance:t2:p1_5:b4",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.2,
          "posterior_exact": "1/5",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 10.0,
          "total_spent_exact": "10",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 9.0,
          "original_value_exact": "9",
          "allowance_value": 9.0,
          "allowance_value_exact": "9"
        },
        {
          "id": "timely:wait-/wait+",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "timely:original:t2:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "timely:allowance:t2:p1_2:b8",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 6.0,
          "total_spent_exact": "6",
          "remaining_allowance": 8.0,
          "remaining_allowance_exact": "8",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "timely:wait-/wait-",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "timely:original:t2:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "timely:allowance:t2:p1_2:b8",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 6.0,
          "total_spent_exact": "6",
          "remaining_allowance": 8.0,
          "remaining_allowance_exact": "8",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        }
      ],
      "groups": [
        {
          "id": "timely:t0:p1_2",
          "preset_id": "timely",
          "t": 0,
          "history_ids": [
            "timely:root"
          ],
          "history_count": 1,
          "distinct_allowances": 1,
          "common_policy_node": "timely:allowance:t0:p1_2:b8",
          "common_optimal_actions": [
            "test"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "timely:root",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [
            "timely:root"
          ],
          "allowance_optimal_reachable_history_ids": [
            "timely:root"
          ],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": false,
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "minimum_remaining_allowance": 8.0,
          "minimum_remaining_allowance_exact": "8",
          "common_value": 17.5,
          "common_value_exact": "35/2",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": "timely:allowance:t0:p1_2:b8",
          "original_optimal_only_max_regret": 0.0,
          "original_optimal_only_max_regret_exact": "0"
        },
        {
          "id": "timely:t1:p1_5",
          "preset_id": "timely",
          "t": 1,
          "history_ids": [
            "timely:test-"
          ],
          "history_count": 1,
          "distinct_allowances": 1,
          "common_policy_node": "timely:allowance:t1:p1_5:b4",
          "common_optimal_actions": [
            "limited"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "timely:test-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [
            "timely:test-"
          ],
          "allowance_optimal_reachable_history_ids": [
            "timely:test-"
          ],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": false,
          "posterior": 0.2,
          "posterior_exact": "1/5",
          "minimum_remaining_allowance": 4.0,
          "minimum_remaining_allowance_exact": "4",
          "common_value": 9.0,
          "common_value_exact": "9",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": "timely:allowance:t1:p1_5:b4",
          "original_optimal_only_max_regret": 0.0,
          "original_optimal_only_max_regret_exact": "0"
        },
        {
          "id": "timely:t1:p1_2",
          "preset_id": "timely",
          "t": 1,
          "history_ids": [
            "timely:wait+",
            "timely:wait-"
          ],
          "history_count": 2,
          "distinct_allowances": 1,
          "common_policy_node": "timely:allowance:t1:p1_2:b8",
          "common_optimal_actions": [
            "test"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "timely:wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "timely:wait-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "minimum_remaining_allowance": 8.0,
          "minimum_remaining_allowance_exact": "8",
          "common_value": 17.5,
          "common_value_exact": "35/2",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        },
        {
          "id": "timely:t1:p4_5",
          "preset_id": "timely",
          "t": 1,
          "history_ids": [
            "timely:test+"
          ],
          "history_count": 1,
          "distinct_allowances": 1,
          "common_policy_node": "timely:allowance:t1:p4_5:b4",
          "common_optimal_actions": [
            "full"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "timely:test+",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [
            "timely:test+"
          ],
          "allowance_optimal_reachable_history_ids": [
            "timely:test+"
          ],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": false,
          "posterior": 0.8,
          "posterior_exact": "4/5",
          "minimum_remaining_allowance": 4.0,
          "minimum_remaining_allowance_exact": "4",
          "common_value": 40.0,
          "common_value_exact": "40",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": "timely:allowance:t1:p4_5:b4",
          "original_optimal_only_max_regret": 0.0,
          "original_optimal_only_max_regret_exact": "0"
        },
        {
          "id": "timely:t2:p1_17",
          "preset_id": "timely",
          "t": 2,
          "history_ids": [
            "timely:test-/test-"
          ],
          "history_count": 1,
          "distinct_allowances": 1,
          "common_policy_node": "timely:allowance:t2:p1_17:b0",
          "common_optimal_actions": [
            "limited"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "timely:test-/test-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": false,
          "posterior": 0.058823529411764705,
          "posterior_exact": "1/17",
          "minimum_remaining_allowance": 0.0,
          "minimum_remaining_allowance_exact": "0",
          "common_value": 6.176470588235294,
          "common_value_exact": "105/17",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        },
        {
          "id": "timely:t2:p1_5",
          "preset_id": "timely",
          "t": 2,
          "history_ids": [
            "timely:test-/wait+",
            "timely:test-/wait-",
            "timely:wait+/test-",
            "timely:wait-/test-"
          ],
          "history_count": 4,
          "distinct_allowances": 1,
          "common_policy_node": "timely:allowance:t2:p1_5:b4",
          "common_optimal_actions": [
            "limited"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "timely:test-/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "timely:test-/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "timely:wait+/test-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "timely:wait-/test-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.2,
          "posterior_exact": "1/5",
          "minimum_remaining_allowance": 4.0,
          "minimum_remaining_allowance_exact": "4",
          "common_value": 9.0,
          "common_value_exact": "9",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        },
        {
          "id": "timely:t2:p1_2",
          "preset_id": "timely",
          "t": 2,
          "history_ids": [
            "timely:test+/test-",
            "timely:test-/test+",
            "timely:wait+/wait+",
            "timely:wait+/wait-",
            "timely:wait-/wait+",
            "timely:wait-/wait-"
          ],
          "history_count": 6,
          "distinct_allowances": 2,
          "common_policy_node": "timely:allowance:t2:p1_2:b0",
          "common_optimal_actions": [
            "limited"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "timely:test+/test-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "timely:test-/test+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "timely:wait+/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "timely:wait+/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "timely:wait-/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "timely:wait-/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": true,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "minimum_remaining_allowance": 0.0,
          "minimum_remaining_allowance_exact": "0",
          "common_value": 15.0,
          "common_value_exact": "15",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        },
        {
          "id": "timely:t2:p4_5",
          "preset_id": "timely",
          "t": 2,
          "history_ids": [
            "timely:test+/wait+",
            "timely:test+/wait-",
            "timely:wait+/test+",
            "timely:wait-/test+"
          ],
          "history_count": 4,
          "distinct_allowances": 1,
          "common_policy_node": "timely:allowance:t2:p4_5:b4",
          "common_optimal_actions": [
            "full"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "timely:test+/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "timely:test+/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "timely:wait+/test+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "timely:wait-/test+",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.8,
          "posterior_exact": "4/5",
          "minimum_remaining_allowance": 4.0,
          "minimum_remaining_allowance_exact": "4",
          "common_value": 40.0,
          "common_value_exact": "40",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        },
        {
          "id": "timely:t2:p16_17",
          "preset_id": "timely",
          "t": 2,
          "history_ids": [
            "timely:test+/test+"
          ],
          "history_count": 1,
          "distinct_allowances": 1,
          "common_policy_node": "timely:allowance:t2:p16_17:b0",
          "common_optimal_actions": [
            "full"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "timely:test+/test+",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": false,
          "posterior": 0.9411764705882353,
          "posterior_exact": "16/17",
          "minimum_remaining_allowance": 0.0,
          "minimum_remaining_allowance_exact": "0",
          "common_value": 54.11764705882353,
          "common_value_exact": "920/17",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        }
      ],
      "initial_allowance": 8.0,
      "initial_allowance_exact": "8",
      "original_root_value": 17.5,
      "original_root_value_exact": "35/2",
      "allowance_root_value": 17.5,
      "allowance_root_value_exact": "35/2",
      "max_regret": 0.0,
      "max_regret_exact": "0"
    },
    {
      "id": "unchanged",
      "label": "More certain, same choice",
      "config": {
        "prior": 0.95,
        "accuracy": 0.8,
        "passive": 0.5,
        "cost": 4.0,
        "delay": 3.0,
        "deadline": 2,
        "latency": 1
      },
      "config_exact": {
        "prior": "19/20",
        "accuracy": "4/5",
        "passive": "1/2",
        "cost": "4",
        "delay": "3",
        "deadline": "2",
        "latency": "1"
      },
      "free_surveys_unconstrained": false,
      "original_root_policy_node": "unchanged:original:t0:p19_20:bunlimited",
      "allowance_root_policy_node": "unchanged:allowance:t0:p19_20:b8",
      "original_root_optimal_actions": [
        "full"
      ],
      "allowance_root_optimal_actions": [
        "full"
      ],
      "counts": {
        "original_histories": 21,
        "allowance_feasible_histories": 21,
        "original_optimal_reachable_histories": 1,
        "allowance_optimal_reachable_histories": 1,
        "original_time_belief_groups": 9,
        "time_belief_groups": 9,
        "augmented_groups": 10,
        "mixed_allowance_groups": 1,
        "harmful_groups": 0,
        "harmful_groups_with_original_optimal_reachable_member": 0,
        "harmful_groups_if_original_optimal_history_is_known": 0
      },
      "original_state_zero_regret": true,
      "augmented_state_zero_regret": true,
      "audit_time_belief": {
        "survey_spending_ambiguities": [
          [
            "unchanged:test+/test-",
            "unchanged:test-/test+",
            "unchanged:wait+/wait+",
            "unchanged:wait+/wait-",
            "unchanged:wait-/wait+",
            "unchanged:wait-/wait-"
          ]
        ],
        "ordered_evidence_ambiguities": [
          [
            "unchanged:wait+",
            "unchanged:wait-"
          ],
          [
            "unchanged:test+/test-",
            "unchanged:test-/test+",
            "unchanged:wait+/wait+",
            "unchanged:wait+/wait-",
            "unchanged:wait-/wait+",
            "unchanged:wait-/wait-"
          ],
          [
            "unchanged:test+/wait+",
            "unchanged:test+/wait-",
            "unchanged:wait+/test+",
            "unchanged:wait-/test+"
          ],
          [
            "unchanged:test-/wait+",
            "unchanged:test-/wait-",
            "unchanged:wait+/test-",
            "unchanged:wait-/test-"
          ]
        ]
      },
      "audit_augmented": {
        "survey_spending_ambiguities": [],
        "ordered_evidence_ambiguities": [
          [
            "unchanged:wait+",
            "unchanged:wait-"
          ],
          [
            "unchanged:wait+/wait+",
            "unchanged:wait+/wait-",
            "unchanged:wait-/wait+",
            "unchanged:wait-/wait-"
          ],
          [
            "unchanged:test+/wait+",
            "unchanged:test+/wait-",
            "unchanged:wait+/test+",
            "unchanged:wait-/test+"
          ],
          [
            "unchanged:test-/wait+",
            "unchanged:test-/wait-",
            "unchanged:wait+/test-",
            "unchanged:wait-/test-"
          ],
          [
            "unchanged:test+/test-",
            "unchanged:test-/test+"
          ]
        ]
      },
      "histories": [
        {
          "id": "unchanged:root",
          "t": 0,
          "history": [],
          "allowance_feasible": true,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": true,
          "survey_count": 0,
          "original_policy_node": "unchanged:original:t0:p19_20:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "unchanged:allowance:t0:p19_20:b8",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.95,
          "posterior_exact": "19/20",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": 8.0,
          "remaining_allowance_exact": "8",
          "path_likelihood_given_acquisition_choices": 1.0,
          "path_likelihood_given_acquisition_choices_exact": "1",
          "original_value": 55.0,
          "original_value_exact": "55",
          "allowance_value": 55.0,
          "allowance_value_exact": "55"
        },
        {
          "id": "unchanged:test+",
          "t": 1,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "unchanged:original:t1:p76_77:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "unchanged:allowance:t1:p76_77:b4",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.987012987012987,
          "posterior_exact": "76/77",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 3.0,
          "waiting_spent_exact": "3",
          "total_spent": 7.0,
          "total_spent_exact": "7",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.77,
          "path_likelihood_given_acquisition_choices_exact": "77/100",
          "original_value": 58.701298701298704,
          "original_value_exact": "4520/77",
          "allowance_value": 58.701298701298704,
          "allowance_value_exact": "4520/77"
        },
        {
          "id": "unchanged:test+/test+",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "unchanged:original:t2:p304_305:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "unchanged:allowance:t2:p304_305:b0",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.9967213114754099,
          "posterior_exact": "304/305",
          "survey_spent": 8.0,
          "survey_spent_exact": "8",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 14.0,
          "total_spent_exact": "14",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.61,
          "path_likelihood_given_acquisition_choices_exact": "61/100",
          "original_value": 59.67213114754098,
          "original_value_exact": "3640/61",
          "allowance_value": 59.67213114754098,
          "allowance_value_exact": "3640/61"
        },
        {
          "id": "unchanged:test+/test-",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "unchanged:original:t2:p19_20:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "unchanged:allowance:t2:p19_20:b0",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.95,
          "posterior_exact": "19/20",
          "survey_spent": 8.0,
          "survey_spent_exact": "8",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 14.0,
          "total_spent_exact": "14",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.16,
          "path_likelihood_given_acquisition_choices_exact": "4/25",
          "original_value": 55.0,
          "original_value_exact": "55",
          "allowance_value": 55.0,
          "allowance_value_exact": "55"
        },
        {
          "id": "unchanged:test+/wait+",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "unchanged:original:t2:p76_77:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "unchanged:allowance:t2:p76_77:b4",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.987012987012987,
          "posterior_exact": "76/77",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 10.0,
          "total_spent_exact": "10",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.385,
          "path_likelihood_given_acquisition_choices_exact": "77/200",
          "original_value": 58.701298701298704,
          "original_value_exact": "4520/77",
          "allowance_value": 58.701298701298704,
          "allowance_value_exact": "4520/77"
        },
        {
          "id": "unchanged:test+/wait-",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "unchanged:original:t2:p76_77:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "unchanged:allowance:t2:p76_77:b4",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.987012987012987,
          "posterior_exact": "76/77",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 10.0,
          "total_spent_exact": "10",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.385,
          "path_likelihood_given_acquisition_choices_exact": "77/200",
          "original_value": 58.701298701298704,
          "original_value_exact": "4520/77",
          "allowance_value": 58.701298701298704,
          "allowance_value_exact": "4520/77"
        },
        {
          "id": "unchanged:test-",
          "t": 1,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "unchanged:original:t1:p19_23:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "unchanged:allowance:t1:p19_23:b4",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.8260869565217391,
          "posterior_exact": "19/23",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 3.0,
          "waiting_spent_exact": "3",
          "total_spent": 7.0,
          "total_spent_exact": "7",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.23,
          "path_likelihood_given_acquisition_choices_exact": "23/100",
          "original_value": 42.608695652173914,
          "original_value_exact": "980/23",
          "allowance_value": 42.608695652173914,
          "allowance_value_exact": "980/23"
        },
        {
          "id": "unchanged:test-/test+",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "unchanged:original:t2:p19_20:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "unchanged:allowance:t2:p19_20:b0",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.95,
          "posterior_exact": "19/20",
          "survey_spent": 8.0,
          "survey_spent_exact": "8",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 14.0,
          "total_spent_exact": "14",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.16,
          "path_likelihood_given_acquisition_choices_exact": "4/25",
          "original_value": 55.0,
          "original_value_exact": "55",
          "allowance_value": 55.0,
          "allowance_value_exact": "55"
        },
        {
          "id": "unchanged:test-/test-",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "unchanged:original:t2:p19_35:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "unchanged:allowance:t2:p19_35:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5428571428571428,
          "posterior_exact": "19/35",
          "survey_spent": 8.0,
          "survey_spent_exact": "8",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 14.0,
          "total_spent_exact": "14",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.07,
          "path_likelihood_given_acquisition_choices_exact": "7/100",
          "original_value": 15.857142857142858,
          "original_value_exact": "111/7",
          "allowance_value": 15.857142857142858,
          "allowance_value_exact": "111/7"
        },
        {
          "id": "unchanged:test-/wait+",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "unchanged:original:t2:p19_23:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "unchanged:allowance:t2:p19_23:b4",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.8260869565217391,
          "posterior_exact": "19/23",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 10.0,
          "total_spent_exact": "10",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.115,
          "path_likelihood_given_acquisition_choices_exact": "23/200",
          "original_value": 42.608695652173914,
          "original_value_exact": "980/23",
          "allowance_value": 42.608695652173914,
          "allowance_value_exact": "980/23"
        },
        {
          "id": "unchanged:test-/wait-",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "unchanged:original:t2:p19_23:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "unchanged:allowance:t2:p19_23:b4",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.8260869565217391,
          "posterior_exact": "19/23",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 10.0,
          "total_spent_exact": "10",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.115,
          "path_likelihood_given_acquisition_choices_exact": "23/200",
          "original_value": 42.608695652173914,
          "original_value_exact": "980/23",
          "allowance_value": 42.608695652173914,
          "allowance_value_exact": "980/23"
        },
        {
          "id": "unchanged:wait+",
          "t": 1,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "unchanged:original:t1:p19_20:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "unchanged:allowance:t1:p19_20:b8",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.95,
          "posterior_exact": "19/20",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 3.0,
          "waiting_spent_exact": "3",
          "total_spent": 3.0,
          "total_spent_exact": "3",
          "remaining_allowance": 8.0,
          "remaining_allowance_exact": "8",
          "path_likelihood_given_acquisition_choices": 0.5,
          "path_likelihood_given_acquisition_choices_exact": "1/2",
          "original_value": 55.0,
          "original_value_exact": "55",
          "allowance_value": 55.0,
          "allowance_value_exact": "55"
        },
        {
          "id": "unchanged:wait+/test+",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "unchanged:original:t2:p76_77:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "unchanged:allowance:t2:p76_77:b4",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.987012987012987,
          "posterior_exact": "76/77",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 10.0,
          "total_spent_exact": "10",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.385,
          "path_likelihood_given_acquisition_choices_exact": "77/200",
          "original_value": 58.701298701298704,
          "original_value_exact": "4520/77",
          "allowance_value": 58.701298701298704,
          "allowance_value_exact": "4520/77"
        },
        {
          "id": "unchanged:wait+/test-",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "unchanged:original:t2:p19_23:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "unchanged:allowance:t2:p19_23:b4",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.8260869565217391,
          "posterior_exact": "19/23",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 10.0,
          "total_spent_exact": "10",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.115,
          "path_likelihood_given_acquisition_choices_exact": "23/200",
          "original_value": 42.608695652173914,
          "original_value_exact": "980/23",
          "allowance_value": 42.608695652173914,
          "allowance_value_exact": "980/23"
        },
        {
          "id": "unchanged:wait+/wait+",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "unchanged:original:t2:p19_20:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "unchanged:allowance:t2:p19_20:b8",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.95,
          "posterior_exact": "19/20",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 6.0,
          "total_spent_exact": "6",
          "remaining_allowance": 8.0,
          "remaining_allowance_exact": "8",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 55.0,
          "original_value_exact": "55",
          "allowance_value": 55.0,
          "allowance_value_exact": "55"
        },
        {
          "id": "unchanged:wait+/wait-",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "unchanged:original:t2:p19_20:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "unchanged:allowance:t2:p19_20:b8",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.95,
          "posterior_exact": "19/20",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 6.0,
          "total_spent_exact": "6",
          "remaining_allowance": 8.0,
          "remaining_allowance_exact": "8",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 55.0,
          "original_value_exact": "55",
          "allowance_value": 55.0,
          "allowance_value_exact": "55"
        },
        {
          "id": "unchanged:wait-",
          "t": 1,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "unchanged:original:t1:p19_20:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "unchanged:allowance:t1:p19_20:b8",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.95,
          "posterior_exact": "19/20",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 3.0,
          "waiting_spent_exact": "3",
          "total_spent": 3.0,
          "total_spent_exact": "3",
          "remaining_allowance": 8.0,
          "remaining_allowance_exact": "8",
          "path_likelihood_given_acquisition_choices": 0.5,
          "path_likelihood_given_acquisition_choices_exact": "1/2",
          "original_value": 55.0,
          "original_value_exact": "55",
          "allowance_value": 55.0,
          "allowance_value_exact": "55"
        },
        {
          "id": "unchanged:wait-/test+",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "unchanged:original:t2:p76_77:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "unchanged:allowance:t2:p76_77:b4",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.987012987012987,
          "posterior_exact": "76/77",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 10.0,
          "total_spent_exact": "10",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.385,
          "path_likelihood_given_acquisition_choices_exact": "77/200",
          "original_value": 58.701298701298704,
          "original_value_exact": "4520/77",
          "allowance_value": 58.701298701298704,
          "allowance_value_exact": "4520/77"
        },
        {
          "id": "unchanged:wait-/test-",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "unchanged:original:t2:p19_23:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "unchanged:allowance:t2:p19_23:b4",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.8260869565217391,
          "posterior_exact": "19/23",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 10.0,
          "total_spent_exact": "10",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.115,
          "path_likelihood_given_acquisition_choices_exact": "23/200",
          "original_value": 42.608695652173914,
          "original_value_exact": "980/23",
          "allowance_value": 42.608695652173914,
          "allowance_value_exact": "980/23"
        },
        {
          "id": "unchanged:wait-/wait+",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "unchanged:original:t2:p19_20:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "unchanged:allowance:t2:p19_20:b8",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.95,
          "posterior_exact": "19/20",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 6.0,
          "total_spent_exact": "6",
          "remaining_allowance": 8.0,
          "remaining_allowance_exact": "8",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 55.0,
          "original_value_exact": "55",
          "allowance_value": 55.0,
          "allowance_value_exact": "55"
        },
        {
          "id": "unchanged:wait-/wait-",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "unchanged:original:t2:p19_20:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "unchanged:allowance:t2:p19_20:b8",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.95,
          "posterior_exact": "19/20",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 6.0,
          "total_spent_exact": "6",
          "remaining_allowance": 8.0,
          "remaining_allowance_exact": "8",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 55.0,
          "original_value_exact": "55",
          "allowance_value": 55.0,
          "allowance_value_exact": "55"
        }
      ],
      "groups": [
        {
          "id": "unchanged:t0:p19_20",
          "preset_id": "unchanged",
          "t": 0,
          "history_ids": [
            "unchanged:root"
          ],
          "history_count": 1,
          "distinct_allowances": 1,
          "common_policy_node": "unchanged:allowance:t0:p19_20:b8",
          "common_optimal_actions": [
            "full"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "unchanged:root",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [
            "unchanged:root"
          ],
          "allowance_optimal_reachable_history_ids": [
            "unchanged:root"
          ],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": false,
          "posterior": 0.95,
          "posterior_exact": "19/20",
          "minimum_remaining_allowance": 8.0,
          "minimum_remaining_allowance_exact": "8",
          "common_value": 55.0,
          "common_value_exact": "55",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": "unchanged:allowance:t0:p19_20:b8",
          "original_optimal_only_max_regret": 0.0,
          "original_optimal_only_max_regret_exact": "0"
        },
        {
          "id": "unchanged:t1:p19_23",
          "preset_id": "unchanged",
          "t": 1,
          "history_ids": [
            "unchanged:test-"
          ],
          "history_count": 1,
          "distinct_allowances": 1,
          "common_policy_node": "unchanged:allowance:t1:p19_23:b4",
          "common_optimal_actions": [
            "full"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "unchanged:test-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": false,
          "posterior": 0.8260869565217391,
          "posterior_exact": "19/23",
          "minimum_remaining_allowance": 4.0,
          "minimum_remaining_allowance_exact": "4",
          "common_value": 42.608695652173914,
          "common_value_exact": "980/23",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        },
        {
          "id": "unchanged:t1:p19_20",
          "preset_id": "unchanged",
          "t": 1,
          "history_ids": [
            "unchanged:wait+",
            "unchanged:wait-"
          ],
          "history_count": 2,
          "distinct_allowances": 1,
          "common_policy_node": "unchanged:allowance:t1:p19_20:b8",
          "common_optimal_actions": [
            "full"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "unchanged:wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "unchanged:wait-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.95,
          "posterior_exact": "19/20",
          "minimum_remaining_allowance": 8.0,
          "minimum_remaining_allowance_exact": "8",
          "common_value": 55.0,
          "common_value_exact": "55",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        },
        {
          "id": "unchanged:t1:p76_77",
          "preset_id": "unchanged",
          "t": 1,
          "history_ids": [
            "unchanged:test+"
          ],
          "history_count": 1,
          "distinct_allowances": 1,
          "common_policy_node": "unchanged:allowance:t1:p76_77:b4",
          "common_optimal_actions": [
            "full"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "unchanged:test+",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": false,
          "posterior": 0.987012987012987,
          "posterior_exact": "76/77",
          "minimum_remaining_allowance": 4.0,
          "minimum_remaining_allowance_exact": "4",
          "common_value": 58.701298701298704,
          "common_value_exact": "4520/77",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        },
        {
          "id": "unchanged:t2:p19_35",
          "preset_id": "unchanged",
          "t": 2,
          "history_ids": [
            "unchanged:test-/test-"
          ],
          "history_count": 1,
          "distinct_allowances": 1,
          "common_policy_node": "unchanged:allowance:t2:p19_35:b0",
          "common_optimal_actions": [
            "limited"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "unchanged:test-/test-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": false,
          "posterior": 0.5428571428571428,
          "posterior_exact": "19/35",
          "minimum_remaining_allowance": 0.0,
          "minimum_remaining_allowance_exact": "0",
          "common_value": 15.857142857142858,
          "common_value_exact": "111/7",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        },
        {
          "id": "unchanged:t2:p19_23",
          "preset_id": "unchanged",
          "t": 2,
          "history_ids": [
            "unchanged:test-/wait+",
            "unchanged:test-/wait-",
            "unchanged:wait+/test-",
            "unchanged:wait-/test-"
          ],
          "history_count": 4,
          "distinct_allowances": 1,
          "common_policy_node": "unchanged:allowance:t2:p19_23:b4",
          "common_optimal_actions": [
            "full"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "unchanged:test-/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "unchanged:test-/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "unchanged:wait+/test-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "unchanged:wait-/test-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.8260869565217391,
          "posterior_exact": "19/23",
          "minimum_remaining_allowance": 4.0,
          "minimum_remaining_allowance_exact": "4",
          "common_value": 42.608695652173914,
          "common_value_exact": "980/23",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        },
        {
          "id": "unchanged:t2:p19_20",
          "preset_id": "unchanged",
          "t": 2,
          "history_ids": [
            "unchanged:test+/test-",
            "unchanged:test-/test+",
            "unchanged:wait+/wait+",
            "unchanged:wait+/wait-",
            "unchanged:wait-/wait+",
            "unchanged:wait-/wait-"
          ],
          "history_count": 6,
          "distinct_allowances": 2,
          "common_policy_node": "unchanged:allowance:t2:p19_20:b0",
          "common_optimal_actions": [
            "full"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "unchanged:test+/test-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "unchanged:test-/test+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "unchanged:wait+/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "unchanged:wait+/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "unchanged:wait-/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "unchanged:wait-/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": true,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.95,
          "posterior_exact": "19/20",
          "minimum_remaining_allowance": 0.0,
          "minimum_remaining_allowance_exact": "0",
          "common_value": 55.0,
          "common_value_exact": "55",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        },
        {
          "id": "unchanged:t2:p76_77",
          "preset_id": "unchanged",
          "t": 2,
          "history_ids": [
            "unchanged:test+/wait+",
            "unchanged:test+/wait-",
            "unchanged:wait+/test+",
            "unchanged:wait-/test+"
          ],
          "history_count": 4,
          "distinct_allowances": 1,
          "common_policy_node": "unchanged:allowance:t2:p76_77:b4",
          "common_optimal_actions": [
            "full"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "unchanged:test+/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "unchanged:test+/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "unchanged:wait+/test+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "unchanged:wait-/test+",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.987012987012987,
          "posterior_exact": "76/77",
          "minimum_remaining_allowance": 4.0,
          "minimum_remaining_allowance_exact": "4",
          "common_value": 58.701298701298704,
          "common_value_exact": "4520/77",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        },
        {
          "id": "unchanged:t2:p304_305",
          "preset_id": "unchanged",
          "t": 2,
          "history_ids": [
            "unchanged:test+/test+"
          ],
          "history_count": 1,
          "distinct_allowances": 1,
          "common_policy_node": "unchanged:allowance:t2:p304_305:b0",
          "common_optimal_actions": [
            "full"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "unchanged:test+/test+",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": false,
          "posterior": 0.9967213114754099,
          "posterior_exact": "304/305",
          "minimum_remaining_allowance": 0.0,
          "minimum_remaining_allowance_exact": "0",
          "common_value": 59.67213114754098,
          "common_value_exact": "3640/61",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        }
      ],
      "initial_allowance": 8.0,
      "initial_allowance_exact": "8",
      "original_root_value": 55.0,
      "original_root_value_exact": "55",
      "allowance_root_value": 55.0,
      "allowance_root_value_exact": "55",
      "max_regret": 0.0,
      "max_regret_exact": "0"
    },
    {
      "id": "late",
      "label": "Too late",
      "config": {
        "prior": 0.5,
        "accuracy": 0.8,
        "passive": 0.5,
        "cost": 4.0,
        "delay": 3.0,
        "deadline": 1,
        "latency": 2
      },
      "config_exact": {
        "prior": "1/2",
        "accuracy": "4/5",
        "passive": "1/2",
        "cost": "4",
        "delay": "3",
        "deadline": "1",
        "latency": "2"
      },
      "free_surveys_unconstrained": false,
      "original_root_policy_node": "late:original:t0:p1_2:bunlimited",
      "allowance_root_policy_node": "late:allowance:t0:p1_2:b8",
      "original_root_optimal_actions": [
        "limited"
      ],
      "allowance_root_optimal_actions": [
        "limited"
      ],
      "counts": {
        "original_histories": 3,
        "allowance_feasible_histories": 3,
        "original_optimal_reachable_histories": 1,
        "allowance_optimal_reachable_histories": 1,
        "original_time_belief_groups": 2,
        "time_belief_groups": 2,
        "augmented_groups": 2,
        "mixed_allowance_groups": 0,
        "harmful_groups": 0,
        "harmful_groups_with_original_optimal_reachable_member": 0,
        "harmful_groups_if_original_optimal_history_is_known": 0
      },
      "original_state_zero_regret": true,
      "augmented_state_zero_regret": true,
      "audit_time_belief": {
        "survey_spending_ambiguities": [],
        "ordered_evidence_ambiguities": [
          [
            "late:wait+",
            "late:wait-"
          ]
        ]
      },
      "audit_augmented": {
        "survey_spending_ambiguities": [],
        "ordered_evidence_ambiguities": [
          [
            "late:wait+",
            "late:wait-"
          ]
        ]
      },
      "histories": [
        {
          "id": "late:root",
          "t": 0,
          "history": [],
          "allowance_feasible": true,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": true,
          "survey_count": 0,
          "original_policy_node": "late:original:t0:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "late:allowance:t0:p1_2:b8",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": 8.0,
          "remaining_allowance_exact": "8",
          "path_likelihood_given_acquisition_choices": 1.0,
          "path_likelihood_given_acquisition_choices_exact": "1",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "late:wait+",
          "t": 1,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "late:original:t1:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "late:allowance:t1:p1_2:b8",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 3.0,
          "waiting_spent_exact": "3",
          "total_spent": 3.0,
          "total_spent_exact": "3",
          "remaining_allowance": 8.0,
          "remaining_allowance_exact": "8",
          "path_likelihood_given_acquisition_choices": 0.5,
          "path_likelihood_given_acquisition_choices_exact": "1/2",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "late:wait-",
          "t": 1,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "late:original:t1:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "late:allowance:t1:p1_2:b8",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 3.0,
          "waiting_spent_exact": "3",
          "total_spent": 3.0,
          "total_spent_exact": "3",
          "remaining_allowance": 8.0,
          "remaining_allowance_exact": "8",
          "path_likelihood_given_acquisition_choices": 0.5,
          "path_likelihood_given_acquisition_choices_exact": "1/2",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        }
      ],
      "groups": [
        {
          "id": "late:t0:p1_2",
          "preset_id": "late",
          "t": 0,
          "history_ids": [
            "late:root"
          ],
          "history_count": 1,
          "distinct_allowances": 1,
          "common_policy_node": "late:allowance:t0:p1_2:b8",
          "common_optimal_actions": [
            "limited"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "late:root",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [
            "late:root"
          ],
          "allowance_optimal_reachable_history_ids": [
            "late:root"
          ],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": false,
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "minimum_remaining_allowance": 8.0,
          "minimum_remaining_allowance_exact": "8",
          "common_value": 15.0,
          "common_value_exact": "15",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": "late:allowance:t0:p1_2:b8",
          "original_optimal_only_max_regret": 0.0,
          "original_optimal_only_max_regret_exact": "0"
        },
        {
          "id": "late:t1:p1_2",
          "preset_id": "late",
          "t": 1,
          "history_ids": [
            "late:wait+",
            "late:wait-"
          ],
          "history_count": 2,
          "distinct_allowances": 1,
          "common_policy_node": "late:allowance:t1:p1_2:b8",
          "common_optimal_actions": [
            "limited"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "late:wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "late:wait-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "minimum_remaining_allowance": 8.0,
          "minimum_remaining_allowance_exact": "8",
          "common_value": 15.0,
          "common_value_exact": "15",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        }
      ],
      "initial_allowance": 8.0,
      "initial_allowance_exact": "8",
      "original_root_value": 15.0,
      "original_root_value_exact": "15",
      "allowance_root_value": 15.0,
      "allowance_root_value_exact": "15",
      "max_regret": 0.0,
      "max_regret_exact": "0"
    },
    {
      "id": "routine",
      "label": "Ordinary evidence is enough",
      "config": {
        "prior": 0.5,
        "accuracy": 0.8,
        "passive": 0.8,
        "cost": 4.0,
        "delay": 3.0,
        "deadline": 2,
        "latency": 1
      },
      "config_exact": {
        "prior": "1/2",
        "accuracy": "4/5",
        "passive": "4/5",
        "cost": "4",
        "delay": "3",
        "deadline": "2",
        "latency": "1"
      },
      "free_surveys_unconstrained": false,
      "original_root_policy_node": "routine:original:t0:p1_2:bunlimited",
      "allowance_root_policy_node": "routine:allowance:t0:p1_2:b8",
      "original_root_optimal_actions": [
        "wait"
      ],
      "allowance_root_optimal_actions": [
        "wait"
      ],
      "counts": {
        "original_histories": 21,
        "allowance_feasible_histories": 21,
        "original_optimal_reachable_histories": 3,
        "allowance_optimal_reachable_histories": 3,
        "original_time_belief_groups": 6,
        "time_belief_groups": 6,
        "augmented_groups": 14,
        "mixed_allowance_groups": 5,
        "harmful_groups": 0,
        "harmful_groups_with_original_optimal_reachable_member": 0,
        "harmful_groups_if_original_optimal_history_is_known": 0
      },
      "original_state_zero_regret": true,
      "augmented_state_zero_regret": true,
      "audit_time_belief": {
        "survey_spending_ambiguities": [
          [
            "routine:test+",
            "routine:wait+"
          ],
          [
            "routine:test+/test+",
            "routine:test+/wait+",
            "routine:wait+/test+",
            "routine:wait+/wait+"
          ],
          [
            "routine:test+/test-",
            "routine:test+/wait-",
            "routine:test-/test+",
            "routine:test-/wait+",
            "routine:wait+/test-",
            "routine:wait+/wait-",
            "routine:wait-/test+",
            "routine:wait-/wait+"
          ],
          [
            "routine:test-",
            "routine:wait-"
          ],
          [
            "routine:test-/test-",
            "routine:test-/wait-",
            "routine:wait-/test-",
            "routine:wait-/wait-"
          ]
        ],
        "ordered_evidence_ambiguities": [
          [
            "routine:test+",
            "routine:wait+"
          ],
          [
            "routine:test+/test+",
            "routine:test+/wait+",
            "routine:wait+/test+",
            "routine:wait+/wait+"
          ],
          [
            "routine:test+/test-",
            "routine:test+/wait-",
            "routine:test-/test+",
            "routine:test-/wait+",
            "routine:wait+/test-",
            "routine:wait+/wait-",
            "routine:wait-/test+",
            "routine:wait-/wait+"
          ],
          [
            "routine:test-",
            "routine:wait-"
          ],
          [
            "routine:test-/test-",
            "routine:test-/wait-",
            "routine:wait-/test-",
            "routine:wait-/wait-"
          ]
        ]
      },
      "audit_augmented": {
        "survey_spending_ambiguities": [],
        "ordered_evidence_ambiguities": [
          [
            "routine:wait+/wait-",
            "routine:wait-/wait+"
          ],
          [
            "routine:test+/wait+",
            "routine:wait+/test+"
          ],
          [
            "routine:test+/wait-",
            "routine:test-/wait+",
            "routine:wait+/test-",
            "routine:wait-/test+"
          ],
          [
            "routine:test-/wait-",
            "routine:wait-/test-"
          ],
          [
            "routine:test+/test-",
            "routine:test-/test+"
          ]
        ]
      },
      "histories": [
        {
          "id": "routine:root",
          "t": 0,
          "history": [],
          "allowance_feasible": true,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": true,
          "survey_count": 0,
          "original_policy_node": "routine:original:t0:p1_2:bunlimited",
          "original_optimal_actions": [
            "wait"
          ],
          "allowance_policy_node": "routine:allowance:t0:p1_2:b8",
          "allowance_optimal_actions": [
            "wait"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": 8.0,
          "remaining_allowance_exact": "8",
          "path_likelihood_given_acquisition_choices": 1.0,
          "path_likelihood_given_acquisition_choices_exact": "1",
          "original_value": 21.5,
          "original_value_exact": "43/2",
          "allowance_value": 21.5,
          "allowance_value_exact": "43/2"
        },
        {
          "id": "routine:test+",
          "t": 1,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "routine:original:t1:p4_5:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "routine:allowance:t1:p4_5:b4",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.8,
          "posterior_exact": "4/5",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 3.0,
          "waiting_spent_exact": "3",
          "total_spent": 7.0,
          "total_spent_exact": "7",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.5,
          "path_likelihood_given_acquisition_choices_exact": "1/2",
          "original_value": 40.0,
          "original_value_exact": "40",
          "allowance_value": 40.0,
          "allowance_value_exact": "40"
        },
        {
          "id": "routine:test+/test+",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "routine:original:t2:p16_17:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "routine:allowance:t2:p16_17:b0",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.9411764705882353,
          "posterior_exact": "16/17",
          "survey_spent": 8.0,
          "survey_spent_exact": "8",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 14.0,
          "total_spent_exact": "14",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.34,
          "path_likelihood_given_acquisition_choices_exact": "17/50",
          "original_value": 54.11764705882353,
          "original_value_exact": "920/17",
          "allowance_value": 54.11764705882353,
          "allowance_value_exact": "920/17"
        },
        {
          "id": "routine:test+/test-",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "routine:original:t2:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "routine:allowance:t2:p1_2:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 8.0,
          "survey_spent_exact": "8",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 14.0,
          "total_spent_exact": "14",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.16,
          "path_likelihood_given_acquisition_choices_exact": "4/25",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "routine:test+/wait+",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "routine:original:t2:p16_17:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "routine:allowance:t2:p16_17:b4",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.9411764705882353,
          "posterior_exact": "16/17",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 10.0,
          "total_spent_exact": "10",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.34,
          "path_likelihood_given_acquisition_choices_exact": "17/50",
          "original_value": 54.11764705882353,
          "original_value_exact": "920/17",
          "allowance_value": 54.11764705882353,
          "allowance_value_exact": "920/17"
        },
        {
          "id": "routine:test+/wait-",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "routine:original:t2:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "routine:allowance:t2:p1_2:b4",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 10.0,
          "total_spent_exact": "10",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.16,
          "path_likelihood_given_acquisition_choices_exact": "4/25",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "routine:test-",
          "t": 1,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "routine:original:t1:p1_5:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "routine:allowance:t1:p1_5:b4",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.2,
          "posterior_exact": "1/5",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 3.0,
          "waiting_spent_exact": "3",
          "total_spent": 7.0,
          "total_spent_exact": "7",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.5,
          "path_likelihood_given_acquisition_choices_exact": "1/2",
          "original_value": 9.0,
          "original_value_exact": "9",
          "allowance_value": 9.0,
          "allowance_value_exact": "9"
        },
        {
          "id": "routine:test-/test+",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "routine:original:t2:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "routine:allowance:t2:p1_2:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 8.0,
          "survey_spent_exact": "8",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 14.0,
          "total_spent_exact": "14",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.16,
          "path_likelihood_given_acquisition_choices_exact": "4/25",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "routine:test-/test-",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "routine:original:t2:p1_17:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "routine:allowance:t2:p1_17:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.058823529411764705,
          "posterior_exact": "1/17",
          "survey_spent": 8.0,
          "survey_spent_exact": "8",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 14.0,
          "total_spent_exact": "14",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.34,
          "path_likelihood_given_acquisition_choices_exact": "17/50",
          "original_value": 6.176470588235294,
          "original_value_exact": "105/17",
          "allowance_value": 6.176470588235294,
          "allowance_value_exact": "105/17"
        },
        {
          "id": "routine:test-/wait+",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "routine:original:t2:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "routine:allowance:t2:p1_2:b4",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 10.0,
          "total_spent_exact": "10",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.16,
          "path_likelihood_given_acquisition_choices_exact": "4/25",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "routine:test-/wait-",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "routine:original:t2:p1_17:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "routine:allowance:t2:p1_17:b4",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.058823529411764705,
          "posterior_exact": "1/17",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 10.0,
          "total_spent_exact": "10",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.34,
          "path_likelihood_given_acquisition_choices_exact": "17/50",
          "original_value": 6.176470588235294,
          "original_value_exact": "105/17",
          "allowance_value": 6.176470588235294,
          "allowance_value_exact": "105/17"
        },
        {
          "id": "routine:wait+",
          "t": 1,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": true,
          "survey_count": 0,
          "original_policy_node": "routine:original:t1:p4_5:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "routine:allowance:t1:p4_5:b8",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.8,
          "posterior_exact": "4/5",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 3.0,
          "waiting_spent_exact": "3",
          "total_spent": 3.0,
          "total_spent_exact": "3",
          "remaining_allowance": 8.0,
          "remaining_allowance_exact": "8",
          "path_likelihood_given_acquisition_choices": 0.5,
          "path_likelihood_given_acquisition_choices_exact": "1/2",
          "original_value": 40.0,
          "original_value_exact": "40",
          "allowance_value": 40.0,
          "allowance_value_exact": "40"
        },
        {
          "id": "routine:wait+/test+",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "routine:original:t2:p16_17:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "routine:allowance:t2:p16_17:b4",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.9411764705882353,
          "posterior_exact": "16/17",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 10.0,
          "total_spent_exact": "10",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.34,
          "path_likelihood_given_acquisition_choices_exact": "17/50",
          "original_value": 54.11764705882353,
          "original_value_exact": "920/17",
          "allowance_value": 54.11764705882353,
          "allowance_value_exact": "920/17"
        },
        {
          "id": "routine:wait+/test-",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "routine:original:t2:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "routine:allowance:t2:p1_2:b4",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 10.0,
          "total_spent_exact": "10",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.16,
          "path_likelihood_given_acquisition_choices_exact": "4/25",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "routine:wait+/wait+",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "routine:original:t2:p16_17:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "routine:allowance:t2:p16_17:b8",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.9411764705882353,
          "posterior_exact": "16/17",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 6.0,
          "total_spent_exact": "6",
          "remaining_allowance": 8.0,
          "remaining_allowance_exact": "8",
          "path_likelihood_given_acquisition_choices": 0.34,
          "path_likelihood_given_acquisition_choices_exact": "17/50",
          "original_value": 54.11764705882353,
          "original_value_exact": "920/17",
          "allowance_value": 54.11764705882353,
          "allowance_value_exact": "920/17"
        },
        {
          "id": "routine:wait+/wait-",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "routine:original:t2:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "routine:allowance:t2:p1_2:b8",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 6.0,
          "total_spent_exact": "6",
          "remaining_allowance": 8.0,
          "remaining_allowance_exact": "8",
          "path_likelihood_given_acquisition_choices": 0.16,
          "path_likelihood_given_acquisition_choices_exact": "4/25",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "routine:wait-",
          "t": 1,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": true,
          "survey_count": 0,
          "original_policy_node": "routine:original:t1:p1_5:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "routine:allowance:t1:p1_5:b8",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.2,
          "posterior_exact": "1/5",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 3.0,
          "waiting_spent_exact": "3",
          "total_spent": 3.0,
          "total_spent_exact": "3",
          "remaining_allowance": 8.0,
          "remaining_allowance_exact": "8",
          "path_likelihood_given_acquisition_choices": 0.5,
          "path_likelihood_given_acquisition_choices_exact": "1/2",
          "original_value": 9.0,
          "original_value_exact": "9",
          "allowance_value": 9.0,
          "allowance_value_exact": "9"
        },
        {
          "id": "routine:wait-/test+",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "routine:original:t2:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "routine:allowance:t2:p1_2:b4",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 10.0,
          "total_spent_exact": "10",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.16,
          "path_likelihood_given_acquisition_choices_exact": "4/25",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "routine:wait-/test-",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "routine:original:t2:p1_17:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "routine:allowance:t2:p1_17:b4",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.058823529411764705,
          "posterior_exact": "1/17",
          "survey_spent": 4.0,
          "survey_spent_exact": "4",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 10.0,
          "total_spent_exact": "10",
          "remaining_allowance": 4.0,
          "remaining_allowance_exact": "4",
          "path_likelihood_given_acquisition_choices": 0.34,
          "path_likelihood_given_acquisition_choices_exact": "17/50",
          "original_value": 6.176470588235294,
          "original_value_exact": "105/17",
          "allowance_value": 6.176470588235294,
          "allowance_value_exact": "105/17"
        },
        {
          "id": "routine:wait-/wait+",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "routine:original:t2:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "routine:allowance:t2:p1_2:b8",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 6.0,
          "total_spent_exact": "6",
          "remaining_allowance": 8.0,
          "remaining_allowance_exact": "8",
          "path_likelihood_given_acquisition_choices": 0.16,
          "path_likelihood_given_acquisition_choices_exact": "4/25",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "routine:wait-/wait-",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "routine:original:t2:p1_17:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "routine:allowance:t2:p1_17:b8",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.058823529411764705,
          "posterior_exact": "1/17",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 6.0,
          "waiting_spent_exact": "6",
          "total_spent": 6.0,
          "total_spent_exact": "6",
          "remaining_allowance": 8.0,
          "remaining_allowance_exact": "8",
          "path_likelihood_given_acquisition_choices": 0.34,
          "path_likelihood_given_acquisition_choices_exact": "17/50",
          "original_value": 6.176470588235294,
          "original_value_exact": "105/17",
          "allowance_value": 6.176470588235294,
          "allowance_value_exact": "105/17"
        }
      ],
      "groups": [
        {
          "id": "routine:t0:p1_2",
          "preset_id": "routine",
          "t": 0,
          "history_ids": [
            "routine:root"
          ],
          "history_count": 1,
          "distinct_allowances": 1,
          "common_policy_node": "routine:allowance:t0:p1_2:b8",
          "common_optimal_actions": [
            "wait"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "routine:root",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [
            "routine:root"
          ],
          "allowance_optimal_reachable_history_ids": [
            "routine:root"
          ],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": false,
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "minimum_remaining_allowance": 8.0,
          "minimum_remaining_allowance_exact": "8",
          "common_value": 21.5,
          "common_value_exact": "43/2",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": "routine:allowance:t0:p1_2:b8",
          "original_optimal_only_max_regret": 0.0,
          "original_optimal_only_max_regret_exact": "0"
        },
        {
          "id": "routine:t1:p1_5",
          "preset_id": "routine",
          "t": 1,
          "history_ids": [
            "routine:test-",
            "routine:wait-"
          ],
          "history_count": 2,
          "distinct_allowances": 2,
          "common_policy_node": "routine:allowance:t1:p1_5:b4",
          "common_optimal_actions": [
            "limited"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "routine:test-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "routine:wait-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [
            "routine:wait-"
          ],
          "allowance_optimal_reachable_history_ids": [
            "routine:wait-"
          ],
          "survey_spending_ambiguous": true,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.2,
          "posterior_exact": "1/5",
          "minimum_remaining_allowance": 4.0,
          "minimum_remaining_allowance_exact": "4",
          "common_value": 9.0,
          "common_value_exact": "9",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": "routine:allowance:t1:p1_5:b8",
          "original_optimal_only_max_regret": 0.0,
          "original_optimal_only_max_regret_exact": "0"
        },
        {
          "id": "routine:t1:p4_5",
          "preset_id": "routine",
          "t": 1,
          "history_ids": [
            "routine:test+",
            "routine:wait+"
          ],
          "history_count": 2,
          "distinct_allowances": 2,
          "common_policy_node": "routine:allowance:t1:p4_5:b4",
          "common_optimal_actions": [
            "full"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "routine:test+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "routine:wait+",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [
            "routine:wait+"
          ],
          "allowance_optimal_reachable_history_ids": [
            "routine:wait+"
          ],
          "survey_spending_ambiguous": true,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.8,
          "posterior_exact": "4/5",
          "minimum_remaining_allowance": 4.0,
          "minimum_remaining_allowance_exact": "4",
          "common_value": 40.0,
          "common_value_exact": "40",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": "routine:allowance:t1:p4_5:b8",
          "original_optimal_only_max_regret": 0.0,
          "original_optimal_only_max_regret_exact": "0"
        },
        {
          "id": "routine:t2:p1_17",
          "preset_id": "routine",
          "t": 2,
          "history_ids": [
            "routine:test-/test-",
            "routine:test-/wait-",
            "routine:wait-/test-",
            "routine:wait-/wait-"
          ],
          "history_count": 4,
          "distinct_allowances": 3,
          "common_policy_node": "routine:allowance:t2:p1_17:b0",
          "common_optimal_actions": [
            "limited"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "routine:test-/test-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "routine:test-/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "routine:wait-/test-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "routine:wait-/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": true,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.058823529411764705,
          "posterior_exact": "1/17",
          "minimum_remaining_allowance": 0.0,
          "minimum_remaining_allowance_exact": "0",
          "common_value": 6.176470588235294,
          "common_value_exact": "105/17",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        },
        {
          "id": "routine:t2:p1_2",
          "preset_id": "routine",
          "t": 2,
          "history_ids": [
            "routine:test+/test-",
            "routine:test+/wait-",
            "routine:test-/test+",
            "routine:test-/wait+",
            "routine:wait+/test-",
            "routine:wait+/wait-",
            "routine:wait-/test+",
            "routine:wait-/wait+"
          ],
          "history_count": 8,
          "distinct_allowances": 3,
          "common_policy_node": "routine:allowance:t2:p1_2:b0",
          "common_optimal_actions": [
            "limited"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "routine:test+/test-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "routine:test+/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "routine:test-/test+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "routine:test-/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "routine:wait+/test-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "routine:wait+/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "routine:wait-/test+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "routine:wait-/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": true,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "minimum_remaining_allowance": 0.0,
          "minimum_remaining_allowance_exact": "0",
          "common_value": 15.0,
          "common_value_exact": "15",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        },
        {
          "id": "routine:t2:p16_17",
          "preset_id": "routine",
          "t": 2,
          "history_ids": [
            "routine:test+/test+",
            "routine:test+/wait+",
            "routine:wait+/test+",
            "routine:wait+/wait+"
          ],
          "history_count": 4,
          "distinct_allowances": 3,
          "common_policy_node": "routine:allowance:t2:p16_17:b0",
          "common_optimal_actions": [
            "full"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "routine:test+/test+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "routine:test+/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "routine:wait+/test+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "routine:wait+/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": true,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.9411764705882353,
          "posterior_exact": "16/17",
          "minimum_remaining_allowance": 0.0,
          "minimum_remaining_allowance_exact": "0",
          "common_value": 54.11764705882353,
          "common_value_exact": "920/17",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        }
      ],
      "initial_allowance": 8.0,
      "initial_allowance_exact": "8",
      "original_root_value": 21.5,
      "original_root_value_exact": "43/2",
      "allowance_root_value": 21.5,
      "allowance_root_value_exact": "43/2",
      "max_regret": 0.0,
      "max_regret_exact": "0"
    },
    {
      "id": "sequential",
      "label": "Choose when to stop",
      "config": {
        "prior": 0.5,
        "accuracy": 0.7,
        "passive": 0.5,
        "cost": 0.5,
        "delay": 0.5,
        "deadline": 3,
        "latency": 1
      },
      "config_exact": {
        "prior": "1/2",
        "accuracy": "7/10",
        "passive": "1/2",
        "cost": "1/2",
        "delay": "1/2",
        "deadline": "3",
        "latency": "1"
      },
      "free_surveys_unconstrained": false,
      "original_root_policy_node": "sequential:original:t0:p1_2:bunlimited",
      "allowance_root_policy_node": "sequential:allowance:t0:p1_2:b1",
      "original_root_optimal_actions": [
        "test"
      ],
      "allowance_root_optimal_actions": [
        "test"
      ],
      "counts": {
        "original_histories": 85,
        "allowance_feasible_histories": 77,
        "original_optimal_reachable_histories": 11,
        "allowance_optimal_reachable_histories": 5,
        "original_time_belief_groups": 16,
        "time_belief_groups": 14,
        "augmented_groups": 16,
        "mixed_allowance_groups": 2,
        "harmful_groups": 1,
        "harmful_groups_with_original_optimal_reachable_member": 1,
        "harmful_groups_if_original_optimal_history_is_known": 0
      },
      "original_state_zero_regret": true,
      "augmented_state_zero_regret": true,
      "audit_time_belief": {
        "survey_spending_ambiguities": [
          [
            "sequential:test+/test-",
            "sequential:test-/test+",
            "sequential:wait+/wait+",
            "sequential:wait+/wait-",
            "sequential:wait-/wait+",
            "sequential:wait-/wait-"
          ],
          [
            "sequential:test+/test-/wait+",
            "sequential:test+/test-/wait-",
            "sequential:test+/wait+/test-",
            "sequential:test+/wait-/test-",
            "sequential:test-/test+/wait+",
            "sequential:test-/test+/wait-",
            "sequential:test-/wait+/test+",
            "sequential:test-/wait-/test+",
            "sequential:wait+/test+/test-",
            "sequential:wait+/test-/test+",
            "sequential:wait+/wait+/wait+",
            "sequential:wait+/wait+/wait-",
            "sequential:wait+/wait-/wait+",
            "sequential:wait+/wait-/wait-",
            "sequential:wait-/test+/test-",
            "sequential:wait-/test-/test+",
            "sequential:wait-/wait+/wait+",
            "sequential:wait-/wait+/wait-",
            "sequential:wait-/wait-/wait+",
            "sequential:wait-/wait-/wait-"
          ]
        ],
        "ordered_evidence_ambiguities": [
          [
            "sequential:wait+",
            "sequential:wait-"
          ],
          [
            "sequential:test+/test-",
            "sequential:test-/test+",
            "sequential:wait+/wait+",
            "sequential:wait+/wait-",
            "sequential:wait-/wait+",
            "sequential:wait-/wait-"
          ],
          [
            "sequential:test+/test-/wait+",
            "sequential:test+/test-/wait-",
            "sequential:test+/wait+/test-",
            "sequential:test+/wait-/test-",
            "sequential:test-/test+/wait+",
            "sequential:test-/test+/wait-",
            "sequential:test-/wait+/test+",
            "sequential:test-/wait-/test+",
            "sequential:wait+/test+/test-",
            "sequential:wait+/test-/test+",
            "sequential:wait+/wait+/wait+",
            "sequential:wait+/wait+/wait-",
            "sequential:wait+/wait-/wait+",
            "sequential:wait+/wait-/wait-",
            "sequential:wait-/test+/test-",
            "sequential:wait-/test-/test+",
            "sequential:wait-/wait+/wait+",
            "sequential:wait-/wait+/wait-",
            "sequential:wait-/wait-/wait+",
            "sequential:wait-/wait-/wait-"
          ],
          [
            "sequential:test+/wait+/wait+",
            "sequential:test+/wait+/wait-",
            "sequential:test+/wait-/wait+",
            "sequential:test+/wait-/wait-",
            "sequential:wait+/test+/wait+",
            "sequential:wait+/test+/wait-",
            "sequential:wait+/wait+/test+",
            "sequential:wait+/wait-/test+",
            "sequential:wait-/test+/wait+",
            "sequential:wait-/test+/wait-",
            "sequential:wait-/wait+/test+",
            "sequential:wait-/wait-/test+"
          ],
          [
            "sequential:test-/wait+/wait+",
            "sequential:test-/wait+/wait-",
            "sequential:test-/wait-/wait+",
            "sequential:test-/wait-/wait-",
            "sequential:wait+/test-/wait+",
            "sequential:wait+/test-/wait-",
            "sequential:wait+/wait+/test-",
            "sequential:wait+/wait-/test-",
            "sequential:wait-/test-/wait+",
            "sequential:wait-/test-/wait-",
            "sequential:wait-/wait+/test-",
            "sequential:wait-/wait-/test-"
          ],
          [
            "sequential:test+/wait+",
            "sequential:test+/wait-",
            "sequential:wait+/test+",
            "sequential:wait-/test+"
          ],
          [
            "sequential:test+/test+/wait+",
            "sequential:test+/test+/wait-",
            "sequential:test+/wait+/test+",
            "sequential:test+/wait-/test+",
            "sequential:wait+/test+/test+",
            "sequential:wait-/test+/test+"
          ],
          [
            "sequential:test-/wait+",
            "sequential:test-/wait-",
            "sequential:wait+/test-",
            "sequential:wait-/test-"
          ],
          [
            "sequential:test-/test-/wait+",
            "sequential:test-/test-/wait-",
            "sequential:test-/wait+/test-",
            "sequential:test-/wait-/test-",
            "sequential:wait+/test-/test-",
            "sequential:wait-/test-/test-"
          ]
        ]
      },
      "audit_augmented": {
        "survey_spending_ambiguities": [],
        "ordered_evidence_ambiguities": [
          [
            "sequential:wait+",
            "sequential:wait-"
          ],
          [
            "sequential:wait+/wait+",
            "sequential:wait+/wait-",
            "sequential:wait-/wait+",
            "sequential:wait-/wait-"
          ],
          [
            "sequential:wait+/wait+/wait+",
            "sequential:wait+/wait+/wait-",
            "sequential:wait+/wait-/wait+",
            "sequential:wait+/wait-/wait-",
            "sequential:wait-/wait+/wait+",
            "sequential:wait-/wait+/wait-",
            "sequential:wait-/wait-/wait+",
            "sequential:wait-/wait-/wait-"
          ],
          [
            "sequential:test+/wait+/wait+",
            "sequential:test+/wait+/wait-",
            "sequential:test+/wait-/wait+",
            "sequential:test+/wait-/wait-",
            "sequential:wait+/test+/wait+",
            "sequential:wait+/test+/wait-",
            "sequential:wait+/wait+/test+",
            "sequential:wait+/wait-/test+",
            "sequential:wait-/test+/wait+",
            "sequential:wait-/test+/wait-",
            "sequential:wait-/wait+/test+",
            "sequential:wait-/wait-/test+"
          ],
          [
            "sequential:test-/wait+/wait+",
            "sequential:test-/wait+/wait-",
            "sequential:test-/wait-/wait+",
            "sequential:test-/wait-/wait-",
            "sequential:wait+/test-/wait+",
            "sequential:wait+/test-/wait-",
            "sequential:wait+/wait+/test-",
            "sequential:wait+/wait-/test-",
            "sequential:wait-/test-/wait+",
            "sequential:wait-/test-/wait-",
            "sequential:wait-/wait+/test-",
            "sequential:wait-/wait-/test-"
          ],
          [
            "sequential:test+/wait+",
            "sequential:test+/wait-",
            "sequential:wait+/test+",
            "sequential:wait-/test+"
          ],
          [
            "sequential:test+/test+/wait+",
            "sequential:test+/test+/wait-",
            "sequential:test+/wait+/test+",
            "sequential:test+/wait-/test+",
            "sequential:wait+/test+/test+",
            "sequential:wait-/test+/test+"
          ],
          [
            "sequential:test+/test-/wait+",
            "sequential:test+/test-/wait-",
            "sequential:test+/wait+/test-",
            "sequential:test+/wait-/test-",
            "sequential:test-/test+/wait+",
            "sequential:test-/test+/wait-",
            "sequential:test-/wait+/test+",
            "sequential:test-/wait-/test+",
            "sequential:wait+/test+/test-",
            "sequential:wait+/test-/test+",
            "sequential:wait-/test+/test-",
            "sequential:wait-/test-/test+"
          ],
          [
            "sequential:test-/wait+",
            "sequential:test-/wait-",
            "sequential:wait+/test-",
            "sequential:wait-/test-"
          ],
          [
            "sequential:test-/test-/wait+",
            "sequential:test-/test-/wait-",
            "sequential:test-/wait+/test-",
            "sequential:test-/wait-/test-",
            "sequential:wait+/test-/test-",
            "sequential:wait-/test-/test-"
          ],
          [
            "sequential:test+/test-",
            "sequential:test-/test+"
          ]
        ]
      },
      "histories": [
        {
          "id": "sequential:root",
          "t": 0,
          "history": [],
          "allowance_feasible": true,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": true,
          "survey_count": 0,
          "original_policy_node": "sequential:original:t0:p1_2:bunlimited",
          "original_optimal_actions": [
            "test"
          ],
          "allowance_policy_node": "sequential:allowance:t0:p1_2:b1",
          "allowance_optimal_actions": [
            "test"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": 1.0,
          "remaining_allowance_exact": "1",
          "path_likelihood_given_acquisition_choices": 1.0,
          "path_likelihood_given_acquisition_choices_exact": "1",
          "original_value": 21.44,
          "original_value_exact": "536/25",
          "allowance_value": 20.05,
          "allowance_value_exact": "401/20"
        },
        {
          "id": "sequential:test+",
          "t": 1,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": true,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t1:p7_10:bunlimited",
          "original_optimal_actions": [
            "test"
          ],
          "allowance_policy_node": "sequential:allowance:t1:p7_10:b1_2",
          "allowance_optimal_actions": [
            "test"
          ],
          "posterior": 0.7,
          "posterior_exact": "7/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 0.5,
          "waiting_spent_exact": "1/2",
          "total_spent": 1.0,
          "total_spent_exact": "1",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.5,
          "path_likelihood_given_acquisition_choices_exact": "1/2",
          "original_value": 32.99,
          "original_value_exact": "3299/100",
          "allowance_value": 31.1,
          "allowance_value_exact": "311/10"
        },
        {
          "id": "sequential:test+/test+",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": true,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t2:p49_58:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "sequential:allowance:t2:p49_58:b0",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.8448275862068966,
          "posterior_exact": "49/58",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.0,
          "waiting_spent_exact": "1",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.29,
          "path_likelihood_given_acquisition_choices_exact": "29/100",
          "original_value": 44.48275862068966,
          "original_value_exact": "1290/29",
          "allowance_value": 44.48275862068966,
          "allowance_value_exact": "1290/29"
        },
        {
          "id": "sequential:test+/test+/test+",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": false,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 3,
          "original_policy_node": "sequential:original:t3:p343_370:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": null,
          "allowance_optimal_actions": [],
          "posterior": 0.927027027027027,
          "posterior_exact": "343/370",
          "survey_spent": 1.5,
          "survey_spent_exact": "3/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 3.0,
          "total_spent_exact": "3",
          "remaining_allowance": -0.5,
          "remaining_allowance_exact": "-1/2",
          "path_likelihood_given_acquisition_choices": 0.185,
          "path_likelihood_given_acquisition_choices_exact": "37/200",
          "original_value": 52.7027027027027,
          "original_value_exact": "1950/37",
          "allowance_value": null,
          "allowance_value_exact": null
        },
        {
          "id": "sequential:test+/test+/test-",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": false,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 3,
          "original_policy_node": "sequential:original:t3:p7_10:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": null,
          "allowance_optimal_actions": [],
          "posterior": 0.7,
          "posterior_exact": "7/10",
          "survey_spent": 1.5,
          "survey_spent_exact": "3/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 3.0,
          "total_spent_exact": "3",
          "remaining_allowance": -0.5,
          "remaining_allowance_exact": "-1/2",
          "path_likelihood_given_acquisition_choices": 0.105,
          "path_likelihood_given_acquisition_choices_exact": "21/200",
          "original_value": 30.0,
          "original_value_exact": "30",
          "allowance_value": null,
          "allowance_value_exact": null
        },
        {
          "id": "sequential:test+/test+/wait+",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t3:p49_58:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p49_58:b0",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.8448275862068966,
          "posterior_exact": "49/58",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.5,
          "total_spent_exact": "5/2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.145,
          "path_likelihood_given_acquisition_choices_exact": "29/200",
          "original_value": 44.48275862068966,
          "original_value_exact": "1290/29",
          "allowance_value": 44.48275862068966,
          "allowance_value_exact": "1290/29"
        },
        {
          "id": "sequential:test+/test+/wait-",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t3:p49_58:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p49_58:b0",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.8448275862068966,
          "posterior_exact": "49/58",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.5,
          "total_spent_exact": "5/2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.145,
          "path_likelihood_given_acquisition_choices_exact": "29/200",
          "original_value": 44.48275862068966,
          "original_value_exact": "1290/29",
          "allowance_value": 44.48275862068966,
          "allowance_value_exact": "1290/29"
        },
        {
          "id": "sequential:test+/test-",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": true,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t2:p1_2:bunlimited",
          "original_optimal_actions": [
            "test"
          ],
          "allowance_policy_node": "sequential:allowance:t2:p1_2:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.0,
          "waiting_spent_exact": "1",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.21,
          "path_likelihood_given_acquisition_choices_exact": "21/100",
          "original_value": 19.5,
          "original_value_exact": "39/2",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "sequential:test+/test-/test+",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": false,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": false,
          "survey_count": 3,
          "original_policy_node": "sequential:original:t3:p7_10:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": null,
          "allowance_optimal_actions": [],
          "posterior": 0.7,
          "posterior_exact": "7/10",
          "survey_spent": 1.5,
          "survey_spent_exact": "3/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 3.0,
          "total_spent_exact": "3",
          "remaining_allowance": -0.5,
          "remaining_allowance_exact": "-1/2",
          "path_likelihood_given_acquisition_choices": 0.105,
          "path_likelihood_given_acquisition_choices_exact": "21/200",
          "original_value": 30.0,
          "original_value_exact": "30",
          "allowance_value": null,
          "allowance_value_exact": null
        },
        {
          "id": "sequential:test+/test-/test-",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": false,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": false,
          "survey_count": 3,
          "original_policy_node": "sequential:original:t3:p3_10:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": null,
          "allowance_optimal_actions": [],
          "posterior": 0.3,
          "posterior_exact": "3/10",
          "survey_spent": 1.5,
          "survey_spent_exact": "3/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 3.0,
          "total_spent_exact": "3",
          "remaining_allowance": -0.5,
          "remaining_allowance_exact": "-1/2",
          "path_likelihood_given_acquisition_choices": 0.105,
          "path_likelihood_given_acquisition_choices_exact": "21/200",
          "original_value": 11.0,
          "original_value_exact": "11",
          "allowance_value": null,
          "allowance_value_exact": null
        },
        {
          "id": "sequential:test+/test-/wait+",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t3:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p1_2:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.5,
          "total_spent_exact": "5/2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.105,
          "path_likelihood_given_acquisition_choices_exact": "21/200",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "sequential:test+/test-/wait-",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t3:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p1_2:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.5,
          "total_spent_exact": "5/2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.105,
          "path_likelihood_given_acquisition_choices_exact": "21/200",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "sequential:test+/wait+",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t2:p7_10:bunlimited",
          "original_optimal_actions": [
            "test"
          ],
          "allowance_policy_node": "sequential:allowance:t2:p7_10:b1_2",
          "allowance_optimal_actions": [
            "test"
          ],
          "posterior": 0.7,
          "posterior_exact": "7/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.0,
          "waiting_spent_exact": "1",
          "total_spent": 1.5,
          "total_spent_exact": "3/2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 31.1,
          "original_value_exact": "311/10",
          "allowance_value": 31.1,
          "allowance_value_exact": "311/10"
        },
        {
          "id": "sequential:test+/wait+/test+",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t3:p49_58:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p49_58:b0",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.8448275862068966,
          "posterior_exact": "49/58",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.5,
          "total_spent_exact": "5/2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.145,
          "path_likelihood_given_acquisition_choices_exact": "29/200",
          "original_value": 44.48275862068966,
          "original_value_exact": "1290/29",
          "allowance_value": 44.48275862068966,
          "allowance_value_exact": "1290/29"
        },
        {
          "id": "sequential:test+/wait+/test-",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t3:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p1_2:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.5,
          "total_spent_exact": "5/2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.105,
          "path_likelihood_given_acquisition_choices_exact": "21/200",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "sequential:test+/wait+/wait+",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t3:p7_10:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p7_10:b1_2",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.7,
          "posterior_exact": "7/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 30.0,
          "original_value_exact": "30",
          "allowance_value": 30.0,
          "allowance_value_exact": "30"
        },
        {
          "id": "sequential:test+/wait+/wait-",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t3:p7_10:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p7_10:b1_2",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.7,
          "posterior_exact": "7/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 30.0,
          "original_value_exact": "30",
          "allowance_value": 30.0,
          "allowance_value_exact": "30"
        },
        {
          "id": "sequential:test+/wait-",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t2:p7_10:bunlimited",
          "original_optimal_actions": [
            "test"
          ],
          "allowance_policy_node": "sequential:allowance:t2:p7_10:b1_2",
          "allowance_optimal_actions": [
            "test"
          ],
          "posterior": 0.7,
          "posterior_exact": "7/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.0,
          "waiting_spent_exact": "1",
          "total_spent": 1.5,
          "total_spent_exact": "3/2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 31.1,
          "original_value_exact": "311/10",
          "allowance_value": 31.1,
          "allowance_value_exact": "311/10"
        },
        {
          "id": "sequential:test+/wait-/test+",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t3:p49_58:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p49_58:b0",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.8448275862068966,
          "posterior_exact": "49/58",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.5,
          "total_spent_exact": "5/2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.145,
          "path_likelihood_given_acquisition_choices_exact": "29/200",
          "original_value": 44.48275862068966,
          "original_value_exact": "1290/29",
          "allowance_value": 44.48275862068966,
          "allowance_value_exact": "1290/29"
        },
        {
          "id": "sequential:test+/wait-/test-",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t3:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p1_2:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.5,
          "total_spent_exact": "5/2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.105,
          "path_likelihood_given_acquisition_choices_exact": "21/200",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "sequential:test+/wait-/wait+",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t3:p7_10:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p7_10:b1_2",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.7,
          "posterior_exact": "7/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 30.0,
          "original_value_exact": "30",
          "allowance_value": 30.0,
          "allowance_value_exact": "30"
        },
        {
          "id": "sequential:test+/wait-/wait-",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t3:p7_10:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p7_10:b1_2",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.7,
          "posterior_exact": "7/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 30.0,
          "original_value_exact": "30",
          "allowance_value": 30.0,
          "allowance_value_exact": "30"
        },
        {
          "id": "sequential:test-",
          "t": 1,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": true,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t1:p3_10:bunlimited",
          "original_optimal_actions": [
            "test"
          ],
          "allowance_policy_node": "sequential:allowance:t1:p3_10:b1_2",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.3,
          "posterior_exact": "3/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 0.5,
          "waiting_spent_exact": "1/2",
          "total_spent": 1.0,
          "total_spent_exact": "1",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.5,
          "path_likelihood_given_acquisition_choices_exact": "1/2",
          "original_value": 11.89,
          "original_value_exact": "1189/100",
          "allowance_value": 11.0,
          "allowance_value_exact": "11"
        },
        {
          "id": "sequential:test-/test+",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t2:p1_2:bunlimited",
          "original_optimal_actions": [
            "test"
          ],
          "allowance_policy_node": "sequential:allowance:t2:p1_2:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.0,
          "waiting_spent_exact": "1",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.21,
          "path_likelihood_given_acquisition_choices_exact": "21/100",
          "original_value": 19.5,
          "original_value_exact": "39/2",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "sequential:test-/test+/test+",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": false,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": false,
          "survey_count": 3,
          "original_policy_node": "sequential:original:t3:p7_10:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": null,
          "allowance_optimal_actions": [],
          "posterior": 0.7,
          "posterior_exact": "7/10",
          "survey_spent": 1.5,
          "survey_spent_exact": "3/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 3.0,
          "total_spent_exact": "3",
          "remaining_allowance": -0.5,
          "remaining_allowance_exact": "-1/2",
          "path_likelihood_given_acquisition_choices": 0.105,
          "path_likelihood_given_acquisition_choices_exact": "21/200",
          "original_value": 30.0,
          "original_value_exact": "30",
          "allowance_value": null,
          "allowance_value_exact": null
        },
        {
          "id": "sequential:test-/test+/test-",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": false,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": false,
          "survey_count": 3,
          "original_policy_node": "sequential:original:t3:p3_10:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": null,
          "allowance_optimal_actions": [],
          "posterior": 0.3,
          "posterior_exact": "3/10",
          "survey_spent": 1.5,
          "survey_spent_exact": "3/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 3.0,
          "total_spent_exact": "3",
          "remaining_allowance": -0.5,
          "remaining_allowance_exact": "-1/2",
          "path_likelihood_given_acquisition_choices": 0.105,
          "path_likelihood_given_acquisition_choices_exact": "21/200",
          "original_value": 11.0,
          "original_value_exact": "11",
          "allowance_value": null,
          "allowance_value_exact": null
        },
        {
          "id": "sequential:test-/test+/wait+",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t3:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p1_2:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.5,
          "total_spent_exact": "5/2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.105,
          "path_likelihood_given_acquisition_choices_exact": "21/200",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "sequential:test-/test+/wait-",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t3:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p1_2:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.5,
          "total_spent_exact": "5/2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.105,
          "path_likelihood_given_acquisition_choices_exact": "21/200",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "sequential:test-/test-",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t2:p9_58:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t2:p9_58:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.15517241379310345,
          "posterior_exact": "9/58",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.0,
          "waiting_spent_exact": "1",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.29,
          "path_likelihood_given_acquisition_choices_exact": "29/100",
          "original_value": 8.10344827586207,
          "original_value_exact": "235/29",
          "allowance_value": 8.10344827586207,
          "allowance_value_exact": "235/29"
        },
        {
          "id": "sequential:test-/test-/test+",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": false,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 3,
          "original_policy_node": "sequential:original:t3:p3_10:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": null,
          "allowance_optimal_actions": [],
          "posterior": 0.3,
          "posterior_exact": "3/10",
          "survey_spent": 1.5,
          "survey_spent_exact": "3/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 3.0,
          "total_spent_exact": "3",
          "remaining_allowance": -0.5,
          "remaining_allowance_exact": "-1/2",
          "path_likelihood_given_acquisition_choices": 0.105,
          "path_likelihood_given_acquisition_choices_exact": "21/200",
          "original_value": 11.0,
          "original_value_exact": "11",
          "allowance_value": null,
          "allowance_value_exact": null
        },
        {
          "id": "sequential:test-/test-/test-",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": false,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 3,
          "original_policy_node": "sequential:original:t3:p27_370:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": null,
          "allowance_optimal_actions": [],
          "posterior": 0.07297297297297298,
          "posterior_exact": "27/370",
          "survey_spent": 1.5,
          "survey_spent_exact": "3/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 3.0,
          "total_spent_exact": "3",
          "remaining_allowance": -0.5,
          "remaining_allowance_exact": "-1/2",
          "path_likelihood_given_acquisition_choices": 0.185,
          "path_likelihood_given_acquisition_choices_exact": "37/200",
          "original_value": 6.45945945945946,
          "original_value_exact": "239/37",
          "allowance_value": null,
          "allowance_value_exact": null
        },
        {
          "id": "sequential:test-/test-/wait+",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t3:p9_58:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p9_58:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.15517241379310345,
          "posterior_exact": "9/58",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.5,
          "total_spent_exact": "5/2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.145,
          "path_likelihood_given_acquisition_choices_exact": "29/200",
          "original_value": 8.10344827586207,
          "original_value_exact": "235/29",
          "allowance_value": 8.10344827586207,
          "allowance_value_exact": "235/29"
        },
        {
          "id": "sequential:test-/test-/wait-",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t3:p9_58:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p9_58:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.15517241379310345,
          "posterior_exact": "9/58",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.5,
          "total_spent_exact": "5/2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.145,
          "path_likelihood_given_acquisition_choices_exact": "29/200",
          "original_value": 8.10344827586207,
          "original_value_exact": "235/29",
          "allowance_value": 8.10344827586207,
          "allowance_value_exact": "235/29"
        },
        {
          "id": "sequential:test-/wait+",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t2:p3_10:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t2:p3_10:b1_2",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.3,
          "posterior_exact": "3/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.0,
          "waiting_spent_exact": "1",
          "total_spent": 1.5,
          "total_spent_exact": "3/2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 11.0,
          "original_value_exact": "11",
          "allowance_value": 11.0,
          "allowance_value_exact": "11"
        },
        {
          "id": "sequential:test-/wait+/test+",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t3:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p1_2:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.5,
          "total_spent_exact": "5/2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.105,
          "path_likelihood_given_acquisition_choices_exact": "21/200",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "sequential:test-/wait+/test-",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t3:p9_58:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p9_58:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.15517241379310345,
          "posterior_exact": "9/58",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.5,
          "total_spent_exact": "5/2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.145,
          "path_likelihood_given_acquisition_choices_exact": "29/200",
          "original_value": 8.10344827586207,
          "original_value_exact": "235/29",
          "allowance_value": 8.10344827586207,
          "allowance_value_exact": "235/29"
        },
        {
          "id": "sequential:test-/wait+/wait+",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t3:p3_10:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p3_10:b1_2",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.3,
          "posterior_exact": "3/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 11.0,
          "original_value_exact": "11",
          "allowance_value": 11.0,
          "allowance_value_exact": "11"
        },
        {
          "id": "sequential:test-/wait+/wait-",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t3:p3_10:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p3_10:b1_2",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.3,
          "posterior_exact": "3/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 11.0,
          "original_value_exact": "11",
          "allowance_value": 11.0,
          "allowance_value_exact": "11"
        },
        {
          "id": "sequential:test-/wait-",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t2:p3_10:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t2:p3_10:b1_2",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.3,
          "posterior_exact": "3/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.0,
          "waiting_spent_exact": "1",
          "total_spent": 1.5,
          "total_spent_exact": "3/2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 11.0,
          "original_value_exact": "11",
          "allowance_value": 11.0,
          "allowance_value_exact": "11"
        },
        {
          "id": "sequential:test-/wait-/test+",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t3:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p1_2:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.5,
          "total_spent_exact": "5/2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.105,
          "path_likelihood_given_acquisition_choices_exact": "21/200",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "sequential:test-/wait-/test-",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t3:p9_58:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p9_58:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.15517241379310345,
          "posterior_exact": "9/58",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.5,
          "total_spent_exact": "5/2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.145,
          "path_likelihood_given_acquisition_choices_exact": "29/200",
          "original_value": 8.10344827586207,
          "original_value_exact": "235/29",
          "allowance_value": 8.10344827586207,
          "allowance_value_exact": "235/29"
        },
        {
          "id": "sequential:test-/wait-/wait+",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t3:p3_10:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p3_10:b1_2",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.3,
          "posterior_exact": "3/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 11.0,
          "original_value_exact": "11",
          "allowance_value": 11.0,
          "allowance_value_exact": "11"
        },
        {
          "id": "sequential:test-/wait-/wait-",
          "t": 3,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t3:p3_10:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p3_10:b1_2",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.3,
          "posterior_exact": "3/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 11.0,
          "original_value_exact": "11",
          "allowance_value": 11.0,
          "allowance_value_exact": "11"
        },
        {
          "id": "sequential:wait+",
          "t": 1,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "sequential:original:t1:p1_2:bunlimited",
          "original_optimal_actions": [
            "test"
          ],
          "allowance_policy_node": "sequential:allowance:t1:p1_2:b1",
          "allowance_optimal_actions": [
            "test"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.5,
          "waiting_spent_exact": "1/2",
          "total_spent": 0.5,
          "total_spent_exact": "1/2",
          "remaining_allowance": 1.0,
          "remaining_allowance_exact": "1",
          "path_likelihood_given_acquisition_choices": 0.5,
          "path_likelihood_given_acquisition_choices_exact": "1/2",
          "original_value": 20.05,
          "original_value_exact": "401/20",
          "allowance_value": 20.05,
          "allowance_value_exact": "401/20"
        },
        {
          "id": "sequential:wait+/test+",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t2:p7_10:bunlimited",
          "original_optimal_actions": [
            "test"
          ],
          "allowance_policy_node": "sequential:allowance:t2:p7_10:b1_2",
          "allowance_optimal_actions": [
            "test"
          ],
          "posterior": 0.7,
          "posterior_exact": "7/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.0,
          "waiting_spent_exact": "1",
          "total_spent": 1.5,
          "total_spent_exact": "3/2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 31.1,
          "original_value_exact": "311/10",
          "allowance_value": 31.1,
          "allowance_value_exact": "311/10"
        },
        {
          "id": "sequential:wait+/test+/test+",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t3:p49_58:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p49_58:b0",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.8448275862068966,
          "posterior_exact": "49/58",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.5,
          "total_spent_exact": "5/2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.145,
          "path_likelihood_given_acquisition_choices_exact": "29/200",
          "original_value": 44.48275862068966,
          "original_value_exact": "1290/29",
          "allowance_value": 44.48275862068966,
          "allowance_value_exact": "1290/29"
        },
        {
          "id": "sequential:wait+/test+/test-",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t3:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p1_2:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.5,
          "total_spent_exact": "5/2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.105,
          "path_likelihood_given_acquisition_choices_exact": "21/200",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "sequential:wait+/test+/wait+",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t3:p7_10:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p7_10:b1_2",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.7,
          "posterior_exact": "7/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 30.0,
          "original_value_exact": "30",
          "allowance_value": 30.0,
          "allowance_value_exact": "30"
        },
        {
          "id": "sequential:wait+/test+/wait-",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t3:p7_10:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p7_10:b1_2",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.7,
          "posterior_exact": "7/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 30.0,
          "original_value_exact": "30",
          "allowance_value": 30.0,
          "allowance_value_exact": "30"
        },
        {
          "id": "sequential:wait+/test-",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t2:p3_10:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t2:p3_10:b1_2",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.3,
          "posterior_exact": "3/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.0,
          "waiting_spent_exact": "1",
          "total_spent": 1.5,
          "total_spent_exact": "3/2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 11.0,
          "original_value_exact": "11",
          "allowance_value": 11.0,
          "allowance_value_exact": "11"
        },
        {
          "id": "sequential:wait+/test-/test+",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t3:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p1_2:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.5,
          "total_spent_exact": "5/2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.105,
          "path_likelihood_given_acquisition_choices_exact": "21/200",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "sequential:wait+/test-/test-",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t3:p9_58:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p9_58:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.15517241379310345,
          "posterior_exact": "9/58",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.5,
          "total_spent_exact": "5/2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.145,
          "path_likelihood_given_acquisition_choices_exact": "29/200",
          "original_value": 8.10344827586207,
          "original_value_exact": "235/29",
          "allowance_value": 8.10344827586207,
          "allowance_value_exact": "235/29"
        },
        {
          "id": "sequential:wait+/test-/wait+",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t3:p3_10:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p3_10:b1_2",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.3,
          "posterior_exact": "3/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 11.0,
          "original_value_exact": "11",
          "allowance_value": 11.0,
          "allowance_value_exact": "11"
        },
        {
          "id": "sequential:wait+/test-/wait-",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t3:p3_10:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p3_10:b1_2",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.3,
          "posterior_exact": "3/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 11.0,
          "original_value_exact": "11",
          "allowance_value": 11.0,
          "allowance_value_exact": "11"
        },
        {
          "id": "sequential:wait+/wait+",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "sequential:original:t2:p1_2:bunlimited",
          "original_optimal_actions": [
            "test"
          ],
          "allowance_policy_node": "sequential:allowance:t2:p1_2:b1",
          "allowance_optimal_actions": [
            "test"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 1.0,
          "waiting_spent_exact": "1",
          "total_spent": 1.0,
          "total_spent_exact": "1",
          "remaining_allowance": 1.0,
          "remaining_allowance_exact": "1",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 19.5,
          "original_value_exact": "39/2",
          "allowance_value": 19.5,
          "allowance_value_exact": "39/2"
        },
        {
          "id": "sequential:wait+/wait+/test+",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t3:p7_10:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p7_10:b1_2",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.7,
          "posterior_exact": "7/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 30.0,
          "original_value_exact": "30",
          "allowance_value": 30.0,
          "allowance_value_exact": "30"
        },
        {
          "id": "sequential:wait+/wait+/test-",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t3:p3_10:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p3_10:b1_2",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.3,
          "posterior_exact": "3/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 11.0,
          "original_value_exact": "11",
          "allowance_value": 11.0,
          "allowance_value_exact": "11"
        },
        {
          "id": "sequential:wait+/wait+/wait+",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "sequential:original:t3:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p1_2:b1",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 1.5,
          "total_spent_exact": "3/2",
          "remaining_allowance": 1.0,
          "remaining_allowance_exact": "1",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "sequential:wait+/wait+/wait-",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "sequential:original:t3:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p1_2:b1",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 1.5,
          "total_spent_exact": "3/2",
          "remaining_allowance": 1.0,
          "remaining_allowance_exact": "1",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "sequential:wait+/wait-",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "sequential:original:t2:p1_2:bunlimited",
          "original_optimal_actions": [
            "test"
          ],
          "allowance_policy_node": "sequential:allowance:t2:p1_2:b1",
          "allowance_optimal_actions": [
            "test"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 1.0,
          "waiting_spent_exact": "1",
          "total_spent": 1.0,
          "total_spent_exact": "1",
          "remaining_allowance": 1.0,
          "remaining_allowance_exact": "1",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 19.5,
          "original_value_exact": "39/2",
          "allowance_value": 19.5,
          "allowance_value_exact": "39/2"
        },
        {
          "id": "sequential:wait+/wait-/test+",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t3:p7_10:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p7_10:b1_2",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.7,
          "posterior_exact": "7/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 30.0,
          "original_value_exact": "30",
          "allowance_value": 30.0,
          "allowance_value_exact": "30"
        },
        {
          "id": "sequential:wait+/wait-/test-",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t3:p3_10:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p3_10:b1_2",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.3,
          "posterior_exact": "3/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 11.0,
          "original_value_exact": "11",
          "allowance_value": 11.0,
          "allowance_value_exact": "11"
        },
        {
          "id": "sequential:wait+/wait-/wait+",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "sequential:original:t3:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p1_2:b1",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 1.5,
          "total_spent_exact": "3/2",
          "remaining_allowance": 1.0,
          "remaining_allowance_exact": "1",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "sequential:wait+/wait-/wait-",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "sequential:original:t3:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p1_2:b1",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 1.5,
          "total_spent_exact": "3/2",
          "remaining_allowance": 1.0,
          "remaining_allowance_exact": "1",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "sequential:wait-",
          "t": 1,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "sequential:original:t1:p1_2:bunlimited",
          "original_optimal_actions": [
            "test"
          ],
          "allowance_policy_node": "sequential:allowance:t1:p1_2:b1",
          "allowance_optimal_actions": [
            "test"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.5,
          "waiting_spent_exact": "1/2",
          "total_spent": 0.5,
          "total_spent_exact": "1/2",
          "remaining_allowance": 1.0,
          "remaining_allowance_exact": "1",
          "path_likelihood_given_acquisition_choices": 0.5,
          "path_likelihood_given_acquisition_choices_exact": "1/2",
          "original_value": 20.05,
          "original_value_exact": "401/20",
          "allowance_value": 20.05,
          "allowance_value_exact": "401/20"
        },
        {
          "id": "sequential:wait-/test+",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t2:p7_10:bunlimited",
          "original_optimal_actions": [
            "test"
          ],
          "allowance_policy_node": "sequential:allowance:t2:p7_10:b1_2",
          "allowance_optimal_actions": [
            "test"
          ],
          "posterior": 0.7,
          "posterior_exact": "7/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.0,
          "waiting_spent_exact": "1",
          "total_spent": 1.5,
          "total_spent_exact": "3/2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 31.1,
          "original_value_exact": "311/10",
          "allowance_value": 31.1,
          "allowance_value_exact": "311/10"
        },
        {
          "id": "sequential:wait-/test+/test+",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t3:p49_58:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p49_58:b0",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.8448275862068966,
          "posterior_exact": "49/58",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.5,
          "total_spent_exact": "5/2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.145,
          "path_likelihood_given_acquisition_choices_exact": "29/200",
          "original_value": 44.48275862068966,
          "original_value_exact": "1290/29",
          "allowance_value": 44.48275862068966,
          "allowance_value_exact": "1290/29"
        },
        {
          "id": "sequential:wait-/test+/test-",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t3:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p1_2:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.5,
          "total_spent_exact": "5/2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.105,
          "path_likelihood_given_acquisition_choices_exact": "21/200",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "sequential:wait-/test+/wait+",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t3:p7_10:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p7_10:b1_2",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.7,
          "posterior_exact": "7/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 30.0,
          "original_value_exact": "30",
          "allowance_value": 30.0,
          "allowance_value_exact": "30"
        },
        {
          "id": "sequential:wait-/test+/wait-",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t3:p7_10:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p7_10:b1_2",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.7,
          "posterior_exact": "7/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 30.0,
          "original_value_exact": "30",
          "allowance_value": 30.0,
          "allowance_value_exact": "30"
        },
        {
          "id": "sequential:wait-/test-",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t2:p3_10:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t2:p3_10:b1_2",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.3,
          "posterior_exact": "3/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.0,
          "waiting_spent_exact": "1",
          "total_spent": 1.5,
          "total_spent_exact": "3/2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 11.0,
          "original_value_exact": "11",
          "allowance_value": 11.0,
          "allowance_value_exact": "11"
        },
        {
          "id": "sequential:wait-/test-/test+",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t3:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p1_2:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.5,
          "total_spent_exact": "5/2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.105,
          "path_likelihood_given_acquisition_choices_exact": "21/200",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "sequential:wait-/test-/test-",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 2,
          "original_policy_node": "sequential:original:t3:p9_58:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p9_58:b0",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.15517241379310345,
          "posterior_exact": "9/58",
          "survey_spent": 1.0,
          "survey_spent_exact": "1",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.5,
          "total_spent_exact": "5/2",
          "remaining_allowance": 0.0,
          "remaining_allowance_exact": "0",
          "path_likelihood_given_acquisition_choices": 0.145,
          "path_likelihood_given_acquisition_choices_exact": "29/200",
          "original_value": 8.10344827586207,
          "original_value_exact": "235/29",
          "allowance_value": 8.10344827586207,
          "allowance_value_exact": "235/29"
        },
        {
          "id": "sequential:wait-/test-/wait+",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t3:p3_10:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p3_10:b1_2",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.3,
          "posterior_exact": "3/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 11.0,
          "original_value_exact": "11",
          "allowance_value": 11.0,
          "allowance_value_exact": "11"
        },
        {
          "id": "sequential:wait-/test-/wait-",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t3:p3_10:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p3_10:b1_2",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.3,
          "posterior_exact": "3/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 11.0,
          "original_value_exact": "11",
          "allowance_value": 11.0,
          "allowance_value_exact": "11"
        },
        {
          "id": "sequential:wait-/wait+",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "sequential:original:t2:p1_2:bunlimited",
          "original_optimal_actions": [
            "test"
          ],
          "allowance_policy_node": "sequential:allowance:t2:p1_2:b1",
          "allowance_optimal_actions": [
            "test"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 1.0,
          "waiting_spent_exact": "1",
          "total_spent": 1.0,
          "total_spent_exact": "1",
          "remaining_allowance": 1.0,
          "remaining_allowance_exact": "1",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 19.5,
          "original_value_exact": "39/2",
          "allowance_value": 19.5,
          "allowance_value_exact": "39/2"
        },
        {
          "id": "sequential:wait-/wait+/test+",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t3:p7_10:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p7_10:b1_2",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.7,
          "posterior_exact": "7/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 30.0,
          "original_value_exact": "30",
          "allowance_value": 30.0,
          "allowance_value_exact": "30"
        },
        {
          "id": "sequential:wait-/wait+/test-",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t3:p3_10:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p3_10:b1_2",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.3,
          "posterior_exact": "3/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 11.0,
          "original_value_exact": "11",
          "allowance_value": 11.0,
          "allowance_value_exact": "11"
        },
        {
          "id": "sequential:wait-/wait+/wait+",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "sequential:original:t3:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p1_2:b1",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 1.5,
          "total_spent_exact": "3/2",
          "remaining_allowance": 1.0,
          "remaining_allowance_exact": "1",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "sequential:wait-/wait+/wait-",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "sequential:original:t3:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p1_2:b1",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 1.5,
          "total_spent_exact": "3/2",
          "remaining_allowance": 1.0,
          "remaining_allowance_exact": "1",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "sequential:wait-/wait-",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "sequential:original:t2:p1_2:bunlimited",
          "original_optimal_actions": [
            "test"
          ],
          "allowance_policy_node": "sequential:allowance:t2:p1_2:b1",
          "allowance_optimal_actions": [
            "test"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 1.0,
          "waiting_spent_exact": "1",
          "total_spent": 1.0,
          "total_spent_exact": "1",
          "remaining_allowance": 1.0,
          "remaining_allowance_exact": "1",
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 19.5,
          "original_value_exact": "39/2",
          "allowance_value": 19.5,
          "allowance_value_exact": "39/2"
        },
        {
          "id": "sequential:wait-/wait-/test+",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t3:p7_10:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p7_10:b1_2",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.7,
          "posterior_exact": "7/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 30.0,
          "original_value_exact": "30",
          "allowance_value": 30.0,
          "allowance_value_exact": "30"
        },
        {
          "id": "sequential:wait-/wait-/test-",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "sequential:original:t3:p3_10:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p3_10:b1_2",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.3,
          "posterior_exact": "3/10",
          "survey_spent": 0.5,
          "survey_spent_exact": "1/2",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 2.0,
          "total_spent_exact": "2",
          "remaining_allowance": 0.5,
          "remaining_allowance_exact": "1/2",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 11.0,
          "original_value_exact": "11",
          "allowance_value": 11.0,
          "allowance_value_exact": "11"
        },
        {
          "id": "sequential:wait-/wait-/wait+",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "sequential:original:t3:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p1_2:b1",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 1.5,
          "total_spent_exact": "3/2",
          "remaining_allowance": 1.0,
          "remaining_allowance_exact": "1",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "sequential:wait-/wait-/wait-",
          "t": 3,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 3
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "sequential:original:t3:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "sequential:allowance:t3:p1_2:b1",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 1.5,
          "waiting_spent_exact": "3/2",
          "total_spent": 1.5,
          "total_spent_exact": "3/2",
          "remaining_allowance": 1.0,
          "remaining_allowance_exact": "1",
          "path_likelihood_given_acquisition_choices": 0.125,
          "path_likelihood_given_acquisition_choices_exact": "1/8",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        }
      ],
      "groups": [
        {
          "id": "sequential:t0:p1_2",
          "preset_id": "sequential",
          "t": 0,
          "history_ids": [
            "sequential:root"
          ],
          "history_count": 1,
          "distinct_allowances": 1,
          "common_policy_node": "sequential:allowance:t0:p1_2:b1",
          "common_optimal_actions": [
            "test"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "sequential:root",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [
            "sequential:root"
          ],
          "allowance_optimal_reachable_history_ids": [
            "sequential:root"
          ],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": false,
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "minimum_remaining_allowance": 1.0,
          "minimum_remaining_allowance_exact": "1",
          "common_value": 20.05,
          "common_value_exact": "401/20",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": "sequential:allowance:t0:p1_2:b1",
          "original_optimal_only_max_regret": 0.0,
          "original_optimal_only_max_regret_exact": "0"
        },
        {
          "id": "sequential:t1:p3_10",
          "preset_id": "sequential",
          "t": 1,
          "history_ids": [
            "sequential:test-"
          ],
          "history_count": 1,
          "distinct_allowances": 1,
          "common_policy_node": "sequential:allowance:t1:p3_10:b1_2",
          "common_optimal_actions": [
            "limited"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "sequential:test-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [
            "sequential:test-"
          ],
          "allowance_optimal_reachable_history_ids": [
            "sequential:test-"
          ],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": false,
          "posterior": 0.3,
          "posterior_exact": "3/10",
          "minimum_remaining_allowance": 0.5,
          "minimum_remaining_allowance_exact": "1/2",
          "common_value": 11.0,
          "common_value_exact": "11",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": "sequential:allowance:t1:p3_10:b1_2",
          "original_optimal_only_max_regret": 0.0,
          "original_optimal_only_max_regret_exact": "0"
        },
        {
          "id": "sequential:t1:p1_2",
          "preset_id": "sequential",
          "t": 1,
          "history_ids": [
            "sequential:wait+",
            "sequential:wait-"
          ],
          "history_count": 2,
          "distinct_allowances": 1,
          "common_policy_node": "sequential:allowance:t1:p1_2:b1",
          "common_optimal_actions": [
            "test"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "sequential:wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "minimum_remaining_allowance": 1.0,
          "minimum_remaining_allowance_exact": "1",
          "common_value": 20.05,
          "common_value_exact": "401/20",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        },
        {
          "id": "sequential:t1:p7_10",
          "preset_id": "sequential",
          "t": 1,
          "history_ids": [
            "sequential:test+"
          ],
          "history_count": 1,
          "distinct_allowances": 1,
          "common_policy_node": "sequential:allowance:t1:p7_10:b1_2",
          "common_optimal_actions": [
            "test"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "sequential:test+",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [
            "sequential:test+"
          ],
          "allowance_optimal_reachable_history_ids": [
            "sequential:test+"
          ],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": false,
          "posterior": 0.7,
          "posterior_exact": "7/10",
          "minimum_remaining_allowance": 0.5,
          "minimum_remaining_allowance_exact": "1/2",
          "common_value": 31.1,
          "common_value_exact": "311/10",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": "sequential:allowance:t1:p7_10:b1_2",
          "original_optimal_only_max_regret": 0.0,
          "original_optimal_only_max_regret_exact": "0"
        },
        {
          "id": "sequential:t2:p9_58",
          "preset_id": "sequential",
          "t": 2,
          "history_ids": [
            "sequential:test-/test-"
          ],
          "history_count": 1,
          "distinct_allowances": 1,
          "common_policy_node": "sequential:allowance:t2:p9_58:b0",
          "common_optimal_actions": [
            "limited"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "sequential:test-/test-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [
            "sequential:test-/test-"
          ],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": false,
          "posterior": 0.15517241379310345,
          "posterior_exact": "9/58",
          "minimum_remaining_allowance": 0.0,
          "minimum_remaining_allowance_exact": "0",
          "common_value": 8.10344827586207,
          "common_value_exact": "235/29",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": "sequential:allowance:t2:p9_58:b0",
          "original_optimal_only_max_regret": 0.0,
          "original_optimal_only_max_regret_exact": "0"
        },
        {
          "id": "sequential:t2:p3_10",
          "preset_id": "sequential",
          "t": 2,
          "history_ids": [
            "sequential:test-/wait+",
            "sequential:test-/wait-",
            "sequential:wait+/test-",
            "sequential:wait-/test-"
          ],
          "history_count": 4,
          "distinct_allowances": 1,
          "common_policy_node": "sequential:allowance:t2:p3_10:b1_2",
          "common_optimal_actions": [
            "limited"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "sequential:test-/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:test-/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait+/test-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait-/test-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.3,
          "posterior_exact": "3/10",
          "minimum_remaining_allowance": 0.5,
          "minimum_remaining_allowance_exact": "1/2",
          "common_value": 11.0,
          "common_value_exact": "11",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        },
        {
          "id": "sequential:t2:p1_2",
          "preset_id": "sequential",
          "t": 2,
          "history_ids": [
            "sequential:test+/test-",
            "sequential:test-/test+",
            "sequential:wait+/wait+",
            "sequential:wait+/wait-",
            "sequential:wait-/wait+",
            "sequential:wait-/wait-"
          ],
          "history_count": 6,
          "distinct_allowances": 2,
          "common_policy_node": "sequential:allowance:t2:p1_2:b0",
          "common_optimal_actions": [
            "limited"
          ],
          "zero_regret_common_policy_exists": false,
          "members": [
            {
              "history_id": "sequential:test+/test-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:test-/test+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait+/wait+",
              "regret": 4.5,
              "regret_exact": "9/2"
            },
            {
              "history_id": "sequential:wait+/wait-",
              "regret": 4.5,
              "regret_exact": "9/2"
            },
            {
              "history_id": "sequential:wait-/wait+",
              "regret": 4.5,
              "regret_exact": "9/2"
            },
            {
              "history_id": "sequential:wait-/wait-",
              "regret": 4.5,
              "regret_exact": "9/2"
            }
          ],
          "original_optimal_reachable_history_ids": [
            "sequential:test+/test-",
            "sequential:test-/test+"
          ],
          "allowance_optimal_reachable_history_ids": [
            "sequential:test+/test-"
          ],
          "survey_spending_ambiguous": true,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "minimum_remaining_allowance": 0.0,
          "minimum_remaining_allowance_exact": "0",
          "common_value": 15.0,
          "common_value_exact": "15",
          "max_regret": 4.5,
          "max_regret_exact": "9/2",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": "sequential:allowance:t2:p1_2:b0",
          "original_optimal_only_max_regret": 0.0,
          "original_optimal_only_max_regret_exact": "0"
        },
        {
          "id": "sequential:t2:p7_10",
          "preset_id": "sequential",
          "t": 2,
          "history_ids": [
            "sequential:test+/wait+",
            "sequential:test+/wait-",
            "sequential:wait+/test+",
            "sequential:wait-/test+"
          ],
          "history_count": 4,
          "distinct_allowances": 1,
          "common_policy_node": "sequential:allowance:t2:p7_10:b1_2",
          "common_optimal_actions": [
            "test"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "sequential:test+/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:test+/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait+/test+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait-/test+",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.7,
          "posterior_exact": "7/10",
          "minimum_remaining_allowance": 0.5,
          "minimum_remaining_allowance_exact": "1/2",
          "common_value": 31.1,
          "common_value_exact": "311/10",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        },
        {
          "id": "sequential:t2:p49_58",
          "preset_id": "sequential",
          "t": 2,
          "history_ids": [
            "sequential:test+/test+"
          ],
          "history_count": 1,
          "distinct_allowances": 1,
          "common_policy_node": "sequential:allowance:t2:p49_58:b0",
          "common_optimal_actions": [
            "full"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "sequential:test+/test+",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [
            "sequential:test+/test+"
          ],
          "allowance_optimal_reachable_history_ids": [
            "sequential:test+/test+"
          ],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": false,
          "posterior": 0.8448275862068966,
          "posterior_exact": "49/58",
          "minimum_remaining_allowance": 0.0,
          "minimum_remaining_allowance_exact": "0",
          "common_value": 44.48275862068966,
          "common_value_exact": "1290/29",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": "sequential:allowance:t2:p49_58:b0",
          "original_optimal_only_max_regret": 0.0,
          "original_optimal_only_max_regret_exact": "0"
        },
        {
          "id": "sequential:t3:p9_58",
          "preset_id": "sequential",
          "t": 3,
          "history_ids": [
            "sequential:test-/test-/wait+",
            "sequential:test-/test-/wait-",
            "sequential:test-/wait+/test-",
            "sequential:test-/wait-/test-",
            "sequential:wait+/test-/test-",
            "sequential:wait-/test-/test-"
          ],
          "history_count": 6,
          "distinct_allowances": 1,
          "common_policy_node": "sequential:allowance:t3:p9_58:b0",
          "common_optimal_actions": [
            "limited"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "sequential:test-/test-/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:test-/test-/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:test-/wait+/test-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:test-/wait-/test-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait+/test-/test-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait-/test-/test-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.15517241379310345,
          "posterior_exact": "9/58",
          "minimum_remaining_allowance": 0.0,
          "minimum_remaining_allowance_exact": "0",
          "common_value": 8.10344827586207,
          "common_value_exact": "235/29",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        },
        {
          "id": "sequential:t3:p3_10",
          "preset_id": "sequential",
          "t": 3,
          "history_ids": [
            "sequential:test-/wait+/wait+",
            "sequential:test-/wait+/wait-",
            "sequential:test-/wait-/wait+",
            "sequential:test-/wait-/wait-",
            "sequential:wait+/test-/wait+",
            "sequential:wait+/test-/wait-",
            "sequential:wait+/wait+/test-",
            "sequential:wait+/wait-/test-",
            "sequential:wait-/test-/wait+",
            "sequential:wait-/test-/wait-",
            "sequential:wait-/wait+/test-",
            "sequential:wait-/wait-/test-"
          ],
          "history_count": 12,
          "distinct_allowances": 1,
          "common_policy_node": "sequential:allowance:t3:p3_10:b1_2",
          "common_optimal_actions": [
            "limited"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "sequential:test-/wait+/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:test-/wait+/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:test-/wait-/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:test-/wait-/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait+/test-/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait+/test-/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait+/wait+/test-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait+/wait-/test-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait-/test-/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait-/test-/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait-/wait+/test-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait-/wait-/test-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.3,
          "posterior_exact": "3/10",
          "minimum_remaining_allowance": 0.5,
          "minimum_remaining_allowance_exact": "1/2",
          "common_value": 11.0,
          "common_value_exact": "11",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        },
        {
          "id": "sequential:t3:p1_2",
          "preset_id": "sequential",
          "t": 3,
          "history_ids": [
            "sequential:test+/test-/wait+",
            "sequential:test+/test-/wait-",
            "sequential:test+/wait+/test-",
            "sequential:test+/wait-/test-",
            "sequential:test-/test+/wait+",
            "sequential:test-/test+/wait-",
            "sequential:test-/wait+/test+",
            "sequential:test-/wait-/test+",
            "sequential:wait+/test+/test-",
            "sequential:wait+/test-/test+",
            "sequential:wait+/wait+/wait+",
            "sequential:wait+/wait+/wait-",
            "sequential:wait+/wait-/wait+",
            "sequential:wait+/wait-/wait-",
            "sequential:wait-/test+/test-",
            "sequential:wait-/test-/test+",
            "sequential:wait-/wait+/wait+",
            "sequential:wait-/wait+/wait-",
            "sequential:wait-/wait-/wait+",
            "sequential:wait-/wait-/wait-"
          ],
          "history_count": 20,
          "distinct_allowances": 2,
          "common_policy_node": "sequential:allowance:t3:p1_2:b0",
          "common_optimal_actions": [
            "limited"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "sequential:test+/test-/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:test+/test-/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:test+/wait+/test-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:test+/wait-/test-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:test-/test+/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:test-/test+/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:test-/wait+/test+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:test-/wait-/test+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait+/test+/test-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait+/test-/test+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait+/wait+/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait+/wait+/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait+/wait-/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait+/wait-/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait-/test+/test-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait-/test-/test+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait-/wait+/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait-/wait+/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait-/wait-/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait-/wait-/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": true,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "minimum_remaining_allowance": 0.0,
          "minimum_remaining_allowance_exact": "0",
          "common_value": 15.0,
          "common_value_exact": "15",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        },
        {
          "id": "sequential:t3:p7_10",
          "preset_id": "sequential",
          "t": 3,
          "history_ids": [
            "sequential:test+/wait+/wait+",
            "sequential:test+/wait+/wait-",
            "sequential:test+/wait-/wait+",
            "sequential:test+/wait-/wait-",
            "sequential:wait+/test+/wait+",
            "sequential:wait+/test+/wait-",
            "sequential:wait+/wait+/test+",
            "sequential:wait+/wait-/test+",
            "sequential:wait-/test+/wait+",
            "sequential:wait-/test+/wait-",
            "sequential:wait-/wait+/test+",
            "sequential:wait-/wait-/test+"
          ],
          "history_count": 12,
          "distinct_allowances": 1,
          "common_policy_node": "sequential:allowance:t3:p7_10:b1_2",
          "common_optimal_actions": [
            "full"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "sequential:test+/wait+/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:test+/wait+/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:test+/wait-/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:test+/wait-/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait+/test+/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait+/test+/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait+/wait+/test+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait+/wait-/test+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait-/test+/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait-/test+/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait-/wait+/test+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait-/wait-/test+",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.7,
          "posterior_exact": "7/10",
          "minimum_remaining_allowance": 0.5,
          "minimum_remaining_allowance_exact": "1/2",
          "common_value": 30.0,
          "common_value_exact": "30",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        },
        {
          "id": "sequential:t3:p49_58",
          "preset_id": "sequential",
          "t": 3,
          "history_ids": [
            "sequential:test+/test+/wait+",
            "sequential:test+/test+/wait-",
            "sequential:test+/wait+/test+",
            "sequential:test+/wait-/test+",
            "sequential:wait+/test+/test+",
            "sequential:wait-/test+/test+"
          ],
          "history_count": 6,
          "distinct_allowances": 1,
          "common_policy_node": "sequential:allowance:t3:p49_58:b0",
          "common_optimal_actions": [
            "full"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "sequential:test+/test+/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:test+/test+/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:test+/wait+/test+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:test+/wait-/test+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait+/test+/test+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "sequential:wait-/test+/test+",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.8448275862068966,
          "posterior_exact": "49/58",
          "minimum_remaining_allowance": 0.0,
          "minimum_remaining_allowance_exact": "0",
          "common_value": 44.48275862068966,
          "common_value_exact": "1290/29",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        }
      ],
      "initial_allowance": 1.0,
      "initial_allowance_exact": "1",
      "original_root_value": 21.44,
      "original_root_value_exact": "536/25",
      "allowance_root_value": 20.05,
      "allowance_root_value_exact": "401/20",
      "max_regret": 4.5,
      "max_regret_exact": "9/2"
    },
    {
      "id": "nonmyopic",
      "label": "The first test guides the second",
      "config": {
        "prior": 0.2,
        "accuracy": 0.8,
        "passive": 0.5,
        "cost": 0.0,
        "delay": 0.0,
        "deadline": 2,
        "latency": 1
      },
      "config_exact": {
        "prior": "1/5",
        "accuracy": "4/5",
        "passive": "1/2",
        "cost": "0",
        "delay": "0",
        "deadline": "2",
        "latency": "1"
      },
      "free_surveys_unconstrained": true,
      "original_root_policy_node": "nonmyopic:original:t0:p1_5:bunlimited",
      "allowance_root_policy_node": "nonmyopic:allowance:t0:p1_5:bunlimited",
      "original_root_optimal_actions": [
        "test"
      ],
      "allowance_root_optimal_actions": [
        "test"
      ],
      "counts": {
        "original_histories": 21,
        "allowance_feasible_histories": 21,
        "original_optimal_reachable_histories": 9,
        "allowance_optimal_reachable_histories": 9,
        "original_time_belief_groups": 9,
        "time_belief_groups": 9,
        "augmented_groups": 9,
        "mixed_allowance_groups": 0,
        "harmful_groups": 0,
        "harmful_groups_with_original_optimal_reachable_member": 0,
        "harmful_groups_if_original_optimal_history_is_known": 0
      },
      "original_state_zero_regret": true,
      "augmented_state_zero_regret": true,
      "audit_time_belief": {
        "survey_spending_ambiguities": [],
        "ordered_evidence_ambiguities": [
          [
            "nonmyopic:wait+",
            "nonmyopic:wait-"
          ],
          [
            "nonmyopic:test+/test-",
            "nonmyopic:test-/test+",
            "nonmyopic:wait+/wait+",
            "nonmyopic:wait+/wait-",
            "nonmyopic:wait-/wait+",
            "nonmyopic:wait-/wait-"
          ],
          [
            "nonmyopic:test+/wait+",
            "nonmyopic:test+/wait-",
            "nonmyopic:wait+/test+",
            "nonmyopic:wait-/test+"
          ],
          [
            "nonmyopic:test-/wait+",
            "nonmyopic:test-/wait-",
            "nonmyopic:wait+/test-",
            "nonmyopic:wait-/test-"
          ]
        ]
      },
      "audit_augmented": {
        "survey_spending_ambiguities": [],
        "ordered_evidence_ambiguities": [
          [
            "nonmyopic:wait+",
            "nonmyopic:wait-"
          ],
          [
            "nonmyopic:test+/test-",
            "nonmyopic:test-/test+",
            "nonmyopic:wait+/wait+",
            "nonmyopic:wait+/wait-",
            "nonmyopic:wait-/wait+",
            "nonmyopic:wait-/wait-"
          ],
          [
            "nonmyopic:test+/wait+",
            "nonmyopic:test+/wait-",
            "nonmyopic:wait+/test+",
            "nonmyopic:wait-/test+"
          ],
          [
            "nonmyopic:test-/wait+",
            "nonmyopic:test-/wait-",
            "nonmyopic:wait+/test-",
            "nonmyopic:wait-/test-"
          ]
        ]
      },
      "histories": [
        {
          "id": "nonmyopic:root",
          "t": 0,
          "history": [],
          "allowance_feasible": true,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": true,
          "survey_count": 0,
          "original_policy_node": "nonmyopic:original:t0:p1_5:bunlimited",
          "original_optimal_actions": [
            "test"
          ],
          "allowance_policy_node": "nonmyopic:allowance:t0:p1_5:bunlimited",
          "allowance_optimal_actions": [
            "test"
          ],
          "posterior": 0.2,
          "posterior_exact": "1/5",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": null,
          "remaining_allowance_exact": null,
          "path_likelihood_given_acquisition_choices": 1.0,
          "path_likelihood_given_acquisition_choices_exact": "1",
          "original_value": 12.04,
          "original_value_exact": "301/25",
          "allowance_value": 12.04,
          "allowance_value_exact": "301/25"
        },
        {
          "id": "nonmyopic:test+",
          "t": 1,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": true,
          "survey_count": 1,
          "original_policy_node": "nonmyopic:original:t1:p1_2:bunlimited",
          "original_optimal_actions": [
            "test"
          ],
          "allowance_policy_node": "nonmyopic:allowance:t1:p1_2:bunlimited",
          "allowance_optimal_actions": [
            "test"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": null,
          "remaining_allowance_exact": null,
          "path_likelihood_given_acquisition_choices": 0.32,
          "path_likelihood_given_acquisition_choices_exact": "8/25",
          "original_value": 24.5,
          "original_value_exact": "49/2",
          "allowance_value": 24.5,
          "allowance_value_exact": "49/2"
        },
        {
          "id": "nonmyopic:test+/test+",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": true,
          "survey_count": 2,
          "original_policy_node": "nonmyopic:original:t2:p4_5:bunlimited",
          "original_optimal_actions": [
            "full"
          ],
          "allowance_policy_node": "nonmyopic:allowance:t2:p4_5:bunlimited",
          "allowance_optimal_actions": [
            "full"
          ],
          "posterior": 0.8,
          "posterior_exact": "4/5",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": null,
          "remaining_allowance_exact": null,
          "path_likelihood_given_acquisition_choices": 0.16,
          "path_likelihood_given_acquisition_choices_exact": "4/25",
          "original_value": 40.0,
          "original_value_exact": "40",
          "allowance_value": 40.0,
          "allowance_value_exact": "40"
        },
        {
          "id": "nonmyopic:test+/test-",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": true,
          "survey_count": 2,
          "original_policy_node": "nonmyopic:original:t2:p1_5:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "nonmyopic:allowance:t2:p1_5:bunlimited",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.2,
          "posterior_exact": "1/5",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": null,
          "remaining_allowance_exact": null,
          "path_likelihood_given_acquisition_choices": 0.16,
          "path_likelihood_given_acquisition_choices_exact": "4/25",
          "original_value": 9.0,
          "original_value_exact": "9",
          "allowance_value": 9.0,
          "allowance_value_exact": "9"
        },
        {
          "id": "nonmyopic:test+/wait+",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "nonmyopic:original:t2:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "nonmyopic:allowance:t2:p1_2:bunlimited",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": null,
          "remaining_allowance_exact": null,
          "path_likelihood_given_acquisition_choices": 0.16,
          "path_likelihood_given_acquisition_choices_exact": "4/25",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "nonmyopic:test+/wait-",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "nonmyopic:original:t2:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "nonmyopic:allowance:t2:p1_2:bunlimited",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": null,
          "remaining_allowance_exact": null,
          "path_likelihood_given_acquisition_choices": 0.16,
          "path_likelihood_given_acquisition_choices_exact": "4/25",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "nonmyopic:test-",
          "t": 1,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": true,
          "survey_count": 1,
          "original_policy_node": "nonmyopic:original:t1:p1_17:bunlimited",
          "original_optimal_actions": [
            "limited",
            "wait",
            "test"
          ],
          "allowance_policy_node": "nonmyopic:allowance:t1:p1_17:bunlimited",
          "allowance_optimal_actions": [
            "limited",
            "wait",
            "test"
          ],
          "posterior": 0.058823529411764705,
          "posterior_exact": "1/17",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": null,
          "remaining_allowance_exact": null,
          "path_likelihood_given_acquisition_choices": 0.68,
          "path_likelihood_given_acquisition_choices_exact": "17/25",
          "original_value": 6.176470588235294,
          "original_value_exact": "105/17",
          "allowance_value": 6.176470588235294,
          "allowance_value_exact": "105/17"
        },
        {
          "id": "nonmyopic:test-/test+",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": true,
          "survey_count": 2,
          "original_policy_node": "nonmyopic:original:t2:p1_5:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "nonmyopic:allowance:t2:p1_5:bunlimited",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.2,
          "posterior_exact": "1/5",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": null,
          "remaining_allowance_exact": null,
          "path_likelihood_given_acquisition_choices": 0.16,
          "path_likelihood_given_acquisition_choices_exact": "4/25",
          "original_value": 9.0,
          "original_value_exact": "9",
          "allowance_value": 9.0,
          "allowance_value_exact": "9"
        },
        {
          "id": "nonmyopic:test-/test-",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": true,
          "survey_count": 2,
          "original_policy_node": "nonmyopic:original:t2:p1_65:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "nonmyopic:allowance:t2:p1_65:bunlimited",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.015384615384615385,
          "posterior_exact": "1/65",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": null,
          "remaining_allowance_exact": null,
          "path_likelihood_given_acquisition_choices": 0.52,
          "path_likelihood_given_acquisition_choices_exact": "13/25",
          "original_value": 5.3076923076923075,
          "original_value_exact": "69/13",
          "allowance_value": 5.3076923076923075,
          "allowance_value_exact": "69/13"
        },
        {
          "id": "nonmyopic:test-/wait+",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": true,
          "survey_count": 1,
          "original_policy_node": "nonmyopic:original:t2:p1_17:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "nonmyopic:allowance:t2:p1_17:bunlimited",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.058823529411764705,
          "posterior_exact": "1/17",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": null,
          "remaining_allowance_exact": null,
          "path_likelihood_given_acquisition_choices": 0.34,
          "path_likelihood_given_acquisition_choices_exact": "17/50",
          "original_value": 6.176470588235294,
          "original_value_exact": "105/17",
          "allowance_value": 6.176470588235294,
          "allowance_value_exact": "105/17"
        },
        {
          "id": "nonmyopic:test-/wait-",
          "t": 2,
          "history": [
            {
              "action": "test",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": true,
          "allowance_optimal_reachable": true,
          "survey_count": 1,
          "original_policy_node": "nonmyopic:original:t2:p1_17:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "nonmyopic:allowance:t2:p1_17:bunlimited",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.058823529411764705,
          "posterior_exact": "1/17",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": null,
          "remaining_allowance_exact": null,
          "path_likelihood_given_acquisition_choices": 0.34,
          "path_likelihood_given_acquisition_choices_exact": "17/50",
          "original_value": 6.176470588235294,
          "original_value_exact": "105/17",
          "allowance_value": 6.176470588235294,
          "allowance_value_exact": "105/17"
        },
        {
          "id": "nonmyopic:wait+",
          "t": 1,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "nonmyopic:original:t1:p1_5:bunlimited",
          "original_optimal_actions": [
            "limited",
            "wait",
            "test"
          ],
          "allowance_policy_node": "nonmyopic:allowance:t1:p1_5:bunlimited",
          "allowance_optimal_actions": [
            "limited",
            "wait",
            "test"
          ],
          "posterior": 0.2,
          "posterior_exact": "1/5",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": null,
          "remaining_allowance_exact": null,
          "path_likelihood_given_acquisition_choices": 0.5,
          "path_likelihood_given_acquisition_choices_exact": "1/2",
          "original_value": 9.0,
          "original_value_exact": "9",
          "allowance_value": 9.0,
          "allowance_value_exact": "9"
        },
        {
          "id": "nonmyopic:wait+/test+",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "nonmyopic:original:t2:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "nonmyopic:allowance:t2:p1_2:bunlimited",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": null,
          "remaining_allowance_exact": null,
          "path_likelihood_given_acquisition_choices": 0.16,
          "path_likelihood_given_acquisition_choices_exact": "4/25",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "nonmyopic:wait+/test-",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "nonmyopic:original:t2:p1_17:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "nonmyopic:allowance:t2:p1_17:bunlimited",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.058823529411764705,
          "posterior_exact": "1/17",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": null,
          "remaining_allowance_exact": null,
          "path_likelihood_given_acquisition_choices": 0.34,
          "path_likelihood_given_acquisition_choices_exact": "17/50",
          "original_value": 6.176470588235294,
          "original_value_exact": "105/17",
          "allowance_value": 6.176470588235294,
          "allowance_value_exact": "105/17"
        },
        {
          "id": "nonmyopic:wait+/wait+",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "nonmyopic:original:t2:p1_5:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "nonmyopic:allowance:t2:p1_5:bunlimited",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.2,
          "posterior_exact": "1/5",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": null,
          "remaining_allowance_exact": null,
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 9.0,
          "original_value_exact": "9",
          "allowance_value": 9.0,
          "allowance_value_exact": "9"
        },
        {
          "id": "nonmyopic:wait+/wait-",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "+",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "nonmyopic:original:t2:p1_5:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "nonmyopic:allowance:t2:p1_5:bunlimited",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.2,
          "posterior_exact": "1/5",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": null,
          "remaining_allowance_exact": null,
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 9.0,
          "original_value_exact": "9",
          "allowance_value": 9.0,
          "allowance_value_exact": "9"
        },
        {
          "id": "nonmyopic:wait-",
          "t": 1,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "nonmyopic:original:t1:p1_5:bunlimited",
          "original_optimal_actions": [
            "limited",
            "wait",
            "test"
          ],
          "allowance_policy_node": "nonmyopic:allowance:t1:p1_5:bunlimited",
          "allowance_optimal_actions": [
            "limited",
            "wait",
            "test"
          ],
          "posterior": 0.2,
          "posterior_exact": "1/5",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": null,
          "remaining_allowance_exact": null,
          "path_likelihood_given_acquisition_choices": 0.5,
          "path_likelihood_given_acquisition_choices_exact": "1/2",
          "original_value": 9.0,
          "original_value_exact": "9",
          "allowance_value": 9.0,
          "allowance_value_exact": "9"
        },
        {
          "id": "nonmyopic:wait-/test+",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "nonmyopic:original:t2:p1_2:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "nonmyopic:allowance:t2:p1_2:bunlimited",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": null,
          "remaining_allowance_exact": null,
          "path_likelihood_given_acquisition_choices": 0.16,
          "path_likelihood_given_acquisition_choices_exact": "4/25",
          "original_value": 15.0,
          "original_value_exact": "15",
          "allowance_value": 15.0,
          "allowance_value_exact": "15"
        },
        {
          "id": "nonmyopic:wait-/test-",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "test",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 1,
          "original_policy_node": "nonmyopic:original:t2:p1_17:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "nonmyopic:allowance:t2:p1_17:bunlimited",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.058823529411764705,
          "posterior_exact": "1/17",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": null,
          "remaining_allowance_exact": null,
          "path_likelihood_given_acquisition_choices": 0.34,
          "path_likelihood_given_acquisition_choices_exact": "17/50",
          "original_value": 6.176470588235294,
          "original_value_exact": "105/17",
          "allowance_value": 6.176470588235294,
          "allowance_value_exact": "105/17"
        },
        {
          "id": "nonmyopic:wait-/wait+",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "+",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "nonmyopic:original:t2:p1_5:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "nonmyopic:allowance:t2:p1_5:bunlimited",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.2,
          "posterior_exact": "1/5",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": null,
          "remaining_allowance_exact": null,
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 9.0,
          "original_value_exact": "9",
          "allowance_value": 9.0,
          "allowance_value_exact": "9"
        },
        {
          "id": "nonmyopic:wait-/wait-",
          "t": 2,
          "history": [
            {
              "action": "wait",
              "sign": "-",
              "arrival": 1
            },
            {
              "action": "wait",
              "sign": "-",
              "arrival": 2
            }
          ],
          "allowance_feasible": true,
          "original_optimal_reachable": false,
          "allowance_optimal_reachable": false,
          "survey_count": 0,
          "original_policy_node": "nonmyopic:original:t2:p1_5:bunlimited",
          "original_optimal_actions": [
            "limited"
          ],
          "allowance_policy_node": "nonmyopic:allowance:t2:p1_5:bunlimited",
          "allowance_optimal_actions": [
            "limited"
          ],
          "posterior": 0.2,
          "posterior_exact": "1/5",
          "survey_spent": 0.0,
          "survey_spent_exact": "0",
          "waiting_spent": 0.0,
          "waiting_spent_exact": "0",
          "total_spent": 0.0,
          "total_spent_exact": "0",
          "remaining_allowance": null,
          "remaining_allowance_exact": null,
          "path_likelihood_given_acquisition_choices": 0.25,
          "path_likelihood_given_acquisition_choices_exact": "1/4",
          "original_value": 9.0,
          "original_value_exact": "9",
          "allowance_value": 9.0,
          "allowance_value_exact": "9"
        }
      ],
      "groups": [
        {
          "id": "nonmyopic:t0:p1_5",
          "preset_id": "nonmyopic",
          "t": 0,
          "history_ids": [
            "nonmyopic:root"
          ],
          "history_count": 1,
          "distinct_allowances": 1,
          "common_policy_node": "nonmyopic:allowance:t0:p1_5:bunlimited",
          "common_optimal_actions": [
            "test"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "nonmyopic:root",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [
            "nonmyopic:root"
          ],
          "allowance_optimal_reachable_history_ids": [
            "nonmyopic:root"
          ],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": false,
          "posterior": 0.2,
          "posterior_exact": "1/5",
          "minimum_remaining_allowance": null,
          "minimum_remaining_allowance_exact": null,
          "common_value": 12.04,
          "common_value_exact": "301/25",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": "nonmyopic:allowance:t0:p1_5:bunlimited",
          "original_optimal_only_max_regret": 0.0,
          "original_optimal_only_max_regret_exact": "0"
        },
        {
          "id": "nonmyopic:t1:p1_17",
          "preset_id": "nonmyopic",
          "t": 1,
          "history_ids": [
            "nonmyopic:test-"
          ],
          "history_count": 1,
          "distinct_allowances": 1,
          "common_policy_node": "nonmyopic:allowance:t1:p1_17:bunlimited",
          "common_optimal_actions": [
            "limited",
            "wait",
            "test"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "nonmyopic:test-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [
            "nonmyopic:test-"
          ],
          "allowance_optimal_reachable_history_ids": [
            "nonmyopic:test-"
          ],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": false,
          "posterior": 0.058823529411764705,
          "posterior_exact": "1/17",
          "minimum_remaining_allowance": null,
          "minimum_remaining_allowance_exact": null,
          "common_value": 6.176470588235294,
          "common_value_exact": "105/17",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": "nonmyopic:allowance:t1:p1_17:bunlimited",
          "original_optimal_only_max_regret": 0.0,
          "original_optimal_only_max_regret_exact": "0"
        },
        {
          "id": "nonmyopic:t1:p1_5",
          "preset_id": "nonmyopic",
          "t": 1,
          "history_ids": [
            "nonmyopic:wait+",
            "nonmyopic:wait-"
          ],
          "history_count": 2,
          "distinct_allowances": 1,
          "common_policy_node": "nonmyopic:allowance:t1:p1_5:bunlimited",
          "common_optimal_actions": [
            "limited",
            "wait",
            "test"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "nonmyopic:wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "nonmyopic:wait-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.2,
          "posterior_exact": "1/5",
          "minimum_remaining_allowance": null,
          "minimum_remaining_allowance_exact": null,
          "common_value": 9.0,
          "common_value_exact": "9",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        },
        {
          "id": "nonmyopic:t1:p1_2",
          "preset_id": "nonmyopic",
          "t": 1,
          "history_ids": [
            "nonmyopic:test+"
          ],
          "history_count": 1,
          "distinct_allowances": 1,
          "common_policy_node": "nonmyopic:allowance:t1:p1_2:bunlimited",
          "common_optimal_actions": [
            "test"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "nonmyopic:test+",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [
            "nonmyopic:test+"
          ],
          "allowance_optimal_reachable_history_ids": [
            "nonmyopic:test+"
          ],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": false,
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "minimum_remaining_allowance": null,
          "minimum_remaining_allowance_exact": null,
          "common_value": 24.5,
          "common_value_exact": "49/2",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": "nonmyopic:allowance:t1:p1_2:bunlimited",
          "original_optimal_only_max_regret": 0.0,
          "original_optimal_only_max_regret_exact": "0"
        },
        {
          "id": "nonmyopic:t2:p1_65",
          "preset_id": "nonmyopic",
          "t": 2,
          "history_ids": [
            "nonmyopic:test-/test-"
          ],
          "history_count": 1,
          "distinct_allowances": 1,
          "common_policy_node": "nonmyopic:allowance:t2:p1_65:bunlimited",
          "common_optimal_actions": [
            "limited"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "nonmyopic:test-/test-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [
            "nonmyopic:test-/test-"
          ],
          "allowance_optimal_reachable_history_ids": [
            "nonmyopic:test-/test-"
          ],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": false,
          "posterior": 0.015384615384615385,
          "posterior_exact": "1/65",
          "minimum_remaining_allowance": null,
          "minimum_remaining_allowance_exact": null,
          "common_value": 5.3076923076923075,
          "common_value_exact": "69/13",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": "nonmyopic:allowance:t2:p1_65:bunlimited",
          "original_optimal_only_max_regret": 0.0,
          "original_optimal_only_max_regret_exact": "0"
        },
        {
          "id": "nonmyopic:t2:p1_17",
          "preset_id": "nonmyopic",
          "t": 2,
          "history_ids": [
            "nonmyopic:test-/wait+",
            "nonmyopic:test-/wait-",
            "nonmyopic:wait+/test-",
            "nonmyopic:wait-/test-"
          ],
          "history_count": 4,
          "distinct_allowances": 1,
          "common_policy_node": "nonmyopic:allowance:t2:p1_17:bunlimited",
          "common_optimal_actions": [
            "limited"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "nonmyopic:test-/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "nonmyopic:test-/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "nonmyopic:wait+/test-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "nonmyopic:wait-/test-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [
            "nonmyopic:test-/wait+",
            "nonmyopic:test-/wait-"
          ],
          "allowance_optimal_reachable_history_ids": [
            "nonmyopic:test-/wait+",
            "nonmyopic:test-/wait-"
          ],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.058823529411764705,
          "posterior_exact": "1/17",
          "minimum_remaining_allowance": null,
          "minimum_remaining_allowance_exact": null,
          "common_value": 6.176470588235294,
          "common_value_exact": "105/17",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": "nonmyopic:allowance:t2:p1_17:bunlimited",
          "original_optimal_only_max_regret": 0.0,
          "original_optimal_only_max_regret_exact": "0"
        },
        {
          "id": "nonmyopic:t2:p1_5",
          "preset_id": "nonmyopic",
          "t": 2,
          "history_ids": [
            "nonmyopic:test+/test-",
            "nonmyopic:test-/test+",
            "nonmyopic:wait+/wait+",
            "nonmyopic:wait+/wait-",
            "nonmyopic:wait-/wait+",
            "nonmyopic:wait-/wait-"
          ],
          "history_count": 6,
          "distinct_allowances": 1,
          "common_policy_node": "nonmyopic:allowance:t2:p1_5:bunlimited",
          "common_optimal_actions": [
            "limited"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "nonmyopic:test+/test-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "nonmyopic:test-/test+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "nonmyopic:wait+/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "nonmyopic:wait+/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "nonmyopic:wait-/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "nonmyopic:wait-/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [
            "nonmyopic:test+/test-",
            "nonmyopic:test-/test+"
          ],
          "allowance_optimal_reachable_history_ids": [
            "nonmyopic:test+/test-",
            "nonmyopic:test-/test+"
          ],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.2,
          "posterior_exact": "1/5",
          "minimum_remaining_allowance": null,
          "minimum_remaining_allowance_exact": null,
          "common_value": 9.0,
          "common_value_exact": "9",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": "nonmyopic:allowance:t2:p1_5:bunlimited",
          "original_optimal_only_max_regret": 0.0,
          "original_optimal_only_max_regret_exact": "0"
        },
        {
          "id": "nonmyopic:t2:p1_2",
          "preset_id": "nonmyopic",
          "t": 2,
          "history_ids": [
            "nonmyopic:test+/wait+",
            "nonmyopic:test+/wait-",
            "nonmyopic:wait+/test+",
            "nonmyopic:wait-/test+"
          ],
          "history_count": 4,
          "distinct_allowances": 1,
          "common_policy_node": "nonmyopic:allowance:t2:p1_2:bunlimited",
          "common_optimal_actions": [
            "limited"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "nonmyopic:test+/wait+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "nonmyopic:test+/wait-",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "nonmyopic:wait+/test+",
              "regret": 0.0,
              "regret_exact": "0"
            },
            {
              "history_id": "nonmyopic:wait-/test+",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [],
          "allowance_optimal_reachable_history_ids": [],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": true,
          "posterior": 0.5,
          "posterior_exact": "1/2",
          "minimum_remaining_allowance": null,
          "minimum_remaining_allowance_exact": null,
          "common_value": 15.0,
          "common_value_exact": "15",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": null,
          "original_optimal_only_max_regret": null,
          "original_optimal_only_max_regret_exact": null
        },
        {
          "id": "nonmyopic:t2:p4_5",
          "preset_id": "nonmyopic",
          "t": 2,
          "history_ids": [
            "nonmyopic:test+/test+"
          ],
          "history_count": 1,
          "distinct_allowances": 1,
          "common_policy_node": "nonmyopic:allowance:t2:p4_5:bunlimited",
          "common_optimal_actions": [
            "full"
          ],
          "zero_regret_common_policy_exists": true,
          "members": [
            {
              "history_id": "nonmyopic:test+/test+",
              "regret": 0.0,
              "regret_exact": "0"
            }
          ],
          "original_optimal_reachable_history_ids": [
            "nonmyopic:test+/test+"
          ],
          "allowance_optimal_reachable_history_ids": [
            "nonmyopic:test+/test+"
          ],
          "survey_spending_ambiguous": false,
          "ordered_evidence_ambiguous": false,
          "posterior": 0.8,
          "posterior_exact": "4/5",
          "minimum_remaining_allowance": null,
          "minimum_remaining_allowance_exact": null,
          "common_value": 40.0,
          "common_value_exact": "40",
          "max_regret": 0.0,
          "max_regret_exact": "0",
          "max_regret_on_original_optimal_reachable_members": 0.0,
          "max_regret_on_original_optimal_reachable_members_exact": "0",
          "original_optimal_only_common_policy_node": "nonmyopic:allowance:t2:p4_5:bunlimited",
          "original_optimal_only_max_regret": 0.0,
          "original_optimal_only_max_regret_exact": "0"
        }
      ],
      "initial_allowance": null,
      "initial_allowance_exact": null,
      "original_root_value": 12.04,
      "original_root_value_exact": "301/25",
      "allowance_root_value": 12.04,
      "allowance_root_value_exact": "301/25",
      "max_regret": 0.0,
      "max_regret_exact": "0"
    }
  ],
  "collision_inventory": [
    {
      "id": "timely:t2:p1_2",
      "preset_id": "timely",
      "t": 2,
      "history_ids": [
        "timely:test+/test-",
        "timely:test-/test+",
        "timely:wait+/wait+",
        "timely:wait+/wait-",
        "timely:wait-/wait+",
        "timely:wait-/wait-"
      ],
      "history_count": 6,
      "distinct_allowances": 2,
      "common_policy_node": "timely:allowance:t2:p1_2:b0",
      "common_optimal_actions": [
        "limited"
      ],
      "zero_regret_common_policy_exists": true,
      "members": [
        {
          "history_id": "timely:test+/test-",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "timely:test-/test+",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "timely:wait+/wait+",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "timely:wait+/wait-",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "timely:wait-/wait+",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "timely:wait-/wait-",
          "regret": 0.0,
          "regret_exact": "0"
        }
      ],
      "original_optimal_reachable_history_ids": [],
      "allowance_optimal_reachable_history_ids": [],
      "survey_spending_ambiguous": true,
      "ordered_evidence_ambiguous": true,
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "minimum_remaining_allowance": 0.0,
      "minimum_remaining_allowance_exact": "0",
      "common_value": 15.0,
      "common_value_exact": "15",
      "max_regret": 0.0,
      "max_regret_exact": "0",
      "max_regret_on_original_optimal_reachable_members": 0.0,
      "max_regret_on_original_optimal_reachable_members_exact": "0",
      "original_optimal_only_common_policy_node": null,
      "original_optimal_only_max_regret": null,
      "original_optimal_only_max_regret_exact": null
    },
    {
      "id": "unchanged:t2:p19_20",
      "preset_id": "unchanged",
      "t": 2,
      "history_ids": [
        "unchanged:test+/test-",
        "unchanged:test-/test+",
        "unchanged:wait+/wait+",
        "unchanged:wait+/wait-",
        "unchanged:wait-/wait+",
        "unchanged:wait-/wait-"
      ],
      "history_count": 6,
      "distinct_allowances": 2,
      "common_policy_node": "unchanged:allowance:t2:p19_20:b0",
      "common_optimal_actions": [
        "full"
      ],
      "zero_regret_common_policy_exists": true,
      "members": [
        {
          "history_id": "unchanged:test+/test-",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "unchanged:test-/test+",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "unchanged:wait+/wait+",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "unchanged:wait+/wait-",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "unchanged:wait-/wait+",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "unchanged:wait-/wait-",
          "regret": 0.0,
          "regret_exact": "0"
        }
      ],
      "original_optimal_reachable_history_ids": [],
      "allowance_optimal_reachable_history_ids": [],
      "survey_spending_ambiguous": true,
      "ordered_evidence_ambiguous": true,
      "posterior": 0.95,
      "posterior_exact": "19/20",
      "minimum_remaining_allowance": 0.0,
      "minimum_remaining_allowance_exact": "0",
      "common_value": 55.0,
      "common_value_exact": "55",
      "max_regret": 0.0,
      "max_regret_exact": "0",
      "max_regret_on_original_optimal_reachable_members": 0.0,
      "max_regret_on_original_optimal_reachable_members_exact": "0",
      "original_optimal_only_common_policy_node": null,
      "original_optimal_only_max_regret": null,
      "original_optimal_only_max_regret_exact": null
    },
    {
      "id": "routine:t1:p1_5",
      "preset_id": "routine",
      "t": 1,
      "history_ids": [
        "routine:test-",
        "routine:wait-"
      ],
      "history_count": 2,
      "distinct_allowances": 2,
      "common_policy_node": "routine:allowance:t1:p1_5:b4",
      "common_optimal_actions": [
        "limited"
      ],
      "zero_regret_common_policy_exists": true,
      "members": [
        {
          "history_id": "routine:test-",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "routine:wait-",
          "regret": 0.0,
          "regret_exact": "0"
        }
      ],
      "original_optimal_reachable_history_ids": [
        "routine:wait-"
      ],
      "allowance_optimal_reachable_history_ids": [
        "routine:wait-"
      ],
      "survey_spending_ambiguous": true,
      "ordered_evidence_ambiguous": true,
      "posterior": 0.2,
      "posterior_exact": "1/5",
      "minimum_remaining_allowance": 4.0,
      "minimum_remaining_allowance_exact": "4",
      "common_value": 9.0,
      "common_value_exact": "9",
      "max_regret": 0.0,
      "max_regret_exact": "0",
      "max_regret_on_original_optimal_reachable_members": 0.0,
      "max_regret_on_original_optimal_reachable_members_exact": "0",
      "original_optimal_only_common_policy_node": "routine:allowance:t1:p1_5:b8",
      "original_optimal_only_max_regret": 0.0,
      "original_optimal_only_max_regret_exact": "0"
    },
    {
      "id": "routine:t1:p4_5",
      "preset_id": "routine",
      "t": 1,
      "history_ids": [
        "routine:test+",
        "routine:wait+"
      ],
      "history_count": 2,
      "distinct_allowances": 2,
      "common_policy_node": "routine:allowance:t1:p4_5:b4",
      "common_optimal_actions": [
        "full"
      ],
      "zero_regret_common_policy_exists": true,
      "members": [
        {
          "history_id": "routine:test+",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "routine:wait+",
          "regret": 0.0,
          "regret_exact": "0"
        }
      ],
      "original_optimal_reachable_history_ids": [
        "routine:wait+"
      ],
      "allowance_optimal_reachable_history_ids": [
        "routine:wait+"
      ],
      "survey_spending_ambiguous": true,
      "ordered_evidence_ambiguous": true,
      "posterior": 0.8,
      "posterior_exact": "4/5",
      "minimum_remaining_allowance": 4.0,
      "minimum_remaining_allowance_exact": "4",
      "common_value": 40.0,
      "common_value_exact": "40",
      "max_regret": 0.0,
      "max_regret_exact": "0",
      "max_regret_on_original_optimal_reachable_members": 0.0,
      "max_regret_on_original_optimal_reachable_members_exact": "0",
      "original_optimal_only_common_policy_node": "routine:allowance:t1:p4_5:b8",
      "original_optimal_only_max_regret": 0.0,
      "original_optimal_only_max_regret_exact": "0"
    },
    {
      "id": "routine:t2:p1_17",
      "preset_id": "routine",
      "t": 2,
      "history_ids": [
        "routine:test-/test-",
        "routine:test-/wait-",
        "routine:wait-/test-",
        "routine:wait-/wait-"
      ],
      "history_count": 4,
      "distinct_allowances": 3,
      "common_policy_node": "routine:allowance:t2:p1_17:b0",
      "common_optimal_actions": [
        "limited"
      ],
      "zero_regret_common_policy_exists": true,
      "members": [
        {
          "history_id": "routine:test-/test-",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "routine:test-/wait-",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "routine:wait-/test-",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "routine:wait-/wait-",
          "regret": 0.0,
          "regret_exact": "0"
        }
      ],
      "original_optimal_reachable_history_ids": [],
      "allowance_optimal_reachable_history_ids": [],
      "survey_spending_ambiguous": true,
      "ordered_evidence_ambiguous": true,
      "posterior": 0.058823529411764705,
      "posterior_exact": "1/17",
      "minimum_remaining_allowance": 0.0,
      "minimum_remaining_allowance_exact": "0",
      "common_value": 6.176470588235294,
      "common_value_exact": "105/17",
      "max_regret": 0.0,
      "max_regret_exact": "0",
      "max_regret_on_original_optimal_reachable_members": 0.0,
      "max_regret_on_original_optimal_reachable_members_exact": "0",
      "original_optimal_only_common_policy_node": null,
      "original_optimal_only_max_regret": null,
      "original_optimal_only_max_regret_exact": null
    },
    {
      "id": "routine:t2:p1_2",
      "preset_id": "routine",
      "t": 2,
      "history_ids": [
        "routine:test+/test-",
        "routine:test+/wait-",
        "routine:test-/test+",
        "routine:test-/wait+",
        "routine:wait+/test-",
        "routine:wait+/wait-",
        "routine:wait-/test+",
        "routine:wait-/wait+"
      ],
      "history_count": 8,
      "distinct_allowances": 3,
      "common_policy_node": "routine:allowance:t2:p1_2:b0",
      "common_optimal_actions": [
        "limited"
      ],
      "zero_regret_common_policy_exists": true,
      "members": [
        {
          "history_id": "routine:test+/test-",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "routine:test+/wait-",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "routine:test-/test+",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "routine:test-/wait+",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "routine:wait+/test-",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "routine:wait+/wait-",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "routine:wait-/test+",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "routine:wait-/wait+",
          "regret": 0.0,
          "regret_exact": "0"
        }
      ],
      "original_optimal_reachable_history_ids": [],
      "allowance_optimal_reachable_history_ids": [],
      "survey_spending_ambiguous": true,
      "ordered_evidence_ambiguous": true,
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "minimum_remaining_allowance": 0.0,
      "minimum_remaining_allowance_exact": "0",
      "common_value": 15.0,
      "common_value_exact": "15",
      "max_regret": 0.0,
      "max_regret_exact": "0",
      "max_regret_on_original_optimal_reachable_members": 0.0,
      "max_regret_on_original_optimal_reachable_members_exact": "0",
      "original_optimal_only_common_policy_node": null,
      "original_optimal_only_max_regret": null,
      "original_optimal_only_max_regret_exact": null
    },
    {
      "id": "routine:t2:p16_17",
      "preset_id": "routine",
      "t": 2,
      "history_ids": [
        "routine:test+/test+",
        "routine:test+/wait+",
        "routine:wait+/test+",
        "routine:wait+/wait+"
      ],
      "history_count": 4,
      "distinct_allowances": 3,
      "common_policy_node": "routine:allowance:t2:p16_17:b0",
      "common_optimal_actions": [
        "full"
      ],
      "zero_regret_common_policy_exists": true,
      "members": [
        {
          "history_id": "routine:test+/test+",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "routine:test+/wait+",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "routine:wait+/test+",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "routine:wait+/wait+",
          "regret": 0.0,
          "regret_exact": "0"
        }
      ],
      "original_optimal_reachable_history_ids": [],
      "allowance_optimal_reachable_history_ids": [],
      "survey_spending_ambiguous": true,
      "ordered_evidence_ambiguous": true,
      "posterior": 0.9411764705882353,
      "posterior_exact": "16/17",
      "minimum_remaining_allowance": 0.0,
      "minimum_remaining_allowance_exact": "0",
      "common_value": 54.11764705882353,
      "common_value_exact": "920/17",
      "max_regret": 0.0,
      "max_regret_exact": "0",
      "max_regret_on_original_optimal_reachable_members": 0.0,
      "max_regret_on_original_optimal_reachable_members_exact": "0",
      "original_optimal_only_common_policy_node": null,
      "original_optimal_only_max_regret": null,
      "original_optimal_only_max_regret_exact": null
    },
    {
      "id": "sequential:t2:p1_2",
      "preset_id": "sequential",
      "t": 2,
      "history_ids": [
        "sequential:test+/test-",
        "sequential:test-/test+",
        "sequential:wait+/wait+",
        "sequential:wait+/wait-",
        "sequential:wait-/wait+",
        "sequential:wait-/wait-"
      ],
      "history_count": 6,
      "distinct_allowances": 2,
      "common_policy_node": "sequential:allowance:t2:p1_2:b0",
      "common_optimal_actions": [
        "limited"
      ],
      "zero_regret_common_policy_exists": false,
      "members": [
        {
          "history_id": "sequential:test+/test-",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "sequential:test-/test+",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "sequential:wait+/wait+",
          "regret": 4.5,
          "regret_exact": "9/2"
        },
        {
          "history_id": "sequential:wait+/wait-",
          "regret": 4.5,
          "regret_exact": "9/2"
        },
        {
          "history_id": "sequential:wait-/wait+",
          "regret": 4.5,
          "regret_exact": "9/2"
        },
        {
          "history_id": "sequential:wait-/wait-",
          "regret": 4.5,
          "regret_exact": "9/2"
        }
      ],
      "original_optimal_reachable_history_ids": [
        "sequential:test+/test-",
        "sequential:test-/test+"
      ],
      "allowance_optimal_reachable_history_ids": [
        "sequential:test+/test-"
      ],
      "survey_spending_ambiguous": true,
      "ordered_evidence_ambiguous": true,
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "minimum_remaining_allowance": 0.0,
      "minimum_remaining_allowance_exact": "0",
      "common_value": 15.0,
      "common_value_exact": "15",
      "max_regret": 4.5,
      "max_regret_exact": "9/2",
      "max_regret_on_original_optimal_reachable_members": 0.0,
      "max_regret_on_original_optimal_reachable_members_exact": "0",
      "original_optimal_only_common_policy_node": "sequential:allowance:t2:p1_2:b0",
      "original_optimal_only_max_regret": 0.0,
      "original_optimal_only_max_regret_exact": "0"
    },
    {
      "id": "sequential:t3:p1_2",
      "preset_id": "sequential",
      "t": 3,
      "history_ids": [
        "sequential:test+/test-/wait+",
        "sequential:test+/test-/wait-",
        "sequential:test+/wait+/test-",
        "sequential:test+/wait-/test-",
        "sequential:test-/test+/wait+",
        "sequential:test-/test+/wait-",
        "sequential:test-/wait+/test+",
        "sequential:test-/wait-/test+",
        "sequential:wait+/test+/test-",
        "sequential:wait+/test-/test+",
        "sequential:wait+/wait+/wait+",
        "sequential:wait+/wait+/wait-",
        "sequential:wait+/wait-/wait+",
        "sequential:wait+/wait-/wait-",
        "sequential:wait-/test+/test-",
        "sequential:wait-/test-/test+",
        "sequential:wait-/wait+/wait+",
        "sequential:wait-/wait+/wait-",
        "sequential:wait-/wait-/wait+",
        "sequential:wait-/wait-/wait-"
      ],
      "history_count": 20,
      "distinct_allowances": 2,
      "common_policy_node": "sequential:allowance:t3:p1_2:b0",
      "common_optimal_actions": [
        "limited"
      ],
      "zero_regret_common_policy_exists": true,
      "members": [
        {
          "history_id": "sequential:test+/test-/wait+",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "sequential:test+/test-/wait-",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "sequential:test+/wait+/test-",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "sequential:test+/wait-/test-",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "sequential:test-/test+/wait+",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "sequential:test-/test+/wait-",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "sequential:test-/wait+/test+",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "sequential:test-/wait-/test+",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "sequential:wait+/test+/test-",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "sequential:wait+/test-/test+",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "sequential:wait+/wait+/wait+",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "sequential:wait+/wait+/wait-",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "sequential:wait+/wait-/wait+",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "sequential:wait+/wait-/wait-",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "sequential:wait-/test+/test-",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "sequential:wait-/test-/test+",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "sequential:wait-/wait+/wait+",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "sequential:wait-/wait+/wait-",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "sequential:wait-/wait-/wait+",
          "regret": 0.0,
          "regret_exact": "0"
        },
        {
          "history_id": "sequential:wait-/wait-/wait-",
          "regret": 0.0,
          "regret_exact": "0"
        }
      ],
      "original_optimal_reachable_history_ids": [],
      "allowance_optimal_reachable_history_ids": [],
      "survey_spending_ambiguous": true,
      "ordered_evidence_ambiguous": true,
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "minimum_remaining_allowance": 0.0,
      "minimum_remaining_allowance_exact": "0",
      "common_value": 15.0,
      "common_value_exact": "15",
      "max_regret": 0.0,
      "max_regret_exact": "0",
      "max_regret_on_original_optimal_reachable_members": 0.0,
      "max_regret_on_original_optimal_reachable_members_exact": "0",
      "original_optimal_only_common_policy_node": null,
      "original_optimal_only_max_regret": null,
      "original_optimal_only_max_regret_exact": null
    }
  ],
  "witness": {
    "group_id": "sequential:t2:p1_2",
    "preset_id": "sequential",
    "minimum_allowance_history": "sequential:test+/test-",
    "greatest_regret_history": "sequential:wait+/wait+",
    "common_policy_node": "sequential:allowance:t2:p1_2:b0",
    "max_regret": 4.5,
    "max_regret_exact": "9/2",
    "both_histories_original_optimal_reachable": false
  },
  "policy_nodes": [
    {
      "id": "late:allowance:t0:p1_2:b8",
      "preset_id": "late",
      "contract": "allowance",
      "t": 0,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "late:allowance:t1:p1_2:b8",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "late:allowance:t1:p1_2:b8",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 12.0,
          "value_exact": "12",
          "expense": 3.0,
          "expense_exact": "3"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": 8.0,
      "remaining_allowance_exact": "8",
      "value": 15.0,
      "value_exact": "15"
    },
    {
      "id": "late:allowance:t1:p1_2:b8",
      "preset_id": "late",
      "contract": "allowance",
      "t": 1,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": 8.0,
      "remaining_allowance_exact": "8",
      "value": 15.0,
      "value_exact": "15"
    },
    {
      "id": "late:original:t0:p1_2:bunlimited",
      "preset_id": "late",
      "contract": "original",
      "t": 0,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "late:original:t1:p1_2:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "late:original:t1:p1_2:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 12.0,
          "value_exact": "12",
          "expense": 3.0,
          "expense_exact": "3"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 15.0,
      "value_exact": "15"
    },
    {
      "id": "late:original:t1:p1_2:bunlimited",
      "preset_id": "late",
      "contract": "original",
      "t": 1,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 15.0,
      "value_exact": "15"
    },
    {
      "id": "nonmyopic:allowance:t0:p1_5:bunlimited",
      "preset_id": "nonmyopic",
      "contract": "allowance",
      "t": 0,
      "optimal_actions": [
        "test"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 9.0,
          "value_exact": "9",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -20.0,
          "value_exact": "-20",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "nonmyopic:allowance:t1:p1_5:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.2,
              "posterior_exact": "1/5"
            },
            {
              "sign": "-",
              "child": "nonmyopic:allowance:t1:p1_5:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.2,
              "posterior_exact": "1/5"
            }
          ],
          "value": 9.0,
          "value_exact": "9",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "nonmyopic:allowance:t1:p1_2:bunlimited",
              "probability": 0.32,
              "probability_exact": "8/25",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "nonmyopic:allowance:t1:p1_17:bunlimited",
              "probability": 0.68,
              "probability_exact": "17/25",
              "posterior": 0.058823529411764705,
              "posterior_exact": "1/17"
            }
          ],
          "value": 12.04,
          "value_exact": "301/25",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.2,
      "posterior_exact": "1/5",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 12.04,
      "value_exact": "301/25"
    },
    {
      "id": "nonmyopic:allowance:t1:p1_17:bunlimited",
      "preset_id": "nonmyopic",
      "contract": "allowance",
      "t": 1,
      "optimal_actions": [
        "limited",
        "wait",
        "test"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 6.176470588235294,
          "value_exact": "105/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -34.11764705882353,
          "value_exact": "-580/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "nonmyopic:allowance:t2:p1_17:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.058823529411764705,
              "posterior_exact": "1/17"
            },
            {
              "sign": "-",
              "child": "nonmyopic:allowance:t2:p1_17:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.058823529411764705,
              "posterior_exact": "1/17"
            }
          ],
          "value": 6.176470588235294,
          "value_exact": "105/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "nonmyopic:allowance:t2:p1_5:bunlimited",
              "probability": 0.23529411764705882,
              "probability_exact": "4/17",
              "posterior": 0.2,
              "posterior_exact": "1/5"
            },
            {
              "sign": "-",
              "child": "nonmyopic:allowance:t2:p1_65:bunlimited",
              "probability": 0.7647058823529411,
              "probability_exact": "13/17",
              "posterior": 0.015384615384615385,
              "posterior_exact": "1/65"
            }
          ],
          "value": 6.176470588235294,
          "value_exact": "105/17",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.058823529411764705,
      "posterior_exact": "1/17",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 6.176470588235294,
      "value_exact": "105/17"
    },
    {
      "id": "nonmyopic:allowance:t1:p1_2:bunlimited",
      "preset_id": "nonmyopic",
      "contract": "allowance",
      "t": 1,
      "optimal_actions": [
        "test"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "nonmyopic:allowance:t2:p1_2:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "nonmyopic:allowance:t2:p1_2:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "nonmyopic:allowance:t2:p4_5:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.8,
              "posterior_exact": "4/5"
            },
            {
              "sign": "-",
              "child": "nonmyopic:allowance:t2:p1_5:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.2,
              "posterior_exact": "1/5"
            }
          ],
          "value": 24.5,
          "value_exact": "49/2",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 24.5,
      "value_exact": "49/2"
    },
    {
      "id": "nonmyopic:allowance:t1:p1_5:bunlimited",
      "preset_id": "nonmyopic",
      "contract": "allowance",
      "t": 1,
      "optimal_actions": [
        "limited",
        "wait",
        "test"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 9.0,
          "value_exact": "9",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -20.0,
          "value_exact": "-20",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "nonmyopic:allowance:t2:p1_5:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.2,
              "posterior_exact": "1/5"
            },
            {
              "sign": "-",
              "child": "nonmyopic:allowance:t2:p1_5:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.2,
              "posterior_exact": "1/5"
            }
          ],
          "value": 9.0,
          "value_exact": "9",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "nonmyopic:allowance:t2:p1_2:bunlimited",
              "probability": 0.32,
              "probability_exact": "8/25",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "nonmyopic:allowance:t2:p1_17:bunlimited",
              "probability": 0.68,
              "probability_exact": "17/25",
              "posterior": 0.058823529411764705,
              "posterior_exact": "1/17"
            }
          ],
          "value": 9.0,
          "value_exact": "9",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.2,
      "posterior_exact": "1/5",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 9.0,
      "value_exact": "9"
    },
    {
      "id": "nonmyopic:allowance:t2:p1_17:bunlimited",
      "preset_id": "nonmyopic",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 6.176470588235294,
          "value_exact": "105/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -34.11764705882353,
          "value_exact": "-580/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.058823529411764705,
      "posterior_exact": "1/17",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 6.176470588235294,
      "value_exact": "105/17"
    },
    {
      "id": "nonmyopic:allowance:t2:p1_2:bunlimited",
      "preset_id": "nonmyopic",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 15.0,
      "value_exact": "15"
    },
    {
      "id": "nonmyopic:allowance:t2:p1_5:bunlimited",
      "preset_id": "nonmyopic",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 9.0,
          "value_exact": "9",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -20.0,
          "value_exact": "-20",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.2,
      "posterior_exact": "1/5",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 9.0,
      "value_exact": "9"
    },
    {
      "id": "nonmyopic:allowance:t2:p1_65:bunlimited",
      "preset_id": "nonmyopic",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 5.3076923076923075,
          "value_exact": "69/13",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -38.46153846153846,
          "value_exact": "-500/13",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.015384615384615385,
      "posterior_exact": "1/65",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 5.3076923076923075,
      "value_exact": "69/13"
    },
    {
      "id": "nonmyopic:allowance:t2:p4_5:bunlimited",
      "preset_id": "nonmyopic",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 21.0,
          "value_exact": "21",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 40.0,
          "value_exact": "40",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.8,
      "posterior_exact": "4/5",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 40.0,
      "value_exact": "40"
    },
    {
      "id": "nonmyopic:original:t0:p1_5:bunlimited",
      "preset_id": "nonmyopic",
      "contract": "original",
      "t": 0,
      "optimal_actions": [
        "test"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 9.0,
          "value_exact": "9",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -20.0,
          "value_exact": "-20",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "nonmyopic:original:t1:p1_5:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.2,
              "posterior_exact": "1/5"
            },
            {
              "sign": "-",
              "child": "nonmyopic:original:t1:p1_5:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.2,
              "posterior_exact": "1/5"
            }
          ],
          "value": 9.0,
          "value_exact": "9",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "nonmyopic:original:t1:p1_2:bunlimited",
              "probability": 0.32,
              "probability_exact": "8/25",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "nonmyopic:original:t1:p1_17:bunlimited",
              "probability": 0.68,
              "probability_exact": "17/25",
              "posterior": 0.058823529411764705,
              "posterior_exact": "1/17"
            }
          ],
          "value": 12.04,
          "value_exact": "301/25",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.2,
      "posterior_exact": "1/5",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 12.04,
      "value_exact": "301/25"
    },
    {
      "id": "nonmyopic:original:t1:p1_17:bunlimited",
      "preset_id": "nonmyopic",
      "contract": "original",
      "t": 1,
      "optimal_actions": [
        "limited",
        "wait",
        "test"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 6.176470588235294,
          "value_exact": "105/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -34.11764705882353,
          "value_exact": "-580/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "nonmyopic:original:t2:p1_17:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.058823529411764705,
              "posterior_exact": "1/17"
            },
            {
              "sign": "-",
              "child": "nonmyopic:original:t2:p1_17:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.058823529411764705,
              "posterior_exact": "1/17"
            }
          ],
          "value": 6.176470588235294,
          "value_exact": "105/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "nonmyopic:original:t2:p1_5:bunlimited",
              "probability": 0.23529411764705882,
              "probability_exact": "4/17",
              "posterior": 0.2,
              "posterior_exact": "1/5"
            },
            {
              "sign": "-",
              "child": "nonmyopic:original:t2:p1_65:bunlimited",
              "probability": 0.7647058823529411,
              "probability_exact": "13/17",
              "posterior": 0.015384615384615385,
              "posterior_exact": "1/65"
            }
          ],
          "value": 6.176470588235294,
          "value_exact": "105/17",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.058823529411764705,
      "posterior_exact": "1/17",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 6.176470588235294,
      "value_exact": "105/17"
    },
    {
      "id": "nonmyopic:original:t1:p1_2:bunlimited",
      "preset_id": "nonmyopic",
      "contract": "original",
      "t": 1,
      "optimal_actions": [
        "test"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "nonmyopic:original:t2:p1_2:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "nonmyopic:original:t2:p1_2:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "nonmyopic:original:t2:p4_5:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.8,
              "posterior_exact": "4/5"
            },
            {
              "sign": "-",
              "child": "nonmyopic:original:t2:p1_5:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.2,
              "posterior_exact": "1/5"
            }
          ],
          "value": 24.5,
          "value_exact": "49/2",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 24.5,
      "value_exact": "49/2"
    },
    {
      "id": "nonmyopic:original:t1:p1_5:bunlimited",
      "preset_id": "nonmyopic",
      "contract": "original",
      "t": 1,
      "optimal_actions": [
        "limited",
        "wait",
        "test"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 9.0,
          "value_exact": "9",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -20.0,
          "value_exact": "-20",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "nonmyopic:original:t2:p1_5:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.2,
              "posterior_exact": "1/5"
            },
            {
              "sign": "-",
              "child": "nonmyopic:original:t2:p1_5:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.2,
              "posterior_exact": "1/5"
            }
          ],
          "value": 9.0,
          "value_exact": "9",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "nonmyopic:original:t2:p1_2:bunlimited",
              "probability": 0.32,
              "probability_exact": "8/25",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "nonmyopic:original:t2:p1_17:bunlimited",
              "probability": 0.68,
              "probability_exact": "17/25",
              "posterior": 0.058823529411764705,
              "posterior_exact": "1/17"
            }
          ],
          "value": 9.0,
          "value_exact": "9",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.2,
      "posterior_exact": "1/5",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 9.0,
      "value_exact": "9"
    },
    {
      "id": "nonmyopic:original:t2:p1_17:bunlimited",
      "preset_id": "nonmyopic",
      "contract": "original",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 6.176470588235294,
          "value_exact": "105/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -34.11764705882353,
          "value_exact": "-580/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.058823529411764705,
      "posterior_exact": "1/17",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 6.176470588235294,
      "value_exact": "105/17"
    },
    {
      "id": "nonmyopic:original:t2:p1_2:bunlimited",
      "preset_id": "nonmyopic",
      "contract": "original",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 15.0,
      "value_exact": "15"
    },
    {
      "id": "nonmyopic:original:t2:p1_5:bunlimited",
      "preset_id": "nonmyopic",
      "contract": "original",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 9.0,
          "value_exact": "9",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -20.0,
          "value_exact": "-20",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.2,
      "posterior_exact": "1/5",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 9.0,
      "value_exact": "9"
    },
    {
      "id": "nonmyopic:original:t2:p1_65:bunlimited",
      "preset_id": "nonmyopic",
      "contract": "original",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 5.3076923076923075,
          "value_exact": "69/13",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -38.46153846153846,
          "value_exact": "-500/13",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.015384615384615385,
      "posterior_exact": "1/65",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 5.3076923076923075,
      "value_exact": "69/13"
    },
    {
      "id": "nonmyopic:original:t2:p4_5:bunlimited",
      "preset_id": "nonmyopic",
      "contract": "original",
      "t": 2,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 21.0,
          "value_exact": "21",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 40.0,
          "value_exact": "40",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.8,
      "posterior_exact": "4/5",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 40.0,
      "value_exact": "40"
    },
    {
      "id": "routine:allowance:t0:p1_2:b8",
      "preset_id": "routine",
      "contract": "allowance",
      "t": 0,
      "optimal_actions": [
        "wait"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "routine:allowance:t1:p4_5:b8",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.8,
              "posterior_exact": "4/5"
            },
            {
              "sign": "-",
              "child": "routine:allowance:t1:p1_5:b8",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.2,
              "posterior_exact": "1/5"
            }
          ],
          "value": 21.5,
          "value_exact": "43/2",
          "expense": 3.0,
          "expense_exact": "3"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "routine:allowance:t1:p4_5:b4",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.8,
              "posterior_exact": "4/5"
            },
            {
              "sign": "-",
              "child": "routine:allowance:t1:p1_5:b4",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.2,
              "posterior_exact": "1/5"
            }
          ],
          "value": 17.5,
          "value_exact": "35/2",
          "expense": 7.0,
          "expense_exact": "7"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": 8.0,
      "remaining_allowance_exact": "8",
      "value": 21.5,
      "value_exact": "43/2"
    },
    {
      "id": "routine:allowance:t1:p1_5:b4",
      "preset_id": "routine",
      "contract": "allowance",
      "t": 1,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 9.0,
          "value_exact": "9",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -20.0,
          "value_exact": "-20",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "routine:allowance:t2:p1_2:b4",
              "probability": 0.32,
              "probability_exact": "8/25",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "routine:allowance:t2:p1_17:b4",
              "probability": 0.68,
              "probability_exact": "17/25",
              "posterior": 0.058823529411764705,
              "posterior_exact": "1/17"
            }
          ],
          "value": 6.0,
          "value_exact": "6",
          "expense": 3.0,
          "expense_exact": "3"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "routine:allowance:t2:p1_2:b0",
              "probability": 0.32,
              "probability_exact": "8/25",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "routine:allowance:t2:p1_17:b0",
              "probability": 0.68,
              "probability_exact": "17/25",
              "posterior": 0.058823529411764705,
              "posterior_exact": "1/17"
            }
          ],
          "value": 2.0,
          "value_exact": "2",
          "expense": 7.0,
          "expense_exact": "7"
        }
      ],
      "posterior": 0.2,
      "posterior_exact": "1/5",
      "remaining_allowance": 4.0,
      "remaining_allowance_exact": "4",
      "value": 9.0,
      "value_exact": "9"
    },
    {
      "id": "routine:allowance:t1:p1_5:b8",
      "preset_id": "routine",
      "contract": "allowance",
      "t": 1,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 9.0,
          "value_exact": "9",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -20.0,
          "value_exact": "-20",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "routine:allowance:t2:p1_2:b8",
              "probability": 0.32,
              "probability_exact": "8/25",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "routine:allowance:t2:p1_17:b8",
              "probability": 0.68,
              "probability_exact": "17/25",
              "posterior": 0.058823529411764705,
              "posterior_exact": "1/17"
            }
          ],
          "value": 6.0,
          "value_exact": "6",
          "expense": 3.0,
          "expense_exact": "3"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "routine:allowance:t2:p1_2:b4",
              "probability": 0.32,
              "probability_exact": "8/25",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "routine:allowance:t2:p1_17:b4",
              "probability": 0.68,
              "probability_exact": "17/25",
              "posterior": 0.058823529411764705,
              "posterior_exact": "1/17"
            }
          ],
          "value": 2.0,
          "value_exact": "2",
          "expense": 7.0,
          "expense_exact": "7"
        }
      ],
      "posterior": 0.2,
      "posterior_exact": "1/5",
      "remaining_allowance": 8.0,
      "remaining_allowance_exact": "8",
      "value": 9.0,
      "value_exact": "9"
    },
    {
      "id": "routine:allowance:t1:p4_5:b4",
      "preset_id": "routine",
      "contract": "allowance",
      "t": 1,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 21.0,
          "value_exact": "21",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 40.0,
          "value_exact": "40",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "routine:allowance:t2:p16_17:b4",
              "probability": 0.68,
              "probability_exact": "17/25",
              "posterior": 0.9411764705882353,
              "posterior_exact": "16/17"
            },
            {
              "sign": "-",
              "child": "routine:allowance:t2:p1_2:b4",
              "probability": 0.32,
              "probability_exact": "8/25",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 38.6,
          "value_exact": "193/5",
          "expense": 3.0,
          "expense_exact": "3"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "routine:allowance:t2:p16_17:b0",
              "probability": 0.68,
              "probability_exact": "17/25",
              "posterior": 0.9411764705882353,
              "posterior_exact": "16/17"
            },
            {
              "sign": "-",
              "child": "routine:allowance:t2:p1_2:b0",
              "probability": 0.32,
              "probability_exact": "8/25",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 34.6,
          "value_exact": "173/5",
          "expense": 7.0,
          "expense_exact": "7"
        }
      ],
      "posterior": 0.8,
      "posterior_exact": "4/5",
      "remaining_allowance": 4.0,
      "remaining_allowance_exact": "4",
      "value": 40.0,
      "value_exact": "40"
    },
    {
      "id": "routine:allowance:t1:p4_5:b8",
      "preset_id": "routine",
      "contract": "allowance",
      "t": 1,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 21.0,
          "value_exact": "21",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 40.0,
          "value_exact": "40",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "routine:allowance:t2:p16_17:b8",
              "probability": 0.68,
              "probability_exact": "17/25",
              "posterior": 0.9411764705882353,
              "posterior_exact": "16/17"
            },
            {
              "sign": "-",
              "child": "routine:allowance:t2:p1_2:b8",
              "probability": 0.32,
              "probability_exact": "8/25",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 38.6,
          "value_exact": "193/5",
          "expense": 3.0,
          "expense_exact": "3"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "routine:allowance:t2:p16_17:b4",
              "probability": 0.68,
              "probability_exact": "17/25",
              "posterior": 0.9411764705882353,
              "posterior_exact": "16/17"
            },
            {
              "sign": "-",
              "child": "routine:allowance:t2:p1_2:b4",
              "probability": 0.32,
              "probability_exact": "8/25",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 34.6,
          "value_exact": "173/5",
          "expense": 7.0,
          "expense_exact": "7"
        }
      ],
      "posterior": 0.8,
      "posterior_exact": "4/5",
      "remaining_allowance": 8.0,
      "remaining_allowance_exact": "8",
      "value": 40.0,
      "value_exact": "40"
    },
    {
      "id": "routine:allowance:t2:p16_17:b0",
      "preset_id": "routine",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 23.823529411764707,
          "value_exact": "405/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 54.11764705882353,
          "value_exact": "920/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.9411764705882353,
      "posterior_exact": "16/17",
      "remaining_allowance": 0.0,
      "remaining_allowance_exact": "0",
      "value": 54.11764705882353,
      "value_exact": "920/17"
    },
    {
      "id": "routine:allowance:t2:p16_17:b4",
      "preset_id": "routine",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 23.823529411764707,
          "value_exact": "405/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 54.11764705882353,
          "value_exact": "920/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.9411764705882353,
      "posterior_exact": "16/17",
      "remaining_allowance": 4.0,
      "remaining_allowance_exact": "4",
      "value": 54.11764705882353,
      "value_exact": "920/17"
    },
    {
      "id": "routine:allowance:t2:p16_17:b8",
      "preset_id": "routine",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 23.823529411764707,
          "value_exact": "405/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 54.11764705882353,
          "value_exact": "920/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.9411764705882353,
      "posterior_exact": "16/17",
      "remaining_allowance": 8.0,
      "remaining_allowance_exact": "8",
      "value": 54.11764705882353,
      "value_exact": "920/17"
    },
    {
      "id": "routine:allowance:t2:p1_17:b0",
      "preset_id": "routine",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 6.176470588235294,
          "value_exact": "105/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -34.11764705882353,
          "value_exact": "-580/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.058823529411764705,
      "posterior_exact": "1/17",
      "remaining_allowance": 0.0,
      "remaining_allowance_exact": "0",
      "value": 6.176470588235294,
      "value_exact": "105/17"
    },
    {
      "id": "routine:allowance:t2:p1_17:b4",
      "preset_id": "routine",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 6.176470588235294,
          "value_exact": "105/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -34.11764705882353,
          "value_exact": "-580/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.058823529411764705,
      "posterior_exact": "1/17",
      "remaining_allowance": 4.0,
      "remaining_allowance_exact": "4",
      "value": 6.176470588235294,
      "value_exact": "105/17"
    },
    {
      "id": "routine:allowance:t2:p1_17:b8",
      "preset_id": "routine",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 6.176470588235294,
          "value_exact": "105/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -34.11764705882353,
          "value_exact": "-580/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.058823529411764705,
      "posterior_exact": "1/17",
      "remaining_allowance": 8.0,
      "remaining_allowance_exact": "8",
      "value": 6.176470588235294,
      "value_exact": "105/17"
    },
    {
      "id": "routine:allowance:t2:p1_2:b0",
      "preset_id": "routine",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": 0.0,
      "remaining_allowance_exact": "0",
      "value": 15.0,
      "value_exact": "15"
    },
    {
      "id": "routine:allowance:t2:p1_2:b4",
      "preset_id": "routine",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": 4.0,
      "remaining_allowance_exact": "4",
      "value": 15.0,
      "value_exact": "15"
    },
    {
      "id": "routine:allowance:t2:p1_2:b8",
      "preset_id": "routine",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": 8.0,
      "remaining_allowance_exact": "8",
      "value": 15.0,
      "value_exact": "15"
    },
    {
      "id": "routine:original:t0:p1_2:bunlimited",
      "preset_id": "routine",
      "contract": "original",
      "t": 0,
      "optimal_actions": [
        "wait"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "routine:original:t1:p4_5:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.8,
              "posterior_exact": "4/5"
            },
            {
              "sign": "-",
              "child": "routine:original:t1:p1_5:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.2,
              "posterior_exact": "1/5"
            }
          ],
          "value": 21.5,
          "value_exact": "43/2",
          "expense": 3.0,
          "expense_exact": "3"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "routine:original:t1:p4_5:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.8,
              "posterior_exact": "4/5"
            },
            {
              "sign": "-",
              "child": "routine:original:t1:p1_5:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.2,
              "posterior_exact": "1/5"
            }
          ],
          "value": 17.5,
          "value_exact": "35/2",
          "expense": 7.0,
          "expense_exact": "7"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 21.5,
      "value_exact": "43/2"
    },
    {
      "id": "routine:original:t1:p1_5:bunlimited",
      "preset_id": "routine",
      "contract": "original",
      "t": 1,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 9.0,
          "value_exact": "9",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -20.0,
          "value_exact": "-20",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "routine:original:t2:p1_2:bunlimited",
              "probability": 0.32,
              "probability_exact": "8/25",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "routine:original:t2:p1_17:bunlimited",
              "probability": 0.68,
              "probability_exact": "17/25",
              "posterior": 0.058823529411764705,
              "posterior_exact": "1/17"
            }
          ],
          "value": 6.0,
          "value_exact": "6",
          "expense": 3.0,
          "expense_exact": "3"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "routine:original:t2:p1_2:bunlimited",
              "probability": 0.32,
              "probability_exact": "8/25",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "routine:original:t2:p1_17:bunlimited",
              "probability": 0.68,
              "probability_exact": "17/25",
              "posterior": 0.058823529411764705,
              "posterior_exact": "1/17"
            }
          ],
          "value": 2.0,
          "value_exact": "2",
          "expense": 7.0,
          "expense_exact": "7"
        }
      ],
      "posterior": 0.2,
      "posterior_exact": "1/5",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 9.0,
      "value_exact": "9"
    },
    {
      "id": "routine:original:t1:p4_5:bunlimited",
      "preset_id": "routine",
      "contract": "original",
      "t": 1,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 21.0,
          "value_exact": "21",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 40.0,
          "value_exact": "40",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "routine:original:t2:p16_17:bunlimited",
              "probability": 0.68,
              "probability_exact": "17/25",
              "posterior": 0.9411764705882353,
              "posterior_exact": "16/17"
            },
            {
              "sign": "-",
              "child": "routine:original:t2:p1_2:bunlimited",
              "probability": 0.32,
              "probability_exact": "8/25",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 38.6,
          "value_exact": "193/5",
          "expense": 3.0,
          "expense_exact": "3"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "routine:original:t2:p16_17:bunlimited",
              "probability": 0.68,
              "probability_exact": "17/25",
              "posterior": 0.9411764705882353,
              "posterior_exact": "16/17"
            },
            {
              "sign": "-",
              "child": "routine:original:t2:p1_2:bunlimited",
              "probability": 0.32,
              "probability_exact": "8/25",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 34.6,
          "value_exact": "173/5",
          "expense": 7.0,
          "expense_exact": "7"
        }
      ],
      "posterior": 0.8,
      "posterior_exact": "4/5",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 40.0,
      "value_exact": "40"
    },
    {
      "id": "routine:original:t2:p16_17:bunlimited",
      "preset_id": "routine",
      "contract": "original",
      "t": 2,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 23.823529411764707,
          "value_exact": "405/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 54.11764705882353,
          "value_exact": "920/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.9411764705882353,
      "posterior_exact": "16/17",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 54.11764705882353,
      "value_exact": "920/17"
    },
    {
      "id": "routine:original:t2:p1_17:bunlimited",
      "preset_id": "routine",
      "contract": "original",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 6.176470588235294,
          "value_exact": "105/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -34.11764705882353,
          "value_exact": "-580/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.058823529411764705,
      "posterior_exact": "1/17",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 6.176470588235294,
      "value_exact": "105/17"
    },
    {
      "id": "routine:original:t2:p1_2:bunlimited",
      "preset_id": "routine",
      "contract": "original",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 15.0,
      "value_exact": "15"
    },
    {
      "id": "sequential:allowance:t0:p1_2:b1",
      "preset_id": "sequential",
      "contract": "allowance",
      "t": 0,
      "optimal_actions": [
        "test"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:allowance:t1:p1_2:b1",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "sequential:allowance:t1:p1_2:b1",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 19.55,
          "value_exact": "391/20",
          "expense": 0.5,
          "expense_exact": "1/2"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:allowance:t1:p7_10:b1_2",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.7,
              "posterior_exact": "7/10"
            },
            {
              "sign": "-",
              "child": "sequential:allowance:t1:p3_10:b1_2",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.3,
              "posterior_exact": "3/10"
            }
          ],
          "value": 20.05,
          "value_exact": "401/20",
          "expense": 1.0,
          "expense_exact": "1"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": 1.0,
      "remaining_allowance_exact": "1",
      "value": 20.05,
      "value_exact": "401/20"
    },
    {
      "id": "sequential:allowance:t1:p1_2:b1",
      "preset_id": "sequential",
      "contract": "allowance",
      "t": 1,
      "optimal_actions": [
        "test"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:allowance:t2:p1_2:b1",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "sequential:allowance:t2:p1_2:b1",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 19.0,
          "value_exact": "19",
          "expense": 0.5,
          "expense_exact": "1/2"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:allowance:t2:p7_10:b1_2",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.7,
              "posterior_exact": "7/10"
            },
            {
              "sign": "-",
              "child": "sequential:allowance:t2:p3_10:b1_2",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.3,
              "posterior_exact": "3/10"
            }
          ],
          "value": 20.05,
          "value_exact": "401/20",
          "expense": 1.0,
          "expense_exact": "1"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": 1.0,
      "remaining_allowance_exact": "1",
      "value": 20.05,
      "value_exact": "401/20"
    },
    {
      "id": "sequential:allowance:t1:p3_10:b1_2",
      "preset_id": "sequential",
      "contract": "allowance",
      "t": 1,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 11.0,
          "value_exact": "11",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -10.0,
          "value_exact": "-10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:allowance:t2:p3_10:b1_2",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.3,
              "posterior_exact": "3/10"
            },
            {
              "sign": "-",
              "child": "sequential:allowance:t2:p3_10:b1_2",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.3,
              "posterior_exact": "3/10"
            }
          ],
          "value": 10.5,
          "value_exact": "21/2",
          "expense": 0.5,
          "expense_exact": "1/2"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:allowance:t2:p1_2:b0",
              "probability": 0.42,
              "probability_exact": "21/50",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "sequential:allowance:t2:p9_58:b0",
              "probability": 0.58,
              "probability_exact": "29/50",
              "posterior": 0.15517241379310345,
              "posterior_exact": "9/58"
            }
          ],
          "value": 10.0,
          "value_exact": "10",
          "expense": 1.0,
          "expense_exact": "1"
        }
      ],
      "posterior": 0.3,
      "posterior_exact": "3/10",
      "remaining_allowance": 0.5,
      "remaining_allowance_exact": "1/2",
      "value": 11.0,
      "value_exact": "11"
    },
    {
      "id": "sequential:allowance:t1:p7_10:b1_2",
      "preset_id": "sequential",
      "contract": "allowance",
      "t": 1,
      "optimal_actions": [
        "test"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 19.0,
          "value_exact": "19",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 30.0,
          "value_exact": "30",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:allowance:t2:p7_10:b1_2",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.7,
              "posterior_exact": "7/10"
            },
            {
              "sign": "-",
              "child": "sequential:allowance:t2:p7_10:b1_2",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.7,
              "posterior_exact": "7/10"
            }
          ],
          "value": 30.6,
          "value_exact": "153/5",
          "expense": 0.5,
          "expense_exact": "1/2"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:allowance:t2:p49_58:b0",
              "probability": 0.58,
              "probability_exact": "29/50",
              "posterior": 0.8448275862068966,
              "posterior_exact": "49/58"
            },
            {
              "sign": "-",
              "child": "sequential:allowance:t2:p1_2:b0",
              "probability": 0.42,
              "probability_exact": "21/50",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 31.1,
          "value_exact": "311/10",
          "expense": 1.0,
          "expense_exact": "1"
        }
      ],
      "posterior": 0.7,
      "posterior_exact": "7/10",
      "remaining_allowance": 0.5,
      "remaining_allowance_exact": "1/2",
      "value": 31.1,
      "value_exact": "311/10"
    },
    {
      "id": "sequential:allowance:t2:p1_2:b0",
      "preset_id": "sequential",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:allowance:t3:p1_2:b0",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "sequential:allowance:t3:p1_2:b0",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 14.5,
          "value_exact": "29/2",
          "expense": 0.5,
          "expense_exact": "1/2"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": 0.0,
      "remaining_allowance_exact": "0",
      "value": 15.0,
      "value_exact": "15"
    },
    {
      "id": "sequential:allowance:t2:p1_2:b1",
      "preset_id": "sequential",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "test"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:allowance:t3:p1_2:b1",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "sequential:allowance:t3:p1_2:b1",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 14.5,
          "value_exact": "29/2",
          "expense": 0.5,
          "expense_exact": "1/2"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:allowance:t3:p7_10:b1_2",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.7,
              "posterior_exact": "7/10"
            },
            {
              "sign": "-",
              "child": "sequential:allowance:t3:p3_10:b1_2",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.3,
              "posterior_exact": "3/10"
            }
          ],
          "value": 19.5,
          "value_exact": "39/2",
          "expense": 1.0,
          "expense_exact": "1"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": 1.0,
      "remaining_allowance_exact": "1",
      "value": 19.5,
      "value_exact": "39/2"
    },
    {
      "id": "sequential:allowance:t2:p3_10:b1_2",
      "preset_id": "sequential",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 11.0,
          "value_exact": "11",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -10.0,
          "value_exact": "-10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:allowance:t3:p3_10:b1_2",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.3,
              "posterior_exact": "3/10"
            },
            {
              "sign": "-",
              "child": "sequential:allowance:t3:p3_10:b1_2",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.3,
              "posterior_exact": "3/10"
            }
          ],
          "value": 10.5,
          "value_exact": "21/2",
          "expense": 0.5,
          "expense_exact": "1/2"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:allowance:t3:p1_2:b0",
              "probability": 0.42,
              "probability_exact": "21/50",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "sequential:allowance:t3:p9_58:b0",
              "probability": 0.58,
              "probability_exact": "29/50",
              "posterior": 0.15517241379310345,
              "posterior_exact": "9/58"
            }
          ],
          "value": 10.0,
          "value_exact": "10",
          "expense": 1.0,
          "expense_exact": "1"
        }
      ],
      "posterior": 0.3,
      "posterior_exact": "3/10",
      "remaining_allowance": 0.5,
      "remaining_allowance_exact": "1/2",
      "value": 11.0,
      "value_exact": "11"
    },
    {
      "id": "sequential:allowance:t2:p49_58:b0",
      "preset_id": "sequential",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 21.896551724137932,
          "value_exact": "635/29",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 44.48275862068966,
          "value_exact": "1290/29",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:allowance:t3:p49_58:b0",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.8448275862068966,
              "posterior_exact": "49/58"
            },
            {
              "sign": "-",
              "child": "sequential:allowance:t3:p49_58:b0",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.8448275862068966,
              "posterior_exact": "49/58"
            }
          ],
          "value": 43.98275862068966,
          "value_exact": "2551/58",
          "expense": 0.5,
          "expense_exact": "1/2"
        }
      ],
      "posterior": 0.8448275862068966,
      "posterior_exact": "49/58",
      "remaining_allowance": 0.0,
      "remaining_allowance_exact": "0",
      "value": 44.48275862068966,
      "value_exact": "1290/29"
    },
    {
      "id": "sequential:allowance:t2:p7_10:b1_2",
      "preset_id": "sequential",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "test"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 19.0,
          "value_exact": "19",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 30.0,
          "value_exact": "30",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:allowance:t3:p7_10:b1_2",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.7,
              "posterior_exact": "7/10"
            },
            {
              "sign": "-",
              "child": "sequential:allowance:t3:p7_10:b1_2",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.7,
              "posterior_exact": "7/10"
            }
          ],
          "value": 29.5,
          "value_exact": "59/2",
          "expense": 0.5,
          "expense_exact": "1/2"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:allowance:t3:p49_58:b0",
              "probability": 0.58,
              "probability_exact": "29/50",
              "posterior": 0.8448275862068966,
              "posterior_exact": "49/58"
            },
            {
              "sign": "-",
              "child": "sequential:allowance:t3:p1_2:b0",
              "probability": 0.42,
              "probability_exact": "21/50",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 31.1,
          "value_exact": "311/10",
          "expense": 1.0,
          "expense_exact": "1"
        }
      ],
      "posterior": 0.7,
      "posterior_exact": "7/10",
      "remaining_allowance": 0.5,
      "remaining_allowance_exact": "1/2",
      "value": 31.1,
      "value_exact": "311/10"
    },
    {
      "id": "sequential:allowance:t2:p9_58:b0",
      "preset_id": "sequential",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 8.10344827586207,
          "value_exact": "235/29",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -24.482758620689655,
          "value_exact": "-710/29",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:allowance:t3:p9_58:b0",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.15517241379310345,
              "posterior_exact": "9/58"
            },
            {
              "sign": "-",
              "child": "sequential:allowance:t3:p9_58:b0",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.15517241379310345,
              "posterior_exact": "9/58"
            }
          ],
          "value": 7.603448275862069,
          "value_exact": "441/58",
          "expense": 0.5,
          "expense_exact": "1/2"
        }
      ],
      "posterior": 0.15517241379310345,
      "posterior_exact": "9/58",
      "remaining_allowance": 0.0,
      "remaining_allowance_exact": "0",
      "value": 8.10344827586207,
      "value_exact": "235/29"
    },
    {
      "id": "sequential:allowance:t3:p1_2:b0",
      "preset_id": "sequential",
      "contract": "allowance",
      "t": 3,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": 0.0,
      "remaining_allowance_exact": "0",
      "value": 15.0,
      "value_exact": "15"
    },
    {
      "id": "sequential:allowance:t3:p1_2:b1",
      "preset_id": "sequential",
      "contract": "allowance",
      "t": 3,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": 1.0,
      "remaining_allowance_exact": "1",
      "value": 15.0,
      "value_exact": "15"
    },
    {
      "id": "sequential:allowance:t3:p3_10:b1_2",
      "preset_id": "sequential",
      "contract": "allowance",
      "t": 3,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 11.0,
          "value_exact": "11",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -10.0,
          "value_exact": "-10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.3,
      "posterior_exact": "3/10",
      "remaining_allowance": 0.5,
      "remaining_allowance_exact": "1/2",
      "value": 11.0,
      "value_exact": "11"
    },
    {
      "id": "sequential:allowance:t3:p49_58:b0",
      "preset_id": "sequential",
      "contract": "allowance",
      "t": 3,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 21.896551724137932,
          "value_exact": "635/29",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 44.48275862068966,
          "value_exact": "1290/29",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.8448275862068966,
      "posterior_exact": "49/58",
      "remaining_allowance": 0.0,
      "remaining_allowance_exact": "0",
      "value": 44.48275862068966,
      "value_exact": "1290/29"
    },
    {
      "id": "sequential:allowance:t3:p7_10:b1_2",
      "preset_id": "sequential",
      "contract": "allowance",
      "t": 3,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 19.0,
          "value_exact": "19",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 30.0,
          "value_exact": "30",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.7,
      "posterior_exact": "7/10",
      "remaining_allowance": 0.5,
      "remaining_allowance_exact": "1/2",
      "value": 30.0,
      "value_exact": "30"
    },
    {
      "id": "sequential:allowance:t3:p9_58:b0",
      "preset_id": "sequential",
      "contract": "allowance",
      "t": 3,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 8.10344827586207,
          "value_exact": "235/29",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -24.482758620689655,
          "value_exact": "-710/29",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.15517241379310345,
      "posterior_exact": "9/58",
      "remaining_allowance": 0.0,
      "remaining_allowance_exact": "0",
      "value": 8.10344827586207,
      "value_exact": "235/29"
    },
    {
      "id": "sequential:original:t0:p1_2:bunlimited",
      "preset_id": "sequential",
      "contract": "original",
      "t": 0,
      "optimal_actions": [
        "test"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:original:t1:p1_2:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "sequential:original:t1:p1_2:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 19.55,
          "value_exact": "391/20",
          "expense": 0.5,
          "expense_exact": "1/2"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:original:t1:p7_10:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.7,
              "posterior_exact": "7/10"
            },
            {
              "sign": "-",
              "child": "sequential:original:t1:p3_10:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.3,
              "posterior_exact": "3/10"
            }
          ],
          "value": 21.44,
          "value_exact": "536/25",
          "expense": 1.0,
          "expense_exact": "1"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 21.44,
      "value_exact": "536/25"
    },
    {
      "id": "sequential:original:t1:p1_2:bunlimited",
      "preset_id": "sequential",
      "contract": "original",
      "t": 1,
      "optimal_actions": [
        "test"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:original:t2:p1_2:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "sequential:original:t2:p1_2:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 19.0,
          "value_exact": "19",
          "expense": 0.5,
          "expense_exact": "1/2"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:original:t2:p7_10:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.7,
              "posterior_exact": "7/10"
            },
            {
              "sign": "-",
              "child": "sequential:original:t2:p3_10:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.3,
              "posterior_exact": "3/10"
            }
          ],
          "value": 20.05,
          "value_exact": "401/20",
          "expense": 1.0,
          "expense_exact": "1"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 20.05,
      "value_exact": "401/20"
    },
    {
      "id": "sequential:original:t1:p3_10:bunlimited",
      "preset_id": "sequential",
      "contract": "original",
      "t": 1,
      "optimal_actions": [
        "test"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 11.0,
          "value_exact": "11",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -10.0,
          "value_exact": "-10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:original:t2:p3_10:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.3,
              "posterior_exact": "3/10"
            },
            {
              "sign": "-",
              "child": "sequential:original:t2:p3_10:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.3,
              "posterior_exact": "3/10"
            }
          ],
          "value": 10.5,
          "value_exact": "21/2",
          "expense": 0.5,
          "expense_exact": "1/2"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:original:t2:p1_2:bunlimited",
              "probability": 0.42,
              "probability_exact": "21/50",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "sequential:original:t2:p9_58:bunlimited",
              "probability": 0.58,
              "probability_exact": "29/50",
              "posterior": 0.15517241379310345,
              "posterior_exact": "9/58"
            }
          ],
          "value": 11.89,
          "value_exact": "1189/100",
          "expense": 1.0,
          "expense_exact": "1"
        }
      ],
      "posterior": 0.3,
      "posterior_exact": "3/10",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 11.89,
      "value_exact": "1189/100"
    },
    {
      "id": "sequential:original:t1:p7_10:bunlimited",
      "preset_id": "sequential",
      "contract": "original",
      "t": 1,
      "optimal_actions": [
        "test"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 19.0,
          "value_exact": "19",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 30.0,
          "value_exact": "30",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:original:t2:p7_10:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.7,
              "posterior_exact": "7/10"
            },
            {
              "sign": "-",
              "child": "sequential:original:t2:p7_10:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.7,
              "posterior_exact": "7/10"
            }
          ],
          "value": 30.6,
          "value_exact": "153/5",
          "expense": 0.5,
          "expense_exact": "1/2"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:original:t2:p49_58:bunlimited",
              "probability": 0.58,
              "probability_exact": "29/50",
              "posterior": 0.8448275862068966,
              "posterior_exact": "49/58"
            },
            {
              "sign": "-",
              "child": "sequential:original:t2:p1_2:bunlimited",
              "probability": 0.42,
              "probability_exact": "21/50",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 32.99,
          "value_exact": "3299/100",
          "expense": 1.0,
          "expense_exact": "1"
        }
      ],
      "posterior": 0.7,
      "posterior_exact": "7/10",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 32.99,
      "value_exact": "3299/100"
    },
    {
      "id": "sequential:original:t2:p1_2:bunlimited",
      "preset_id": "sequential",
      "contract": "original",
      "t": 2,
      "optimal_actions": [
        "test"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:original:t3:p1_2:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "sequential:original:t3:p1_2:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 14.5,
          "value_exact": "29/2",
          "expense": 0.5,
          "expense_exact": "1/2"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:original:t3:p7_10:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.7,
              "posterior_exact": "7/10"
            },
            {
              "sign": "-",
              "child": "sequential:original:t3:p3_10:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.3,
              "posterior_exact": "3/10"
            }
          ],
          "value": 19.5,
          "value_exact": "39/2",
          "expense": 1.0,
          "expense_exact": "1"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 19.5,
      "value_exact": "39/2"
    },
    {
      "id": "sequential:original:t2:p3_10:bunlimited",
      "preset_id": "sequential",
      "contract": "original",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 11.0,
          "value_exact": "11",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -10.0,
          "value_exact": "-10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:original:t3:p3_10:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.3,
              "posterior_exact": "3/10"
            },
            {
              "sign": "-",
              "child": "sequential:original:t3:p3_10:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.3,
              "posterior_exact": "3/10"
            }
          ],
          "value": 10.5,
          "value_exact": "21/2",
          "expense": 0.5,
          "expense_exact": "1/2"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:original:t3:p1_2:bunlimited",
              "probability": 0.42,
              "probability_exact": "21/50",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "sequential:original:t3:p9_58:bunlimited",
              "probability": 0.58,
              "probability_exact": "29/50",
              "posterior": 0.15517241379310345,
              "posterior_exact": "9/58"
            }
          ],
          "value": 10.0,
          "value_exact": "10",
          "expense": 1.0,
          "expense_exact": "1"
        }
      ],
      "posterior": 0.3,
      "posterior_exact": "3/10",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 11.0,
      "value_exact": "11"
    },
    {
      "id": "sequential:original:t2:p49_58:bunlimited",
      "preset_id": "sequential",
      "contract": "original",
      "t": 2,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 21.896551724137932,
          "value_exact": "635/29",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 44.48275862068966,
          "value_exact": "1290/29",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:original:t3:p49_58:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.8448275862068966,
              "posterior_exact": "49/58"
            },
            {
              "sign": "-",
              "child": "sequential:original:t3:p49_58:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.8448275862068966,
              "posterior_exact": "49/58"
            }
          ],
          "value": 43.98275862068966,
          "value_exact": "2551/58",
          "expense": 0.5,
          "expense_exact": "1/2"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:original:t3:p343_370:bunlimited",
              "probability": 0.6379310344827587,
              "probability_exact": "37/58",
              "posterior": 0.927027027027027,
              "posterior_exact": "343/370"
            },
            {
              "sign": "-",
              "child": "sequential:original:t3:p7_10:bunlimited",
              "probability": 0.3620689655172414,
              "probability_exact": "21/58",
              "posterior": 0.7,
              "posterior_exact": "7/10"
            }
          ],
          "value": 43.48275862068966,
          "value_exact": "1261/29",
          "expense": 1.0,
          "expense_exact": "1"
        }
      ],
      "posterior": 0.8448275862068966,
      "posterior_exact": "49/58",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 44.48275862068966,
      "value_exact": "1290/29"
    },
    {
      "id": "sequential:original:t2:p7_10:bunlimited",
      "preset_id": "sequential",
      "contract": "original",
      "t": 2,
      "optimal_actions": [
        "test"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 19.0,
          "value_exact": "19",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 30.0,
          "value_exact": "30",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:original:t3:p7_10:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.7,
              "posterior_exact": "7/10"
            },
            {
              "sign": "-",
              "child": "sequential:original:t3:p7_10:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.7,
              "posterior_exact": "7/10"
            }
          ],
          "value": 29.5,
          "value_exact": "59/2",
          "expense": 0.5,
          "expense_exact": "1/2"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:original:t3:p49_58:bunlimited",
              "probability": 0.58,
              "probability_exact": "29/50",
              "posterior": 0.8448275862068966,
              "posterior_exact": "49/58"
            },
            {
              "sign": "-",
              "child": "sequential:original:t3:p1_2:bunlimited",
              "probability": 0.42,
              "probability_exact": "21/50",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 31.1,
          "value_exact": "311/10",
          "expense": 1.0,
          "expense_exact": "1"
        }
      ],
      "posterior": 0.7,
      "posterior_exact": "7/10",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 31.1,
      "value_exact": "311/10"
    },
    {
      "id": "sequential:original:t2:p9_58:bunlimited",
      "preset_id": "sequential",
      "contract": "original",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 8.10344827586207,
          "value_exact": "235/29",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -24.482758620689655,
          "value_exact": "-710/29",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:original:t3:p9_58:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.15517241379310345,
              "posterior_exact": "9/58"
            },
            {
              "sign": "-",
              "child": "sequential:original:t3:p9_58:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.15517241379310345,
              "posterior_exact": "9/58"
            }
          ],
          "value": 7.603448275862069,
          "value_exact": "441/58",
          "expense": 0.5,
          "expense_exact": "1/2"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "sequential:original:t3:p3_10:bunlimited",
              "probability": 0.3620689655172414,
              "probability_exact": "21/58",
              "posterior": 0.3,
              "posterior_exact": "3/10"
            },
            {
              "sign": "-",
              "child": "sequential:original:t3:p27_370:bunlimited",
              "probability": 0.6379310344827587,
              "probability_exact": "37/58",
              "posterior": 0.07297297297297298,
              "posterior_exact": "27/370"
            }
          ],
          "value": 7.103448275862069,
          "value_exact": "206/29",
          "expense": 1.0,
          "expense_exact": "1"
        }
      ],
      "posterior": 0.15517241379310345,
      "posterior_exact": "9/58",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 8.10344827586207,
      "value_exact": "235/29"
    },
    {
      "id": "sequential:original:t3:p1_2:bunlimited",
      "preset_id": "sequential",
      "contract": "original",
      "t": 3,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 15.0,
      "value_exact": "15"
    },
    {
      "id": "sequential:original:t3:p27_370:bunlimited",
      "preset_id": "sequential",
      "contract": "original",
      "t": 3,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 6.45945945945946,
          "value_exact": "239/37",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -32.7027027027027,
          "value_exact": "-1210/37",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.07297297297297298,
      "posterior_exact": "27/370",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 6.45945945945946,
      "value_exact": "239/37"
    },
    {
      "id": "sequential:original:t3:p343_370:bunlimited",
      "preset_id": "sequential",
      "contract": "original",
      "t": 3,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 23.54054054054054,
          "value_exact": "871/37",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 52.7027027027027,
          "value_exact": "1950/37",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.927027027027027,
      "posterior_exact": "343/370",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 52.7027027027027,
      "value_exact": "1950/37"
    },
    {
      "id": "sequential:original:t3:p3_10:bunlimited",
      "preset_id": "sequential",
      "contract": "original",
      "t": 3,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 11.0,
          "value_exact": "11",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -10.0,
          "value_exact": "-10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.3,
      "posterior_exact": "3/10",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 11.0,
      "value_exact": "11"
    },
    {
      "id": "sequential:original:t3:p49_58:bunlimited",
      "preset_id": "sequential",
      "contract": "original",
      "t": 3,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 21.896551724137932,
          "value_exact": "635/29",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 44.48275862068966,
          "value_exact": "1290/29",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.8448275862068966,
      "posterior_exact": "49/58",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 44.48275862068966,
      "value_exact": "1290/29"
    },
    {
      "id": "sequential:original:t3:p7_10:bunlimited",
      "preset_id": "sequential",
      "contract": "original",
      "t": 3,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 19.0,
          "value_exact": "19",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 30.0,
          "value_exact": "30",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.7,
      "posterior_exact": "7/10",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 30.0,
      "value_exact": "30"
    },
    {
      "id": "sequential:original:t3:p9_58:bunlimited",
      "preset_id": "sequential",
      "contract": "original",
      "t": 3,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 8.10344827586207,
          "value_exact": "235/29",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -24.482758620689655,
          "value_exact": "-710/29",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.15517241379310345,
      "posterior_exact": "9/58",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 8.10344827586207,
      "value_exact": "235/29"
    },
    {
      "id": "timely:allowance:t0:p1_2:b8",
      "preset_id": "timely",
      "contract": "allowance",
      "t": 0,
      "optimal_actions": [
        "test"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "timely:allowance:t1:p1_2:b8",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "timely:allowance:t1:p1_2:b8",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 14.5,
          "value_exact": "29/2",
          "expense": 3.0,
          "expense_exact": "3"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "timely:allowance:t1:p4_5:b4",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.8,
              "posterior_exact": "4/5"
            },
            {
              "sign": "-",
              "child": "timely:allowance:t1:p1_5:b4",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.2,
              "posterior_exact": "1/5"
            }
          ],
          "value": 17.5,
          "value_exact": "35/2",
          "expense": 7.0,
          "expense_exact": "7"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": 8.0,
      "remaining_allowance_exact": "8",
      "value": 17.5,
      "value_exact": "35/2"
    },
    {
      "id": "timely:allowance:t1:p1_2:b8",
      "preset_id": "timely",
      "contract": "allowance",
      "t": 1,
      "optimal_actions": [
        "test"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "timely:allowance:t2:p1_2:b8",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "timely:allowance:t2:p1_2:b8",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 12.0,
          "value_exact": "12",
          "expense": 3.0,
          "expense_exact": "3"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "timely:allowance:t2:p4_5:b4",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.8,
              "posterior_exact": "4/5"
            },
            {
              "sign": "-",
              "child": "timely:allowance:t2:p1_5:b4",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.2,
              "posterior_exact": "1/5"
            }
          ],
          "value": 17.5,
          "value_exact": "35/2",
          "expense": 7.0,
          "expense_exact": "7"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": 8.0,
      "remaining_allowance_exact": "8",
      "value": 17.5,
      "value_exact": "35/2"
    },
    {
      "id": "timely:allowance:t1:p1_5:b4",
      "preset_id": "timely",
      "contract": "allowance",
      "t": 1,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 9.0,
          "value_exact": "9",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -20.0,
          "value_exact": "-20",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "timely:allowance:t2:p1_5:b4",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.2,
              "posterior_exact": "1/5"
            },
            {
              "sign": "-",
              "child": "timely:allowance:t2:p1_5:b4",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.2,
              "posterior_exact": "1/5"
            }
          ],
          "value": 6.0,
          "value_exact": "6",
          "expense": 3.0,
          "expense_exact": "3"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "timely:allowance:t2:p1_2:b0",
              "probability": 0.32,
              "probability_exact": "8/25",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "timely:allowance:t2:p1_17:b0",
              "probability": 0.68,
              "probability_exact": "17/25",
              "posterior": 0.058823529411764705,
              "posterior_exact": "1/17"
            }
          ],
          "value": 2.0,
          "value_exact": "2",
          "expense": 7.0,
          "expense_exact": "7"
        }
      ],
      "posterior": 0.2,
      "posterior_exact": "1/5",
      "remaining_allowance": 4.0,
      "remaining_allowance_exact": "4",
      "value": 9.0,
      "value_exact": "9"
    },
    {
      "id": "timely:allowance:t1:p4_5:b4",
      "preset_id": "timely",
      "contract": "allowance",
      "t": 1,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 21.0,
          "value_exact": "21",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 40.0,
          "value_exact": "40",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "timely:allowance:t2:p4_5:b4",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.8,
              "posterior_exact": "4/5"
            },
            {
              "sign": "-",
              "child": "timely:allowance:t2:p4_5:b4",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.8,
              "posterior_exact": "4/5"
            }
          ],
          "value": 37.0,
          "value_exact": "37",
          "expense": 3.0,
          "expense_exact": "3"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "timely:allowance:t2:p16_17:b0",
              "probability": 0.68,
              "probability_exact": "17/25",
              "posterior": 0.9411764705882353,
              "posterior_exact": "16/17"
            },
            {
              "sign": "-",
              "child": "timely:allowance:t2:p1_2:b0",
              "probability": 0.32,
              "probability_exact": "8/25",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 34.6,
          "value_exact": "173/5",
          "expense": 7.0,
          "expense_exact": "7"
        }
      ],
      "posterior": 0.8,
      "posterior_exact": "4/5",
      "remaining_allowance": 4.0,
      "remaining_allowance_exact": "4",
      "value": 40.0,
      "value_exact": "40"
    },
    {
      "id": "timely:allowance:t2:p16_17:b0",
      "preset_id": "timely",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 23.823529411764707,
          "value_exact": "405/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 54.11764705882353,
          "value_exact": "920/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.9411764705882353,
      "posterior_exact": "16/17",
      "remaining_allowance": 0.0,
      "remaining_allowance_exact": "0",
      "value": 54.11764705882353,
      "value_exact": "920/17"
    },
    {
      "id": "timely:allowance:t2:p1_17:b0",
      "preset_id": "timely",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 6.176470588235294,
          "value_exact": "105/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -34.11764705882353,
          "value_exact": "-580/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.058823529411764705,
      "posterior_exact": "1/17",
      "remaining_allowance": 0.0,
      "remaining_allowance_exact": "0",
      "value": 6.176470588235294,
      "value_exact": "105/17"
    },
    {
      "id": "timely:allowance:t2:p1_2:b0",
      "preset_id": "timely",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": 0.0,
      "remaining_allowance_exact": "0",
      "value": 15.0,
      "value_exact": "15"
    },
    {
      "id": "timely:allowance:t2:p1_2:b8",
      "preset_id": "timely",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": 8.0,
      "remaining_allowance_exact": "8",
      "value": 15.0,
      "value_exact": "15"
    },
    {
      "id": "timely:allowance:t2:p1_5:b4",
      "preset_id": "timely",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 9.0,
          "value_exact": "9",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -20.0,
          "value_exact": "-20",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.2,
      "posterior_exact": "1/5",
      "remaining_allowance": 4.0,
      "remaining_allowance_exact": "4",
      "value": 9.0,
      "value_exact": "9"
    },
    {
      "id": "timely:allowance:t2:p4_5:b4",
      "preset_id": "timely",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 21.0,
          "value_exact": "21",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 40.0,
          "value_exact": "40",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.8,
      "posterior_exact": "4/5",
      "remaining_allowance": 4.0,
      "remaining_allowance_exact": "4",
      "value": 40.0,
      "value_exact": "40"
    },
    {
      "id": "timely:original:t0:p1_2:bunlimited",
      "preset_id": "timely",
      "contract": "original",
      "t": 0,
      "optimal_actions": [
        "test"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "timely:original:t1:p1_2:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "timely:original:t1:p1_2:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 14.5,
          "value_exact": "29/2",
          "expense": 3.0,
          "expense_exact": "3"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "timely:original:t1:p4_5:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.8,
              "posterior_exact": "4/5"
            },
            {
              "sign": "-",
              "child": "timely:original:t1:p1_5:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.2,
              "posterior_exact": "1/5"
            }
          ],
          "value": 17.5,
          "value_exact": "35/2",
          "expense": 7.0,
          "expense_exact": "7"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 17.5,
      "value_exact": "35/2"
    },
    {
      "id": "timely:original:t1:p1_2:bunlimited",
      "preset_id": "timely",
      "contract": "original",
      "t": 1,
      "optimal_actions": [
        "test"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "timely:original:t2:p1_2:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "timely:original:t2:p1_2:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 12.0,
          "value_exact": "12",
          "expense": 3.0,
          "expense_exact": "3"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "timely:original:t2:p4_5:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.8,
              "posterior_exact": "4/5"
            },
            {
              "sign": "-",
              "child": "timely:original:t2:p1_5:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.2,
              "posterior_exact": "1/5"
            }
          ],
          "value": 17.5,
          "value_exact": "35/2",
          "expense": 7.0,
          "expense_exact": "7"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 17.5,
      "value_exact": "35/2"
    },
    {
      "id": "timely:original:t1:p1_5:bunlimited",
      "preset_id": "timely",
      "contract": "original",
      "t": 1,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 9.0,
          "value_exact": "9",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -20.0,
          "value_exact": "-20",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "timely:original:t2:p1_5:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.2,
              "posterior_exact": "1/5"
            },
            {
              "sign": "-",
              "child": "timely:original:t2:p1_5:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.2,
              "posterior_exact": "1/5"
            }
          ],
          "value": 6.0,
          "value_exact": "6",
          "expense": 3.0,
          "expense_exact": "3"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "timely:original:t2:p1_2:bunlimited",
              "probability": 0.32,
              "probability_exact": "8/25",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            },
            {
              "sign": "-",
              "child": "timely:original:t2:p1_17:bunlimited",
              "probability": 0.68,
              "probability_exact": "17/25",
              "posterior": 0.058823529411764705,
              "posterior_exact": "1/17"
            }
          ],
          "value": 2.0,
          "value_exact": "2",
          "expense": 7.0,
          "expense_exact": "7"
        }
      ],
      "posterior": 0.2,
      "posterior_exact": "1/5",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 9.0,
      "value_exact": "9"
    },
    {
      "id": "timely:original:t1:p4_5:bunlimited",
      "preset_id": "timely",
      "contract": "original",
      "t": 1,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 21.0,
          "value_exact": "21",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 40.0,
          "value_exact": "40",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "timely:original:t2:p4_5:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.8,
              "posterior_exact": "4/5"
            },
            {
              "sign": "-",
              "child": "timely:original:t2:p4_5:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.8,
              "posterior_exact": "4/5"
            }
          ],
          "value": 37.0,
          "value_exact": "37",
          "expense": 3.0,
          "expense_exact": "3"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "timely:original:t2:p16_17:bunlimited",
              "probability": 0.68,
              "probability_exact": "17/25",
              "posterior": 0.9411764705882353,
              "posterior_exact": "16/17"
            },
            {
              "sign": "-",
              "child": "timely:original:t2:p1_2:bunlimited",
              "probability": 0.32,
              "probability_exact": "8/25",
              "posterior": 0.5,
              "posterior_exact": "1/2"
            }
          ],
          "value": 34.6,
          "value_exact": "173/5",
          "expense": 7.0,
          "expense_exact": "7"
        }
      ],
      "posterior": 0.8,
      "posterior_exact": "4/5",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 40.0,
      "value_exact": "40"
    },
    {
      "id": "timely:original:t2:p16_17:bunlimited",
      "preset_id": "timely",
      "contract": "original",
      "t": 2,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 23.823529411764707,
          "value_exact": "405/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 54.11764705882353,
          "value_exact": "920/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.9411764705882353,
      "posterior_exact": "16/17",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 54.11764705882353,
      "value_exact": "920/17"
    },
    {
      "id": "timely:original:t2:p1_17:bunlimited",
      "preset_id": "timely",
      "contract": "original",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 6.176470588235294,
          "value_exact": "105/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -34.11764705882353,
          "value_exact": "-580/17",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.058823529411764705,
      "posterior_exact": "1/17",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 6.176470588235294,
      "value_exact": "105/17"
    },
    {
      "id": "timely:original:t2:p1_2:bunlimited",
      "preset_id": "timely",
      "contract": "original",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.0,
          "value_exact": "15",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 10.0,
          "value_exact": "10",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.5,
      "posterior_exact": "1/2",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 15.0,
      "value_exact": "15"
    },
    {
      "id": "timely:original:t2:p1_5:bunlimited",
      "preset_id": "timely",
      "contract": "original",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 9.0,
          "value_exact": "9",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": -20.0,
          "value_exact": "-20",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.2,
      "posterior_exact": "1/5",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 9.0,
      "value_exact": "9"
    },
    {
      "id": "timely:original:t2:p4_5:bunlimited",
      "preset_id": "timely",
      "contract": "original",
      "t": 2,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 21.0,
          "value_exact": "21",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 40.0,
          "value_exact": "40",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.8,
      "posterior_exact": "4/5",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 40.0,
      "value_exact": "40"
    },
    {
      "id": "unchanged:allowance:t0:p19_20:b8",
      "preset_id": "unchanged",
      "contract": "allowance",
      "t": 0,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 24.0,
          "value_exact": "24",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 55.0,
          "value_exact": "55",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "unchanged:allowance:t1:p19_20:b8",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.95,
              "posterior_exact": "19/20"
            },
            {
              "sign": "-",
              "child": "unchanged:allowance:t1:p19_20:b8",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.95,
              "posterior_exact": "19/20"
            }
          ],
          "value": 52.0,
          "value_exact": "52",
          "expense": 3.0,
          "expense_exact": "3"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "unchanged:allowance:t1:p76_77:b4",
              "probability": 0.77,
              "probability_exact": "77/100",
              "posterior": 0.987012987012987,
              "posterior_exact": "76/77"
            },
            {
              "sign": "-",
              "child": "unchanged:allowance:t1:p19_23:b4",
              "probability": 0.23,
              "probability_exact": "23/100",
              "posterior": 0.8260869565217391,
              "posterior_exact": "19/23"
            }
          ],
          "value": 48.0,
          "value_exact": "48",
          "expense": 7.0,
          "expense_exact": "7"
        }
      ],
      "posterior": 0.95,
      "posterior_exact": "19/20",
      "remaining_allowance": 8.0,
      "remaining_allowance_exact": "8",
      "value": 55.0,
      "value_exact": "55"
    },
    {
      "id": "unchanged:allowance:t1:p19_20:b8",
      "preset_id": "unchanged",
      "contract": "allowance",
      "t": 1,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 24.0,
          "value_exact": "24",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 55.0,
          "value_exact": "55",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "unchanged:allowance:t2:p19_20:b8",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.95,
              "posterior_exact": "19/20"
            },
            {
              "sign": "-",
              "child": "unchanged:allowance:t2:p19_20:b8",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.95,
              "posterior_exact": "19/20"
            }
          ],
          "value": 52.0,
          "value_exact": "52",
          "expense": 3.0,
          "expense_exact": "3"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "unchanged:allowance:t2:p76_77:b4",
              "probability": 0.77,
              "probability_exact": "77/100",
              "posterior": 0.987012987012987,
              "posterior_exact": "76/77"
            },
            {
              "sign": "-",
              "child": "unchanged:allowance:t2:p19_23:b4",
              "probability": 0.23,
              "probability_exact": "23/100",
              "posterior": 0.8260869565217391,
              "posterior_exact": "19/23"
            }
          ],
          "value": 48.0,
          "value_exact": "48",
          "expense": 7.0,
          "expense_exact": "7"
        }
      ],
      "posterior": 0.95,
      "posterior_exact": "19/20",
      "remaining_allowance": 8.0,
      "remaining_allowance_exact": "8",
      "value": 55.0,
      "value_exact": "55"
    },
    {
      "id": "unchanged:allowance:t1:p19_23:b4",
      "preset_id": "unchanged",
      "contract": "allowance",
      "t": 1,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 21.52173913043478,
          "value_exact": "495/23",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 42.608695652173914,
          "value_exact": "980/23",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "unchanged:allowance:t2:p19_23:b4",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.8260869565217391,
              "posterior_exact": "19/23"
            },
            {
              "sign": "-",
              "child": "unchanged:allowance:t2:p19_23:b4",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.8260869565217391,
              "posterior_exact": "19/23"
            }
          ],
          "value": 39.608695652173914,
          "value_exact": "911/23",
          "expense": 3.0,
          "expense_exact": "3"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "unchanged:allowance:t2:p19_20:b0",
              "probability": 0.6956521739130435,
              "probability_exact": "16/23",
              "posterior": 0.95,
              "posterior_exact": "19/20"
            },
            {
              "sign": "-",
              "child": "unchanged:allowance:t2:p19_35:b0",
              "probability": 0.30434782608695654,
              "probability_exact": "7/23",
              "posterior": 0.5428571428571428,
              "posterior_exact": "19/35"
            }
          ],
          "value": 36.08695652173913,
          "value_exact": "830/23",
          "expense": 7.0,
          "expense_exact": "7"
        }
      ],
      "posterior": 0.8260869565217391,
      "posterior_exact": "19/23",
      "remaining_allowance": 4.0,
      "remaining_allowance_exact": "4",
      "value": 42.608695652173914,
      "value_exact": "980/23"
    },
    {
      "id": "unchanged:allowance:t1:p76_77:b4",
      "preset_id": "unchanged",
      "contract": "allowance",
      "t": 1,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 24.74025974025974,
          "value_exact": "1905/77",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 58.701298701298704,
          "value_exact": "4520/77",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "unchanged:allowance:t2:p76_77:b4",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.987012987012987,
              "posterior_exact": "76/77"
            },
            {
              "sign": "-",
              "child": "unchanged:allowance:t2:p76_77:b4",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.987012987012987,
              "posterior_exact": "76/77"
            }
          ],
          "value": 55.701298701298704,
          "value_exact": "4289/77",
          "expense": 3.0,
          "expense_exact": "3"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "unchanged:allowance:t2:p304_305:b0",
              "probability": 0.7922077922077922,
              "probability_exact": "61/77",
              "posterior": 0.9967213114754099,
              "posterior_exact": "304/305"
            },
            {
              "sign": "-",
              "child": "unchanged:allowance:t2:p19_20:b0",
              "probability": 0.2077922077922078,
              "probability_exact": "16/77",
              "posterior": 0.95,
              "posterior_exact": "19/20"
            }
          ],
          "value": 51.701298701298704,
          "value_exact": "3981/77",
          "expense": 7.0,
          "expense_exact": "7"
        }
      ],
      "posterior": 0.987012987012987,
      "posterior_exact": "76/77",
      "remaining_allowance": 4.0,
      "remaining_allowance_exact": "4",
      "value": 58.701298701298704,
      "value_exact": "4520/77"
    },
    {
      "id": "unchanged:allowance:t2:p19_20:b0",
      "preset_id": "unchanged",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 24.0,
          "value_exact": "24",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 55.0,
          "value_exact": "55",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.95,
      "posterior_exact": "19/20",
      "remaining_allowance": 0.0,
      "remaining_allowance_exact": "0",
      "value": 55.0,
      "value_exact": "55"
    },
    {
      "id": "unchanged:allowance:t2:p19_20:b8",
      "preset_id": "unchanged",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 24.0,
          "value_exact": "24",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 55.0,
          "value_exact": "55",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.95,
      "posterior_exact": "19/20",
      "remaining_allowance": 8.0,
      "remaining_allowance_exact": "8",
      "value": 55.0,
      "value_exact": "55"
    },
    {
      "id": "unchanged:allowance:t2:p19_23:b4",
      "preset_id": "unchanged",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 21.52173913043478,
          "value_exact": "495/23",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 42.608695652173914,
          "value_exact": "980/23",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.8260869565217391,
      "posterior_exact": "19/23",
      "remaining_allowance": 4.0,
      "remaining_allowance_exact": "4",
      "value": 42.608695652173914,
      "value_exact": "980/23"
    },
    {
      "id": "unchanged:allowance:t2:p19_35:b0",
      "preset_id": "unchanged",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.857142857142858,
          "value_exact": "111/7",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 14.285714285714286,
          "value_exact": "100/7",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.5428571428571428,
      "posterior_exact": "19/35",
      "remaining_allowance": 0.0,
      "remaining_allowance_exact": "0",
      "value": 15.857142857142858,
      "value_exact": "111/7"
    },
    {
      "id": "unchanged:allowance:t2:p304_305:b0",
      "preset_id": "unchanged",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 24.934426229508198,
          "value_exact": "1521/61",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 59.67213114754098,
          "value_exact": "3640/61",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.9967213114754099,
      "posterior_exact": "304/305",
      "remaining_allowance": 0.0,
      "remaining_allowance_exact": "0",
      "value": 59.67213114754098,
      "value_exact": "3640/61"
    },
    {
      "id": "unchanged:allowance:t2:p76_77:b4",
      "preset_id": "unchanged",
      "contract": "allowance",
      "t": 2,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 24.74025974025974,
          "value_exact": "1905/77",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 58.701298701298704,
          "value_exact": "4520/77",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.987012987012987,
      "posterior_exact": "76/77",
      "remaining_allowance": 4.0,
      "remaining_allowance_exact": "4",
      "value": 58.701298701298704,
      "value_exact": "4520/77"
    },
    {
      "id": "unchanged:original:t0:p19_20:bunlimited",
      "preset_id": "unchanged",
      "contract": "original",
      "t": 0,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 24.0,
          "value_exact": "24",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 55.0,
          "value_exact": "55",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "unchanged:original:t1:p19_20:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.95,
              "posterior_exact": "19/20"
            },
            {
              "sign": "-",
              "child": "unchanged:original:t1:p19_20:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.95,
              "posterior_exact": "19/20"
            }
          ],
          "value": 52.0,
          "value_exact": "52",
          "expense": 3.0,
          "expense_exact": "3"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "unchanged:original:t1:p76_77:bunlimited",
              "probability": 0.77,
              "probability_exact": "77/100",
              "posterior": 0.987012987012987,
              "posterior_exact": "76/77"
            },
            {
              "sign": "-",
              "child": "unchanged:original:t1:p19_23:bunlimited",
              "probability": 0.23,
              "probability_exact": "23/100",
              "posterior": 0.8260869565217391,
              "posterior_exact": "19/23"
            }
          ],
          "value": 48.0,
          "value_exact": "48",
          "expense": 7.0,
          "expense_exact": "7"
        }
      ],
      "posterior": 0.95,
      "posterior_exact": "19/20",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 55.0,
      "value_exact": "55"
    },
    {
      "id": "unchanged:original:t1:p19_20:bunlimited",
      "preset_id": "unchanged",
      "contract": "original",
      "t": 1,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 24.0,
          "value_exact": "24",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 55.0,
          "value_exact": "55",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "unchanged:original:t2:p19_20:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.95,
              "posterior_exact": "19/20"
            },
            {
              "sign": "-",
              "child": "unchanged:original:t2:p19_20:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.95,
              "posterior_exact": "19/20"
            }
          ],
          "value": 52.0,
          "value_exact": "52",
          "expense": 3.0,
          "expense_exact": "3"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "unchanged:original:t2:p76_77:bunlimited",
              "probability": 0.77,
              "probability_exact": "77/100",
              "posterior": 0.987012987012987,
              "posterior_exact": "76/77"
            },
            {
              "sign": "-",
              "child": "unchanged:original:t2:p19_23:bunlimited",
              "probability": 0.23,
              "probability_exact": "23/100",
              "posterior": 0.8260869565217391,
              "posterior_exact": "19/23"
            }
          ],
          "value": 48.0,
          "value_exact": "48",
          "expense": 7.0,
          "expense_exact": "7"
        }
      ],
      "posterior": 0.95,
      "posterior_exact": "19/20",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 55.0,
      "value_exact": "55"
    },
    {
      "id": "unchanged:original:t1:p19_23:bunlimited",
      "preset_id": "unchanged",
      "contract": "original",
      "t": 1,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 21.52173913043478,
          "value_exact": "495/23",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 42.608695652173914,
          "value_exact": "980/23",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "unchanged:original:t2:p19_23:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.8260869565217391,
              "posterior_exact": "19/23"
            },
            {
              "sign": "-",
              "child": "unchanged:original:t2:p19_23:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.8260869565217391,
              "posterior_exact": "19/23"
            }
          ],
          "value": 39.608695652173914,
          "value_exact": "911/23",
          "expense": 3.0,
          "expense_exact": "3"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "unchanged:original:t2:p19_20:bunlimited",
              "probability": 0.6956521739130435,
              "probability_exact": "16/23",
              "posterior": 0.95,
              "posterior_exact": "19/20"
            },
            {
              "sign": "-",
              "child": "unchanged:original:t2:p19_35:bunlimited",
              "probability": 0.30434782608695654,
              "probability_exact": "7/23",
              "posterior": 0.5428571428571428,
              "posterior_exact": "19/35"
            }
          ],
          "value": 36.08695652173913,
          "value_exact": "830/23",
          "expense": 7.0,
          "expense_exact": "7"
        }
      ],
      "posterior": 0.8260869565217391,
      "posterior_exact": "19/23",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 42.608695652173914,
      "value_exact": "980/23"
    },
    {
      "id": "unchanged:original:t1:p76_77:bunlimited",
      "preset_id": "unchanged",
      "contract": "original",
      "t": 1,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 24.74025974025974,
          "value_exact": "1905/77",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 58.701298701298704,
          "value_exact": "4520/77",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "wait",
          "branches": [
            {
              "sign": "+",
              "child": "unchanged:original:t2:p76_77:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.987012987012987,
              "posterior_exact": "76/77"
            },
            {
              "sign": "-",
              "child": "unchanged:original:t2:p76_77:bunlimited",
              "probability": 0.5,
              "probability_exact": "1/2",
              "posterior": 0.987012987012987,
              "posterior_exact": "76/77"
            }
          ],
          "value": 55.701298701298704,
          "value_exact": "4289/77",
          "expense": 3.0,
          "expense_exact": "3"
        },
        {
          "action": "test",
          "branches": [
            {
              "sign": "+",
              "child": "unchanged:original:t2:p304_305:bunlimited",
              "probability": 0.7922077922077922,
              "probability_exact": "61/77",
              "posterior": 0.9967213114754099,
              "posterior_exact": "304/305"
            },
            {
              "sign": "-",
              "child": "unchanged:original:t2:p19_20:bunlimited",
              "probability": 0.2077922077922078,
              "probability_exact": "16/77",
              "posterior": 0.95,
              "posterior_exact": "19/20"
            }
          ],
          "value": 51.701298701298704,
          "value_exact": "3981/77",
          "expense": 7.0,
          "expense_exact": "7"
        }
      ],
      "posterior": 0.987012987012987,
      "posterior_exact": "76/77",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 58.701298701298704,
      "value_exact": "4520/77"
    },
    {
      "id": "unchanged:original:t2:p19_20:bunlimited",
      "preset_id": "unchanged",
      "contract": "original",
      "t": 2,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 24.0,
          "value_exact": "24",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 55.0,
          "value_exact": "55",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.95,
      "posterior_exact": "19/20",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 55.0,
      "value_exact": "55"
    },
    {
      "id": "unchanged:original:t2:p19_23:bunlimited",
      "preset_id": "unchanged",
      "contract": "original",
      "t": 2,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 21.52173913043478,
          "value_exact": "495/23",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 42.608695652173914,
          "value_exact": "980/23",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.8260869565217391,
      "posterior_exact": "19/23",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 42.608695652173914,
      "value_exact": "980/23"
    },
    {
      "id": "unchanged:original:t2:p19_35:bunlimited",
      "preset_id": "unchanged",
      "contract": "original",
      "t": 2,
      "optimal_actions": [
        "limited"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 15.857142857142858,
          "value_exact": "111/7",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 14.285714285714286,
          "value_exact": "100/7",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.5428571428571428,
      "posterior_exact": "19/35",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 15.857142857142858,
      "value_exact": "111/7"
    },
    {
      "id": "unchanged:original:t2:p304_305:bunlimited",
      "preset_id": "unchanged",
      "contract": "original",
      "t": 2,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 24.934426229508198,
          "value_exact": "1521/61",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 59.67213114754098,
          "value_exact": "3640/61",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.9967213114754099,
      "posterior_exact": "304/305",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 59.67213114754098,
      "value_exact": "3640/61"
    },
    {
      "id": "unchanged:original:t2:p76_77:bunlimited",
      "preset_id": "unchanged",
      "contract": "original",
      "t": 2,
      "optimal_actions": [
        "full"
      ],
      "options": [
        {
          "action": "limited",
          "branches": [],
          "value": 24.74025974025974,
          "value_exact": "1905/77",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "full",
          "branches": [],
          "value": 58.701298701298704,
          "value_exact": "4520/77",
          "expense": 0.0,
          "expense_exact": "0"
        },
        {
          "action": "stop",
          "branches": [],
          "value": 0.0,
          "value_exact": "0",
          "expense": 0.0,
          "expense_exact": "0"
        }
      ],
      "posterior": 0.987012987012987,
      "posterior_exact": "76/77",
      "remaining_allowance": null,
      "remaining_allowance_exact": null,
      "value": 58.701298701298704,
      "value_exact": "4520/77"
    }
  ]
}
